Town of Naugatuck
DOCKET NO. 56 – Metro Mobile CTS of New Haven, Inc. application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of facilities to provide cellular service in New Haven County. (Findings of Fact) (Opinion) (Dissenting Opinion) and (Decision and Order)
DOCKET NO. 56A – Metro Mobile CTS of New Haven, Inc. Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of facilities to provide cellular service in New Haven County; amendment resolution. (Findings of Fact) (Opinion) (Dissenting Opinion) and (Decision and Order)
DOCKET NO. 533 – Tarpon Towers III, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility and associated equipment located at 161 Conrad Street, Naugatuck, Connecticut. (Findings of Fact) (Opinion) (Decision and Order) Approved 08/07/25
PETITION NO. 158HW – Uniroyal Chemical petition for use of an existing Elm Street building as a staging area for bulking of packaged waste into larger containers in Naugatuck. Denied 07/11/86
PETITION NO. 372HW – Uniroyal Chemical Company petition for a declaratory ruling that no Certificate of Public Safety and Necessity is required for changes to the existing Uniroyal Chemical facility in Naugatuck. Staff Report Approved 06/16/97
PETITION NO. 426HW – Uniroyal Chemical Company, Inc. petition that no Certificate of Public Safety and Necessity is required to close certain hazardous waste container storage areas and refurbish a hazardous waste storage building located at 280 Elm Street in Naugatuck. Staff Report Approved 08/31/99
PETITION NO. 623T – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and relocation of an existing telecommunications located at 585 New Haven Road, Naugatuck, Connecticut. Staff Report Approved 05/06/03
PETITION NO. 854 – PPL Savage Alert, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of an ORMAT Energy Converter (OEC) at the Naugatuck Wastewater Treatment Facility located at 500 Cherry Street, Naugatuck, Connecticut. Staff Report Approved 04/24/08
PETITION NO. 973 – American Towers LLC declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to replace and expand an existing structure located at 880 Andrew Mountain Road, Naugatuck, Connecticut. RecordFindings of FactOpinionDecision and Order Approved 04/28/11
PETITION NO. 1241 – Cellco Partnership d/b/a Verizon Wireless Petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the attachment of a telecommunications facility to the northerly façade of an existing building located at 1247 New Haven Road, Naugatuck, Connecticut. Approved 08/04/16
PETITION NO. 1262 – Doosan Fuel Cell America, Inc. Doosan Energy Solutions America, Inc. declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of 1380-kilowatt customer-side combined heat and power fuel cell facility to be located at the Borough of Naugatuck Waste Water Treatment Plant, 500 Cherry Street Extension, Naugatuck, Connecticut. Approved 02/16/17
PETITION NO. 1319 – New Cingular Wireless, PCS, LLC (AT&T), as agent for American Tower Corporation, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed extension of an existing telecommunications facility located at 585 South Main Street, Naugatuck, Connecticut. Approved 09/28/17
PETITION NO. 1656 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed South Naugatuck Substation to Beacon Falls Junction Rebuild Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 4 miles of its existing electric transmission line right-of-way shared by its existing 115-kilovolt (kV) 1142, 1319, 1580, and 1808 Lines between South Naugatuck Substation and Beacon Falls Substation traversing the municipalities of Naugatuck, Beacon Falls, and Oxford, Connecticut, and related electric transmission line and substation improvements. Approved 08/21/25
PETITION NO. 1660 – TA Solar 335 LLC (TRITEC Americas, LLC) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.90-megawatt AC solar photovoltaic electric generating facility and associated equipment located on two parcels (Parcel Nos. 051-7700 and 051-7900) at 0 Hunters Mountain Road, Naugatuck, Connecticut, and associated electrical interconnection. Denied 09/18/25
Bell Atlantic NYNEX Mobile – Antenna Upgrades - 45 Peach Orchard Road, Naugatuck, Connecticut. November 22,1995 Antenna Upgrade Filing
TS-NEXTEL-088-991013 – Nextel Communications request for an order to approve tower sharing at an existing telecommunications facility located at 280 Elm Street in Naugatuck.
TS-BAM-088-000828 – Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 280 Elm Street, Naugatuck, Connecticut.
EM-AT&T-088-020325 – AT&T Wireless notice of intent to modify an existing telecommunications facility located at 280 Elm Street, Naugatuck, Connecticut.
TS-T-MOBILE-088-250807 – T-Mobile request for an order to approve tower sharing at an existing telecommunications facility located at 880 Andrew Mountain Road, Naugatuck, Connecticut. Town Letter Decision Notice of Construction Commencement