ORANGE
DOCKET NO. 177 – Cellco Partnership d/b/a Bell Atlantic NYNEX Mobile for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a cellular telecommunications facility in Orange, Connecticut. Withdrawn.
DOCKET NO. 177A – An amended application of Cellco Partnership d/b/a Bell Atlantic Mobile for a Certificate of Environmental Compatibility and Public Need for a two cell-site configuration in the Town of Orange. The proposed Prime A site would be located approximately 875 feet east of Orange Center Road at the rear of the High Plains Community Center, 525 Orange Center Road, with the Prime B site located approximately 400 feet northwest from the end of Ogg Meadow Road. These sites would replace the previously proposed Camp Cedarcrest site. A proposed alternate site is located within a 5.5 acre parcel of property approximately 250 feet south and west of Robert Treat Drive Extension, Orange, Connecticut. (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 215 – James E. Dwyer Co., Inc. application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a cellular telecommunications facility at 700 Wheeler's Farms Road, or 716 Wheeler's Farms Road, Orange, Connecticut. Withdrawn.
DOCKET NO. 262 – Sprint Spectrum, L.P. d/b/a Sprint PCS application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a wireless telecommunications facility at 707 Cranberry Lane or off of Grassy Hill Road, Orange, Connecticut. (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 272 – The Connecticut Light and Power Company and The United Illuminating Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV electric transmission line and associated facilities between the Scovill Rock Switching Station in Middletown and the Norwalk Substation in Norwalk, Connecticut. This includes construction of the Beseck Switching Station in Wallingford, East Devon Substation in Milford, and Singer Substation in Bridgeport and modifications to the Scovill Rock Switching Station and the Norwalk Substation and certain interconnections. (Orange) (Findings of Fact), (Appendix A), (Appendix B), (Appendix C), (Opinion), (Decision and Order), (Record).
DOCKET NO. 406 – United Illuminating Certificate of Environmental Compatibility and Public Need for the construction, operation and maintenance of a telecommunications facility located at 100 Marsh Hill Road, Orange, Connecticut. (Record), (Findings of Fact), (Opinion), (Decision and Order).
DOCKET NO. 448 – Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Orange Tax Assessor Map 77, Block 3, Lot 1, 831 Derby Milford Road, Orange, Connecticut. (Record), WITHDRAWN 09/25/15
DOCKET NO. 508 – The United Illuminating Company (UI) application for a Certificate of Environmental Compatibility and Public Need for the Milvon to West River Railroad Transmission Line 115-kV Rebuild Project that consists of the relocation and rebuild of its existing 115- kilovolt (kV) electric transmission lines from the railroad catenary structures to new steel monopole structures and related modifications to facilitate interconnection of the rebuilt 115-kV electric transmission lines at UI’s existing Milvon, Woodmont, Allings Crossing, Elmwest and West River substations along approximately 9.5 miles of the Connecticut Department of Transportation’s Metro-North Railroad corridor traversing the municipalities of Milford, Orange, West Haven and New Haven, Connecticut. (Findings of Fact) (Opinion) and (Decision and Order)
DOCKET NO. 523 – The Towers, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 425 Old Tavern Road, Orange, Connecticut. Withdrawn 10/07/24
PETITION NO. 115 – United Illuminating declaratory ruling that no Certificate of Environmental Compatibility and Public need is required for reconductoring and reinsulating approximately 11.8 miles of 115-kV line between its West River and Baird Substation, excluding the Mildale Substation to Devon Substation section. Staff Report Approved 10/09/84
PETITION NO. 132 – Northeast Utilities Service Company petition for modifications to Cook Hill Junction-Devon 115-kV line in Hamden and Orange. Staff Report Approved 08/20/85
PETITION NO. 133 – Northeast Utilities Service Company petition for modifications to the Hanover-Devon Substation 115-kV line in Cheshire, Bethany, Woodbridge, Orange, and Milford. Staff Report Approved 08/20/85
PETITION NO. 297 – The Connecticut Light and Power Company petition for proposed modifications of the Devon Substation to Pease Road Junction 115-kV transmission line in Milford, Orange and Woodbridge. Staff Report Approved 02/25/93
PETITION NO. 330 – Metro Mobile CTS of New Haven, Inc. petition for the proposed installation of a microcell unit in an existing building. Withdrawn 09/21/94
PETITION NO. 339A – Connecticut Light and Power Company petition that no Certificate of Environmental Compatibility and Public Need is required for installation of a fiber optic cable and associated structural changes along several 115-kV and 345-kV transmission corridors in the Towns of Berlin, Bethany, Cheshire, Hamden, Meriden, Milford, Orange, Wallingford, and Woodbridge. Staff Report Approved 04/02/98
PETITION NO. 438 – United Illuminating declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of transmitters and receivers associated with a remote network meter reading system within UI's service area. Staff Report Approved 11/09/99
PETITION NO. 442 – Tennessee Gas Pipeline Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of main line regulation in East Granby and the installation of an additional connection at the Southern Connecticut-Milford delivery point in Orange, Connecticut. Staff Report Approved 12/20/99
PETITION NO. 486 – VoiceStream Wireless, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located at 289 Bittersweet Road, Orange, Connecticut. Staff Report 1Staff Report 2 Approved 12/19/02
PETITION NO. 1043 – New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a wireless telecommunications facility on an existing Connecticut Light and Power Company-owned transmission structure located at 525 Overland Drive, Orange, Connecticut. Staff Report Approved 12/27/12
PETITION NO. 1063 – New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a telecommunications facility at an existing Connecticut Light and Power Company transmission structure located at 298 Ridge Road, Orange, Connecticut. Staff Report Approved 6/27/13
PETITION NO. 1107 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to install a rooftop telecommunications tower located at 58 Robinson Boulevard, Orange, Connecticut. Filing Staff Report Approved 07/07/14
PETITION NO. 1298 – Bloom Energy Corporation, as an agent for Home Depot, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200 Kilowatt Fuel Cell Facility and a 100 Kilowatt Auxiliary Battery Storage Facility to be located at the Home Depot building, 440 Boston Post Road, Orange, Connecticut. Approved 05/25/17
PETITION NO. 1466 – CF Orange Old Tavern LLC Greenskies Clean Energy LLC petition for declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 2.5-megawatt AC solar photovoltaic electric generating facility located at Treat Farm, 361 Old Tavern Road, Orange, Connecticut, and associated electrical interconnection. Approved 01/13/22
PETITION NO. 1504 – New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small wireless facility on a new 41-foot 3-inch AT&T-owned utility pole that is not used principally for electric distribution service and associated equipment to be located along the public right-of-way adjacent to 45 Connair Road, Orange, Connecticut. Approved 06/09/22
EM-CROWN-107-990526 – Crown Communications notice of intent to modify an existing telecommunications facility located on Ogg Meadow Road in Orange.
EM-AT&T-107-991213 – AT&T Wireless PCS notice of intent to modify an existing telecommunications facility located at 525 Orange Center Road in Orange, Connecticut. Complete File
EM-METRICOM-107-001107 – Metricom, Inc. notice of intent to modify an existing telecommunications facility located at Ogg Meadow, Orange, Connecticut.
EM-XM-107-001205 – XM Satellite Radio notice of intent to modify an existing telecommunications facility located at Ogg Meadow Road, Orange, Connecticut.
TS-SPRINT-107-010831 – Sprint Spectrum, L.P. request for an order to approve tower sharing at a telecommunications facility to be located at Orange Transfer Station, South Orange Center Road, Orange, Connecticut. Complete File
EM-AT&T-015-034-083-084-097-103-107-135-167-020131 – AT&T Wireless notice of intent to modify existing telecommunications facilities located in Bridgeport, Stamford, Milford, Danbury, Middletown, Orange, Newtown, Norwalk, and Woodbridge, Connecticut. Orange Center Road-Orange filing
EM-AT&T-097-107-117-130-148-156-161-164-020124 – AT&T Wireless notice of intent to modify existing telecommunications facilities located at twelve sites throughout the State of Connecticut. Ogg Meadow Road Filing
EM-VER-107-020222 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at Orange Center Road, Orange, Connecticut.
TS-VER-107-020508 – Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at South Orange Center Road, Orange, Connecticut. Complete File
EM-CING-014-060-062-093-107-020731 – SNET Mobility, LLC notice of intent to modify existing telecommunications facilities located in Branford, Guilford, Hamden, New Haven, and Orange, Connecticut. Complete Ogg Meadow Rd. and Orange Center Rd., Orange Filings
EM-AT&T-"UNIVERSAL"-030221 – AT&T Wireless PCS LLC d/b/a AT&T Wireless notice of intent to modify existing telecommunications facilities throughout Connecticut.
EM-AT&T-168-107-049-027-030903 – AT&T Wireless notice of intent to modify existing telecommunications facilities located at 478 Good Hill Road, Woodbury, Connecticut, South Orange Center Road, Orange, Connecticut, 279 King Street, Enfield, Connecticut, and 48 Cow Hill Road, Clinton, Connecticut.