DOCKET NO. 5 - Connecticut Light and Power Company Certificate for a 245-kV transmission line and a 115-kV transmission line between points in the Towns of New Milford and Bethel. (Findings of Fact), (Opinion), (Concurring Opinion), and (Decision and Order).
DOCKET NO. 111 - Waste Management of Connecticut, Inc. and Bio-Energy Partners Certificate for the construction of a 3.33 MW electric generating landfill gas management facility off Route 7 in the New Milford landfill. (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 119 - SNET Cellular, Inc. Certificate for cellular telephone towers and associated equipment in the Towns of Plymouth, Harwinton, Winchester, and New Milford. Dismissed.
DOCKET NO. 134B - Iroquois Gas Transmission System, L.P. Amended Certificate to construct, operate, and maintain an interstate natural gas transmission pipeline from Sherman to Milford and Long Island Sound. (New Milford) (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 138 - SNET Cellular, Inc. Certificate of cellular facilities in the Towns of Plymouth, Harwinton, Winchester, and Aspetuck Avenue in New Milford. (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 156 - Litchfield County Cellular, Inc. Certificate for cellular telecommunications towers and equipment on Pine Hill west of South Street, Plymouth; on Wallens Hill north of Oakdale Avenue, Winsted; east of Loon Meadow Road, Norfolk; north of Sunnyside Avenue, Watertown; and on Town Hill south of Legion Road, New Milford. (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 193 - An application by New Milford Energy LLC for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of an electric generating facility located on a 28-acre parcel of land west of the intersection of Route 7 and Rocky River Road in the Town of New Milford, Connecticut. (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 233 - Sprint Spectrum, L.P. application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a cellular telecommunications facility at 399 Chestnut Land Road, New Milford, Connecticut. (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 285 - Sprint Spectrum, L.P., d/b/a Sprint PCS application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a telecommunications facility at 33 Boardman Road, New Milford, Connecticut. (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 342 - Optasite Towers LLC and Omnipoint Communications, Inc. application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a telecommunications facility located at 425 Litchfield Road, New Milford, Connecticut. (Record), (Findings of Fact), (Opinion), (Decision and Order).
DOCKET NO. 347 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a telecommunications facility located at 700 Kent Road, New Milford, Connecticut. (Record), (Findings of Fact), (Opinion), (Decision).
DOCKET NO. 355 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a telecommunications facility located at 359 Litchfield Road, New Milford, Connecticut. (Record), (Findings of Fact), (Opinion), (Decision and Order).
DOCKET NO. 444 – New Cingular Wireless PCS, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at the FirstLight Hydro Generating Company property, New Milford Tax Assessor Map 83, Lot 4, Kent Road, New Milford, Connecticut. (Record), (Findings of Fact), (Opinion), (Decision and Order)CERTIFICATE EXPIRED 12/31/18
PETITION NO. 10 - Connecticut Light and Power Company petition for the changes to the existing 69-kV line from Rocky River hydroelectric plant to the Bulls Bridge hydro electric plant in Brookfield. Staff Report. Approved 12/1/72
PETITION NO. 11 - Connecticut Light and Power Company petition for reinsulating existing sections of 69-kV line from Brookfield Junction and from West Brookfield Junction northerly to the Rocky River hydro plant in New Milford. Staff Report. Approved 12/1/72
PETITION NO. 12 - Connecticut Light and Power Company petition for reconductoring and replacing the structures on the two existing 69-kV circuits from the Carmel Hill Substation in Woodbury westerly to the Rocky River Substation in New Milford. (Washington) Staff Report. Approved 1/26/73
PETITION NO. 111 - New Milford Cablevision Company petition for the modification of a CATV headend facility, off Ridge Road. Staff Report. Approved 9/23/84
PETITION NO. 173 - Northeast Utilities petition to relocate a section of wood pole 34-kV and 115-kV lines around a sanitary land fill in New Milford. Staff Report. Approved 1/12/87
PETITION NO. 285 - The Connecticut Light and Power Company (CL&P) petition for the proposed modification of an existing CL&P 345-kV line adjacent to the New Milford landfill west of Route 7. Staff Report. Approved 9/4/92
PETITION NO. 337 - The Connecticut Light and Power Company petition for modifications to existing 115-kV transmission lines at Stony Hill Substation in Brookfield. (New Milford) Staff Report. Approved 2/9/95
PETITION NO. 476 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed changes at Connecticut Light & Power Company’s Long Mountain Substation located off Long Meadow Road, New Milford, Connecticut. Staff Report. Approved 8/31/00.
PETITION NO. 485 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modification of an existing Connecticut Light and Power electric transmission facility located at Route 202, Russeling Road, New Milford, Connecticut. Staff Report. Approved 11/14/00.
PETITION NO. 508 - Northeast Utilities Service Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed installation of a 115-kV capacitor bank and associated equipment to the existing Connecticut Light and Power Company Rocky River Substation, located on Route 7, New Milford, Connecticut. Staff Report. Approved 5/10/01
PETITION NO. 517 - Sprint Spectrum L.P. (Sprint PCS) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to an existing Connecticut Light & Power Company electric transmission facility located at 18 Hilltop View Lane, New Milford, Connecticut. Staff Report. Approved 7/11/01.
PETITION NO. 675 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that a Certificate of Environmental Compatibility and Public Need is not required for the modification of an existing CL&P transmission structure off Hilltop View Lane, New Milford, Connecticut. Staff Report. Approved 06/09/04.
PETITION NO. 685 - Nextel Communications Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to Connecticut Light & Power’s Pole Structure # 10184 and Electric Transmission Line # 1618 in the Town of New Milford, Connecticut. Tabled 08/26/04.
PETITION NO. 709 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to the Long Mountain 13J Switching Station in New Milford, Connecticut. Staff Report. Approved 04/19/05.
PETITION NO. 723 – New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 5 Old Town Park Road, New Milford, Connecticut. Staff Report. Approved 07/20/05.
PETITION NO. 813 - Kimberly-Clark Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance, and operation of a combined heat and power electric generating facility, located at 58 Pickett District Road, New Milford, Connecticut. Staff Report. Decision Letter.Approved 6/07/07.
PETITION NO. 839 – The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need for a modification to an existing 345/115-kV Switching Station located on Long Mountain Road, New Milford, Connecticut. Staff Report. Staff Report for Revised Plan. Approved 2/28/08. Revision Approved 8/28/08.
PETITION NO. 977 - The Connecticut Light and Power Company notice of intent to modify an existing telecommunications facility located at 26 Chapin Road, New Milford, Connecticut. Staff Report. Approved 11/05/10
PETITION NO. 1144 – 2014 ESA Project Company LLC Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200-Kilowatt Fuel Cell to be located at the Home Depot store at 104 Danbury Road, New Milford, Connecticut. Decision Letter and Staff Report. Request for Revision. Revision Decision. Notice of Completion Transfer of Site Ownership and Control and Council AcknowledgementApproved 04/16/15.
PETITION NO. 1216 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to its existing Long Mountain Switching Station located at Long Mountain Road, New Milford, Connecticut and the reconductoring of approximately 5.3 miles of its existing No. 398 345-kV transmission line from Long Mountain Switching Station to the New York/Connecticut state line in New Milford, Sherman, and Kent, Connecticut, and related transmission line structure improvements. Approved 03/31/16.
SUB-PETITION NO. 1293-NMWRWW-01 (New Milford, Washington, Roxbury, Woodbury and Watertown) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Amendment Request Council Decision on Amendment Request Completion Letter
SUB-PETITION NO. 1293-NM-01 (New Milford) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Decision Notice of Completion
SUB-PETITION NO. 1293-NM-02 (New Milford) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Decision Notice of Completion
SUB-PETITION NO. 1293-NM-03 (New Milford) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Decision Amendment Request and Council Decision on Amendment Notice of Completion
SUB-PETITION NO. 1293-NMWRWW-02 (New Milford, Washington, Roxbury, Woodbury and Watertown) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Completion
SUB-PETITION NO. 1293-NM-05 (New Milford) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Completion
PETITION NO. 1312 - Candlewood Solar LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance and operation of a 20 megawatt AC (26.5 megawatt DC) solar photovoltaic electric generating facility located on a 163 acre parcel at 197 Candlewood Mountain Road and associated electrical interconnection to Eversource Energy’s Rocky River Substation on Kent Road in New Milford, Connecticut. (Findings of Fact) (Opinion) (Decision and Order) Approved 12/21/17 Court-ordered Remand Regarding Visibility (Remand Findings of Fact) (Remand Opinion)
PETITION NO. 1314 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed 1555 Line Rebuild Project consisting of the structure and conductor replacements on its existing 115-kilovolt electric transmission line extending approximately 6.6 miles within existing Eversource electric transmission line right-of-way between the existing Bulls Bridge Substation located at 781 Kent Road and the existing Rocky River Junction located off Boardman Road in New Milford, Connecticut. Approved 8/31/2017
PETITION NO. 1362 – Town of New Milford petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176, for a determination that the January 28, 2019 Development and Management Plan submitted by Candlewood Solar, LLC in Petition No. 1312 conflicts and/or is inconsistent with the Connecticut Siting Council’s December 21, 2017 final decision on Petition No. 1312. Link to Petition No. 1312Denied 04/25/19
PETITION NO. 1520- Generate DG Fuel Cell I Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 500-kilowatt fuel cell facility and associated equipment to be located at New Milford Hospital, 21 Elm Street, New Milford, Connecticut. Approved 8/4/22
Charter Communications notice of intent to modify an existing telecommunications facility located on Ridge Rd., New Milford.
CL&P notice of intent to modify an existing facility by CL&P’s installing a precast concrete equipment enclosure at New Milford radio site located on Chapin Rd., New Milford.
Dept. of Public Safety, Div. of State Police notice of intent to modify an existing telecommunications facility at the Northeast Utilities telecommunications facility off of Chapin Hill Rd., New Milford.
Dept. of Public Safety, Div. of State Police notice of intent to modify an existing telecommunications facility at Site #79A-Northeast Utilities facility, New Milford.
Springwich Cellular Ltd. Partnership notice of intent to modify existing telecommunications facilities located on Weingart Rd., Harwinton; Moses Mountain, Danbury; Parker Rd. East Haddam; Guinea Rd., Monroe; Orange St., New Haven; Aspetuck Ave, New Milford; Willard Rd, Norwalk; North St., Plymouth; Valcom Rd., Tolland; Oakdale Ave., Winchester.
Springwich Cellular Ltd. Partnership notice of intent to modify existing telecommunications facilities located on Aspetuck Ave., New Milford; off Fairfield Dr., Newtown; 405 Brushy Plain Rd., Branford; 4 Hoffmann Rd., Canton; Town Farm Rd., Enfield; Birch Mountain Rd., Glastonbury; Tanner Marsh Rd., Guilford; 139 Morris Hubbard Rd., Haddam; Mountain St., Hartford; Kikapoo Rd., Middlefield; 438 Bridgeport Ave., Milford; 170 Ingham Hill Rd., Old Saybrook; 391 Niederwerfer Rd., S. Windsor; 555 Main St., Stamford; Farmdale Dr., Waterbury; Miner La., Waterford; 180A Bayberry La., Westport.
EM-SPRINT-096-000203 - Sprint PCS notice of intent to modify an existing telecommunications facility located at 4 Elkington Farm Road in New Milford, Connecticut. Complete File
EM-SCLP-096-000928 - Springwich Cellular Limited Partnership (SCLP) notice of intent to modify an existing telecommunications facility located at 4 Elkington Farm Road, New Milford, Connecticut. Complete File
EM-SPECTRA-096-011005 - Spectrasite Communications, Inc. notice of intent to modify an existing telecommunications facility located at 4 Elkington Farm Road, New Milford, Connecticut. (Docket No. 138)
EM-AT&T-005-018-031-055-068-092-111-125-153-162-168-011121 - Edwards and Kelcey on behalf of AT&T Wireless notice of intent to modify existing telecommunications facilities located at twelve sites throughout the State of Connecticut. (4 Elkington Farm Road, New Milford)
TS-AT&T-096-020301 - AT&T Wireless notice of intent to modify an existing telecommunications facility located at 586 Danbury Road, New Milford, Connecticut.
EM-CING-068-096-098-020730 - SNET Mobility, LLC notice of intent to modify existing telecommunications facilities located Kent, New Milford, and Norfolk, Connecticut. Complete File
EM-CING-096-020730 - Southwestern Bell Mobile Systems LLC d/b/a Cingular Wireless notice of intent to modify existing telecommunications facilities located at 4 Elkington Farm Road, New Milford, Connecticut. Structural Update Revisions. (part of EM-CING-042-083-090-118-021113 - Southwestern Bell Mobile Systems LLC d/b/a Cingular Wireless notice of intent to modify existing telecommunications facilities located in East Hampton, Middletown, New Canaan, and Ridgefield, Connecticut.)
EM-T-MOBILE-"UNIVERSAL"-020830 - Omnipoint Facilities Network 2., L.L.C. and Omnipoint Communications, Inc., subsidiaries of T-Mobile USA, Inc. notice of intent to modify existing telecommunications facilities throughout Connecticut.
EM-VER-096-030926 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 4 Elkington Farm Road, New Milford, Connecticut. Complete File
EM-VER-096-110425 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at Hilltop View Lane, New Milford, Connecticut.
EM-T-MOBILE-096-150615 - T-Mobile notice of intent to modify an existing telecommunications facility located at 596 Danbury Road, New Milford, Connecticut. Decision. Completion Letter.
EM-EVER-096-160510e - Eversource Energy notice of intent to modify an existing energy facility located at 781 Kent Road, New Milford, Connecticut. Decision. Completion Letter.
EM-AT&T-096-160802 - AT&T notice of intent to modify an existing telecommunications facility located at 5 Old Town Park Road, New Milford, Connecticut. Decision. Completion
EM-AT&T-096-161003 – AT&T notice of intent to modify an existing telecommunications facility located at 33 Boardman Road, New Milford, Connecticut. Decision-Denial.
EM-CING-096-170130 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 4 Elkington Farm Road, New Milford, Connecticut. Decision Completion Letter
EM-T-MOBILE-096-170131 – T-Mobile notice of intent to modify an existing telecommunications facility located at 33 Boardman Road, New Milford, Connecticut. Decision Completion Letter
EM-AT&T-096-170306 - AT&T Wireless notice of intent to modify an existing telecommunications facility located at 33 Boardman Road, New Milford, Connecticut. Narrative Correction Incomplete Response to Incomplete Decision Completion Letter
EM-SPRINT-096-170928 - Sprint notice of intent to modify an existing telecommunications facility located at 399 Chestnut Land Road, New Milford, Connecticut. Decision Completion Letter
EM-SPRINT-096-180305 – Sprint notice of intent to modify an existing telecommunications facility located at 86 Boardman Road, New Milford, Connecticut. Incomplete Letter Response to Incomplete Letter Council Receipt of Incomplete Response Decision Completion Letter
EM-VER-096-180821 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 4 Elkington Road, New Milford, Connecticut. Decision Completion Letter
EM-CING-096-180910 – AT&T notice of intent to modify an existing telecommunications facility located at 4 Elkington Farm Road, New Milford, Connecticut. Decision Completion Letter Completion Status Sheet
EM-AT&T-096-181116 - AT&T notice of intent to modify an existing telecommunications facility located at 33 Boardman Road, New Milford, Connecticut. Decision Completion Letter
EM-AT&T-096-190618 - AT&T Mobility (AT&T) notice of intent to modify an existing telecommunications facility located at 5 Old Town Park Road, New Milford, Connecticut. Decision Extension Request and Council Denial see EM-AT&T-096-201026
EM-T-MOBILE-096-190725 - T-Mobile notice of intent to modify an existing telecommunications facility located at 33 Boardman Road, New Milford, Connecticut. Decision Completion Letter Condition Submission
EM-AT&T-096-190725 – AT&T notice of intent to modify an existing telecommunications facility located at 399 Chestnut Land Road, New Milford, Connecticut. Decision Notice of Construction Completion
EM-SPRINT-096-191015 - Sprint notice of intent to modify an existing telecommunications facility located at 18 Hilltop View Lane, New Milford, Connecticut. Decision Will Not Complete
EM-VER-096-200316 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located off of Canterbury Road (a/k/a 4 Elkington Farm), New Milford, Connecticut. Incomplete Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion
EM-EVER-096-200724 – The Connecticut Light and Power Company d/b/a Eversource Energy notice of intent to modify an existing telecommunications facility located at 26 Chapin Road, New Milford, Connecticut. Decision Notice of Construction Completion
EM-T-MOBILE-096-200729 - T-Mobile notice of intent to modify an existing telecommunications facility located at 33 Boardman Road, New Milford, Connecticut. Decision Notice of Construction Completion
EM-AT&T-096-201026 - AT&T Mobility (AT&T) notice of intent to modify an existing telecommunications facility located at 5 Old Town Park Road, New Milford, Connecticut. Decision Notice of Construction Completion
EM-T-MOBILE-096-201207 - T-Mobile notice of intent to modify an existing telecommunications facility located at 125 Ridge Road, New Milford, Connecticut. Decision Request for Extension and Council Decision Notice of Construction Completion
EM-T-MOBILE-096-210429 - T-Mobile notice of intent to modify an existing telecommunications facility located at Chestnut Land Road (a/k/a 399 Chestnut Land Road), New Milford, Connecticut. Decision Will Not Complete
EM-VER-096-210811 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 33 (a/k/a 86) Boardman Road, New Milford, Connecticut. Decision Notice of Construction Completion
EM-VER-096-210820 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 399 Chestnut Land Road, New Milford, Connecticut. Decision Notice of Construction Completion
EM-VER-096-210929 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at Canterbury Road (a/k/a 4 Elkington Farm Road), New Milford, Connecticut. Decision Request for Extension and Council Extension Approval Additional Extension Request and Council Extension Approval Notice of Construction Commencement Notice of Construction Completion
EM-T-MOBILE-096-211227 – T-Mobile notice of intent to modify an existing telecommunications facility located at Canterbury Road (a/k/a 4 Elkington Farm Road), New Milford, Connecticut. Decision Notice of Construction Completion
TS-DISH-096-211202 - Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at Canterbury Road (a/k/a 4 Elkington Farm Road), New Milford, Connecticut. Town Letter Supplemental Submission Decision Notice of Construction Completion
EM-T-MOBILE-096-220316 – T-Mobile notice of intent to modify an existing telecommunications facility located at 399 Chestnut Land Road, New Milford, Connecticut. Decision Notice of Construction Completion
TS-DISH-096-220325 - Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 399 Chestnut Land Road, New Milford, Connecticut. Town Letter Decision Notice of Completion
EM-T-MOBILE-096-220607 - T-Mobile notice of intent to modify an existing telecommunications facility located at 425 Litchfield Road, New Milford, Connecticut. Decision Notice of Completion
EM-T-MOBILE-096-220916 - T-Mobile notice of intent to modify an existing telecommunications facility located at 18 Hilltop View Lane, New Milford, Connecticut. Decision Condition Submission Notice of Construction Commencement Notice of Construction Completion
TS-DISH-096-230221 - Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 425 Litchfield Road, New Milford, Connecticut. Town Letter Decision Extension Request and Council Extension Approval
EM-T-MOBILE-096-230620 – T-Mobile notice of intent to modify an existing telecommunications facility located at 596 Danbury Road, New Milford, Connecticut. Decision Notice of Construction Completion
EM-VER-096-230913 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 33 (a/k/a 86) Boardman Road, New Milford, Connecticut. Decision Notice of Construction Commencement Notice of Construction Completion
EM-ATT-096-231012 - AT&T notice of intent to modify an existing telecommunications facility located at 33 Boardman Road, New Milford, Connecticut. Decision Notice of Construction Completion
EM-EVER-096-231017 - The Connecticut Light and Power Company d/b/a Eversource Energy notice of intent to modify an existing telecommunications facility located at 26 Chapin Road, New Milford, Connecticut. Decision Notice of Construction Commencement Notice of Completion
EM-VER-096-231109 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at Canterbury Road (a/k/a 4 Elkington Farm Road), New Milford, Connecticut. Decision Notice of Construction Commencement Notice of Construction Completion
EM-VER-096-240409 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 399 Chestnut Land Road, New Milford, Connecticut. Decision Notice of Construction Commencement
EM-ATT-096-240611 - New Cingular Wireless, PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at Canterbury Road (a/k/a 4 Elkington Farm Road), New Milford, Connecticut. Decision Notice of Construction Completion