Town of Montville
DOCKET NO. 12 – CL&P application for a Certificate of Environmental Compatibility and Public Need with respect to the construction of an overhead 345 kV electric transmission line between the Millstone Point generating station, in Waterford, and the Manchester substation, in Manchester. (Findings of Fact) (Opinion) (Dissenting Opinion) and (Decision and Order)
DOCKET NO. 25 – Connecticut Light and Power Company and Hartford Electric Light Company Certificate with respect to the construction of an overhead 345-kV electric transmission line between the Millstone Point generating station in Waterford, and the Manchester Substation in Manchester. (Findings of Fact) (Opinion) and (Decision and Order)
DOCKET NO. 61 – Applied Energy Services, Inc. Certificate for the construction of the AES Thames Cogeneration Plant in Montville. (Findings of Fact) (Opinion) and (Decision and Order)
DOCKET NO. 63 – Department of Environmental Protection Certificate for construction of microwave telecommunication towers in Glastonbury, and off I-395 in Montville. (Findings of Fact) (Opinion) and (Decision and Order)
DOCKET NO. 83 – The Connecticut Light and Power Company Certificate for a 115-kV underground transmission line to interconnect the AES Thames Cogeneration Project to the Montville Substation in Montville. (Findings of Fact) (Opinion) and (Decision and Order)
DOCKET NO. 201 – Mohegan Tribal Utility Authority application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 115 kV electric substation located west of an existing 115 kV transmission line right-of-way, north of Woodland Drive, and east of Interstate Route 395, in Montville, Connecticut. (Findings of Fact) (Opinion) and (Decision and Order)
DOCKET NO. 335 – MetroCast Communications of Connecticut, LLC Atlantic Broadband Finance, LLC and Atlantic Broadband (CT) LLC Certificate of Environmental Compatibility and Public Need for the Expansion of its existing CATV Headend facility located at 689 Old Colchester Road, Uncasville-Montville, Connecticut. (Record) (Findings of Fact) (Opinion) and (Decision and Order)
PETITION NO. 122 – Northeast Utilities Service Company petition for an Oil Drum Storage Building at Montville Generating Station. Staff Report Approved 02/01/85
PETITION NO. 150 – Northeast Utilities Service Company petition to install two new auxiliary steam boilers at Montville Generating Station. Staff Report Approved 02/19/86
PETITION NO. 182 – Connecticut Light and Power Company petition for a proposed addition of a new 115-kV underground cable termination, two 115-kV circuit breakers and associated equipment at Montville Substation. Staff Report Approved 05/13/87
PETITION NO. 183 – Connecticut Light and Power Company petition to construct a proposed 115-kV underground line from the AES Thames Cogenerator to Montville Substation. See Pet. 185, Denied 05/13/87
PETITION NO. 185 – Connecticut Light and Power Company petition to construct a proposed 115-kV underground line from the AES Thames Cogenerator to Montville Substation. Staff Report Denied 05/13/87
PETITION NO. 189 – Connecticut Light and Power Company petition to relocate two 69-kV lines at Montville Substation. Staff Report Approved 08/25/87
PETITION NO. 204HW – The Connecticut Light and Power Company petition for the construction of an aboveground concrete tank at Montville Generating Station. Staff Report Approved 03/22/88
PETITION NO. 205HW – The Connecticut Light and Power Company petition for replacement of a single lined surface impoundment with a two cell concrete tank at Montville Generating Station. Staff Report Approved 03/22/88
PETITION NO. 219 – The Stone Paperboard Corporation petition for a proposed 2.2 megawatt steam turbine cogeneration facility to be installed at its manufacturing plant. Staff Report Approved 11/21/88
PETITION NO. 226 – The Connecticut Light and Power Company petition for proposed changes to the fuel, stack height, and project schedule at Montville Generating Station. Staff Report Approved 12/19/88
PETITION NO. 228 – The Connecticut Light and Power Company petition for proposed additions at Uncasville 1Q Substation in Montville. Staff Report Approved 02/14/89
PETITION NO. 248 – The Connecticut Light and Power Company petition for proposed modifications to the Montville-Dudley-Bean Hill 115-kV lines in Montville and Norwich. Staff Report Approved 02/25/91
PETITION NO. 258 – The Connecticut Light and Power Company petition for proposed modifications to the Horton Cove Crossing of the Montville-Whipple Junction 115-kV transmission line.
PETITION NO. 278 – Northeast Utilities Service Company and the City of Groton Department of Utilities petition for proposed modifications to existing 69-kV transmission lines and substations in Montville, Ledyard, Preston, and Groton. Staff Report Approved 01/06/92
PETITION NO. 315 – Northeast Utilities Service Company petition for proposed additions to the Uncasville Substation off Haley Road in Montville. Staff Report Approved 01/12/94
PETITION NO. 331 – Northeast Utilities Service Company petition for proposed modifications to existing transmission line towers at the Thames River in Montville, and at the Housatonic River in the Towns of Stratford and Milford. Staff Report Approved 10/20/94
PETITION NO. 364 – CL&P petition that no Certificate of Environmental Compatibility and Public Need is required for proposed additions to the CL&P’s Montville Substation in the Town of Montville. Staff Report Approved 11/21/96
PETITION NO. 392 – Algonquin Gas Transmission Company petition for a Declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to install a 1.5 mile extension of Algonquin Gas Transmission Company's E-System Loop located in Norwich and Montville. Staff Report Approved 06/11/98
PETITION NO. 503 – Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to the Montville - Dudley - Bean Hill transmission line in Montville, Connecticut. Staff Report Approved 04/12/01
PETITION NO. 532 – Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need (Certificate) is required for the modification of the existing CL&P line between CL&P's Montville Substation and the Mohegan Tribal Utility Authority's Fort Hill Farms Substation, Montville, Connecticut. Staff Report Approved 12/11/02
PETITION NO. 575 – AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 57 Cook Road, Montville, Connecticut. Staff Report Approved 09/05/02
PETITION NO. 717 – Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of an emergency generator and associated equipment at CL&P’s Montville Substation. Staff Report Approved 07/20/05
PETITION NO. 824 – The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement of an existing telecommunications facility located on Chapel Hill Road, Montville, Connecticut. Staff Report Approved 07/26/07
PETITION NO. 903 – The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to an existing CL&P switching station located at Haley Road, Montville, Connecticut. Staff Report Approved 08/13/09
PETITION NO. 907 – Montville Power LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the retrofit and operation of a 40 MW Biomass-Fueled Generation Unit at the Montville Station in Montville, Connecticut. Record Findings of Fact Final Decision Approved 02/25/10
SUB-PETITION NO. 1293-WML-01 (Waterford-Montville-Lebanon) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Construction Completion
SUB-PETITION NO. 1293-HEHLELMW-01 (Haddam, East Haddam, Lyme, East Lyme, Montville and Waterford) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Decision Second Extension Request and Council Decision Third Extension Request and Council Decision Third Extension Request and Council Decision Amendment Request Amendment Decision Notice of Construction Completion
SUB-PETITION NO. 1293-LBMW-01 (Lebanon, Bozrah, Montville and Waterford) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Construction Completion
SUB-PETITION NO. 1293-LFBNM-01 (Lebanon-Franklin-Bozrah-Norwich-Montville) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements to comply with the updated National Electric Safety Code clearance requirements. Decision Minor Project Change and Council Decision Extension Request and Council Decision Access Road Request and Council Decision Modification Request and Council Decision Notice of Construction Completion
SUB-PETITION 1293-LBM-01 (Lebanon-Bozrah-Montville) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements to comply with the updated National Electric Safety Code clearance requirements. Decision Notice of Construction Completion
SUB-PETITION NO. 1293-LBMW-02 (Lebanon, Bozrah, Montville and Waterford) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Amendment Request Council Decision on Amendment Request Extension Request and Council Decision Notice of Construction Completion
PETITION NO. 1405 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Horton Cove Circuit Separation Project consisting of a partial rebuild and separation of approximately 1 mile of its existing No. 100 69-kilovolt (kV) and Nos. 1410, 1280, and 1355 115-kV electric transmission line structures within existing Eversource electric transmission line right-of-way between a location east of Depot Road to a point east of Point Breeze Road, Montville, Connecticut, and related electric transmission line structure improvements. Approved 07/16/20
PETITION NO. 1468 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Montville to Horton Cove Rebuild Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 0.6 mile of its existing Nos. 100 69-kilovolt (kV) and No. 1410 115-kV electric transmission lines within existing Eversource electric transmission line right-of-way between Horton Cove and Montville Substation in Montville, Connecticut, and related electric transmission line and substation improvements. Approved 01/27/22
PETITION NO. 1475 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Eastern Connecticut Reliability Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 2.1 miles of its existing Nos. 100 and 400 69-kilovolt (kV) and Nos. 1410 and 1280 115-kV electric transmission lines within existing Eversource electric transmission line right-of-way between Montville Junction, Montville and Ledyard Junction, Ledyard, Connecticut, and related electric transmission line and substation improvements. Approved 02/24/22
PETITION NO. 1492 – CT NSB ProjectCo LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.99-megawatt AC solar photovoltaic electric generating facility located at 486 Fitch Hill Road, Montville (Uncasville), Connecticut, and associated electrical interconnection. Approved 06/23/22
PETITION NO. 1545 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Wawecus Junction to Montville Junction Upgrade Project consisting of the replacement of electric transmission line structures along its existing 8-mile electric transmission line right-of-way shared by its existing 115-kilovolt (kV) Nos. 1000, 1070, 1080 and 1090 Lines between Wawecus Junction in Norwich and Montville Junction in Montville, Connecticut, and related electric transmission line and substation improvements. Approved 01/19/23
PETITION NO. 1593 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for the proposed Montville Substation to North of Kitemaug Road Rebuild Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 1.1 miles of its existing electric transmission line right-of-way shared by its existing 115-kilovolt (kV) 1090 and 1000 Lines between Montville Substation and approximately 1200 feet north of Kitemaug Road inMontville, Connecticut, and related electric transmission line and substation improvements. Approved 01/04/24
PETITION NO. 1601 – TRITEC Americas, LLC notice of election to waive exclusion from Connecticut Siting Council jurisdiction, pursuant to Connecticut General Statutes §16-50k(e), and petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 0.999-megawatt AC solar photovoltaic electric generating facility located at 958 Route 163, Montville, Connecticut, and associated electrical interconnection. Approved 05/09/24
PETITION NO. 1613 –The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed East Haddam Junction to Hunts Brook Junction Reliability Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 16.1 miles of its existing electric transmission line right-of-way shared by its existing 345-kilovolt (kV) 348 and 364 Lines between East Haddam Junction in East Haddam and Hunts Brook Junction in Montville, traversing the municipalities ofEast Haddam,Lyme, East Lyme, and Montville, Connecticut, and related electric transmission line and substation improvements. Approved 06/20/24
BAM notice of intent to modify an existing telecommunications facility located on Old Colchester Rd., Montville.
CL&P notice of intent to modify an existing telecommunications facility located on Chapel Hill Rd., Montville.
Eastern Connecticut Cable TV notice of intent to modify an existing telecommunications facility located on Gay Hill, Montville.
Dept. of Public Safety, Div. of State Police notice of intent to modify an existing telecommunications facility located at Troop E, Rt. 52, Montville.
Springwich Cellular Ltd. Partnership notice of intent to modify an existing telecommunications facility located on Old Colchester Rd., Montville.
Springwich Cellular Ltd. Partnership notice of intent to modify an existing telecommunications facility located at 57 Cook Drive in Uncasville (Montville).
EM-BAM-086-980821 – Bell Atlantic Mobile notice of intent to modify an existing telecommunications tower located at 57 Cook Drive, Montville.
EM-BAM-086-980925 – Bell Atlantic Mobile notice of intent to modify an existing telecommunications facility located off of Old Colchester Road in Montville.
EM-BAM-086-991124 – Cellco Partnership d/b/a Bell Atlantic Mobile notice of intent to modify an existing telecommunications tower located at 71 Moxley Hill Road in Montville.
EM-VOICESTREAM-086-000428 – VoiceSteam Wireless notice of intent to modify an existing telecommunications facility at the State Police Barracks, Troop E, located in Montville, Connecticut.
TS-SCLP-086-001006 – Springwich Cellular Limited Partnership (SCLP) request for an order to approve tower sharing at an existing telecommunications facility located at 376 Butlertown Road, Montville, Connecticut.
TS-VER-086-010328 – Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 557 Route 82, Montville, Connecticut.
TS-VER-086-011205 – Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 41 Beckwith Road, Oakdale (Montville), Connecticut.
TS-NORTHCOAST-086-011228 – Northcoast Communications, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 57 Cook Drive, Montville, Connecticut.
EM-AT&T-086-020701 – AT&T Wireless PCS, LLC d/b/a AT&T Wireless notice of intent to modify an existing telecommunications facility located at 71 Moxley Hill Road, Montville, Connecticut.
TS-AT&T-086-020703 – AT&T Wireless PCS, LLC d/b/a AT&T Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 57 Cook Road, Montville, Connecticut. Withdrawn - refiled as Petition. No. 575.
EM-CING-059-061-071-086-105-113-152-020731 – SNET Mobility, LLC notice of intent to modify existing telecommunications facilities located in Groton, Haddam, Lebanon, Montville, Old Lyme, Portland, Waterford, Connecticut.
EM-CING-086-101-020807 – Southwestern Bell Mobile Systems, LLC notice of intent to modify existing telecommunications facilities located in Montville and North Haven, Connecticut.
EM-AT&T-086-020828 – AT&T Wireless PCS, LLC d/b/a AT&T Wireless notice of intent to modify an existing telecommunications facility located at 1334 Route 85, Montville, Connecticut.
EM-VER-086-151015 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 557 Route 82, Montville, Connecticut. Decision
EM-VER-086-160311 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 71 Moxley Road, Montville, Connecticut. Decision Notice of Construction Completion
EM-AT&T-086-160722 – AT&T notice of intent to modify an existing telecommunications facility located at 557 Route 82, Montville, Connecticut. Decision Notice of Construction Completion
EM-CING-086-160815 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 376 Butlertown Road, Montville, Connecticut. Decision Notice of Construction Completion
TS-EVER-086-160823 – Eversource Energy request for an order to approve tower sharing at an existing telecommunications facility located at 911 Route 32 (Norwich New London Turnpike), Montville, Connecticut. Decision Condition No. 1 Compliance Notice of Construction Completion
TS-T-MOBILE-086-160829 – T-Mobile request for an order to approve tower sharing at an existing telecommunications facility located at 41 Beckwith Road, Montville, Connecticut. Incomplete Letter Response to Incomplete Letter Decision Condition No. 1 Compliance Notice of Construction Completion
TS-T-MOBILE-086-160908 – T-Mobile Northeast LLC request for an order to approve tower sharing at an existing telecommunications facility located at 401 Chapel Hill Road, Oakdale (Montville), Connecticut. Decision Request for Extension and Council Decision Second Extension Request and Council Decision Notice of Construction Completion Non-Compliance Letter Non-Compliance Response/Extension Request Council Extension Decision
EM-VER-086-160923 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 557 Route 82, Montville, Connecticut. Decision Condition No. 1 Compliance Notice of Construction Completion
EM-AT&T-086-160928 – AT&T Wireless notice of intent to modify an existing telecommunications facility located at 695 Old Colchester Road, Montville, Connecticut. Decision Compliance Condition No. 1 Notice of Construction Completion
EM-AT&T-086-161031 – AT&T notice of intent to modify an existing telecommunications facility located at 71 Moxley Road, Uncasville (Montville), Connecticut. Decision Notice of Construction Completion
EM-VER-086-170210 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 57 Cook Road, Montville, Connecticut. Decision Notice of Construction Completion
EM-T-MOBILE-086-171010 – T-Mobile notice of intent to modify an existing telecommunications facility located at 41 Beckwith Road, Montville, Connecticut. Decision Will Not Complete
EM-T-MOBILE-086-171027 – T-Mobile notice of intent to modify an existing telecommunications facility located at 401 Chapel Hill Road, Oakdale (Montville), Connecticut. Decision Notice of Construction Completion
EM-SPRINT-086-171109 – Sprint notice of intent to modify an existing telecommunications facility located at 71 Moxley Road, Uncasville (Montville), Connecticut. Decision Notice of Construction Completion
EM-VER-086-171205 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 689 Old Colchester Road, Montville, Connecticut. Decision Extension Request and Council Decision Notice of Construction Completion
EM-SPRINT-086-180124 – Sprint notice of intent to modify an existing telecommunications facility located at 57 Cook Drive, Montville, Connecticut Incomplete Response to Incomplete Decision
EM-VER-086-180208 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 41 Beckwith Road, Montville, Connecticut. Decision Extension Request and Council Decision Second Extension Request and Council Decision Notice of Construction Completion
EM-SPRINT-086-180828 – Sprint Spectrum Realty Company, LP notice of intent to modify an existing telecommunications facility located at 57 Cook Drive, Montville, Connecticut. Decision Notice of Construction Completion
EM-SPRINT-086A-181015 – Sprint notice of intent to modify an existing telecommunications facility located at 557 Route 82, Oakdale (Montville), Connecticut. Decision Notice of Construction Completion
EM-SPRINT-086B-181015 – Sprint notice of intent to modify an existing telecommunications facility located at 41 Beckwith Road, Montville, Connecticut. Decision Notice of Construction Completion
EM-AT&T-086-181029 – AT&T notice of intent to modify an existing telecommunications facility located at 57 Cook Drive, Uncasville (Montville), Connecticut. Incomplete Letter Decision - Denial
EM-VER-086-181210 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 41 Beckwith Road, Montville, Connecticut. Decision Notice of Construction Completion
EM-AT&T-086-190117 – AT&T Mobility, LLC notice of intent to modify an existing telecommunications facility located at 57 Cook Drive, Uncasville (Montville), Connecticut. Decision
EM-CING-086-190219 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 689 Old Colchester Road, Montville, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion Condition Submission
EM-CING-086-190311 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 1334 Route 85, Montville, Connecticut. Decision Condition Submission
EM-T-MOBILE-086-190329 – T-Mobile notice of intent to modify an existing telecommunications facility located at 71 Moxley Hill Road, Montville, Connecticut. Decision Notice of Construction Completion
EM-EVER-086-190515e – The Connecticut Light and Power Company d/b/a Eversource notice of intent to modify an existing energy facility site at 89 Lathrop Road, Montville, Connecticut. Decision Notice of Construction Completion
TS-DISH-086-190524 – Gamma Purchasing, LLC (Dish) request for an order to approve tower sharing at an existing telecommunications facility located at 1334 Route 85, Montville, Connecticut. Town Letter Incomplete Letter Response to Incomplete and Council Acknowledgement Decision
EM-T-MOBILE-086-190711 – T-Mobile notice of intent to modify an existing telecommunications facility located at 41 Beckwith Road, Montville, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgment Decision Notice of Construction Completion
EM-T-MOBILE-086-190722 – T-Mobile notice of intent to modify an existing telecommunications facility located at 57 Cook Drive, Montville, Connecticut. Decision Notice of Construction Completion
EM-T-MOBILE-086-190823 – T-Mobile notice of intent to modify an existing telecommunications facility located at 71 Moxley Road, Montville, Connecticut. Decision - Denial
EM-T-MOBILE-086-190903 – T-Mobile notice of intent to modify an existing telecommunications facility located at 71 Moxley Road, Montville, Connecticut. Decision Notice of Construction Completion
EM-CING-086-191004 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 71 Moxley Road, Montville, Connecticut. Decision Notice of Construction Completion
EM-CING-086-191028 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 376 Butlertown Road, Montville, Connecticut. Decision Notice of Construction Completion
EM-CING-086-200319 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 695 Old Colchester Road, Montville, Connecticut. Decision Notice of Construction Completion
EM-AT&T-086-200416 – AT&T notice of intent to modify an existing telecommunications facility located at 557 Route 82, Montville, Connecticut. Decision Notice of Construction Completion
EM-T-MOBILE-086-200812 – T-Mobile notice of intent to modify an existing telecommunications facility located at 57 Cook Road, Montville, Connecticut. Decision Notice of Construction Completion
EM-EVER-086-201022 – The Connecticut Light and Power Company d/b/a Eversource Energy notice of intent to modify an existing telecommunications facility located at 414 Chapel Hill Road, Montville, Connecticut. Decision Notice of Construction Completion
EM-T-MOBILE-086-210319 – T-Mobile notice of intent to modify an existing telecommunications facility located at 557 Route 82, Oakdale (Montville), Connecticut. Decision Notice of Construction Completion
EM-EVER-086-210319e – The Connecticut Light and Power Company d/b/a Eversource notice of intent to modify an existing energy facility site at 89 Lathrop Road, Montville, Connecticut. Decision Notice of Construction Completion
EM-T-MOBILE-086-210517 – T-Mobile notice of intent to modify an existing telecommunications facility located at 401 Chapel Hill Road, Montville, Connecticut. Decision Notice of Completion Compliance with Conditions
EM-T-MOBILE-086-210611 – T-Mobile notice of intent to modify an existing telecommunications facility located at 71 Moxley Road, Montville, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion
EM-T-MOBILE-086-210623 – T-Mobile notice of intent to modify an existing telecommunications facility located at 57 Cook Road, Montville, Connecticut. Decision Notice of Construction Completion
EM-T-MOBILE-086-210625 – T-Mobile notice of intent to modify an existing telecommunications facility located at 401 Chapel Hill Road, Montville, Connecticut. Decision Notice of Construction Completion
TS-T-MOBILE-086-210921 – T-Mobile request for an order to approve tower sharing at an existing telecommunications facility located at 689 Old Colchester Road, Montville, Connecticut. Proof of Delivery Town Letter Incomplete Letter Response to Incomplete - Mount Analysis Structural Analysis Council Acknowledgement Decision Extension Request and Council Decision Notice of Cancellation
EM-VER-086-211018 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 41 Beckwith Road, Montville, Connecticut. Decision Notice of Cancellation
EM-VER-086-211026 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 57 Cook Drive, Montville, Connecticut. Decision Extension Request and Council Decision Withdrawn
EM-VER-086-211105 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 557 Route 82, Oakdale (Montville), Connecticut. Decision Withdrawn
EM-VER-086-211217 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 689 Old Colchester, Road, Montville, Connecticut. Decision Extension Request and Council Decision Notice of Construction Completion
TS-DISH-086-220531 – Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 139 Sharp Hill Road, Montville, Connecticut. Town Letter Decision Notice of Construction Completion
EM-T-MOBILE-086-220706 – T-Mobile notice of intent to modify an existing telecommunications facility located at 41 Beckwith Road, Montville, Connecticut. Decision Notice of Construction Completion
TS-DISH-086-220728 – Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 1334 Route 85, Montville, Connecticut. Town Letter Decision Extension Request and Council Decision Second Extension Request and Council Decision
TS-DISH-086-220816 – Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 49 Cook Drive, Montville, Connecticut. Town Letter Decision Request for Extension and Council Decision Second Extension Request and Council Decision
EM-T-MOBILE-086-220928 – T-Mobile notice of intent to modify an existing telecommunications facility located at 41 Beckwith Road, Montville, Connecticut. Decision Extension Request and Council Extension Decision Notice of Construction Commencement Notice of Construction Completion
TS-DISH-086-221024 – Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 414 Chapel Hill Road, Montville, Connecticut. Town Letter Decision Notice of Construction Completion
EM-AT&T-086-230201 – AT&T notice of intent to modify an existing telecommunications facility located at 71 Moxley Road, Montville, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion
EM-ATT-086-230620 – AT&T notice of intent to modify an existing telecommunications facility located at 1334 Route 85, Montville, Connecticut. Decision Notice of Construction Completion
EM-VER-086-231027 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 689 Old Colchester Road, Montville, Connecticut. Decision Notice of Construction Commencement Notice of Construction Completion
EM-ATT-086-240104 – AT&T Mobility, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 57 Cook Drive, Montville, Connecticut. Incomplete Letter Response to Incomplete and Council AcknowledgementDecisionNotice of Construction Completion
EM-VER-086-240109 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 71 Moxley Road, Montville (Uncasville), Connecticut. Decision Notice of Construction Commencement Notice of Construction Completion
EM-ATT-086-240110 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 71 Moxley Road, Montville (Uncasville), Connecticut. Incomplete LetterResponse to IncompleteSecond Incomplete LetterResponse to Incomplete and Council AcknowledgementDecisionNotice of Construction Completion
TS-DISH-086-240214 – Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 71 Moxley Road, Montville (Uncasville), Connecticut. Town Letter DecisionNotice of Construction Completion
EM-ATT-086-240429 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 57 Cook Drive, Montville, Connecticut. DecisionNotice of Construction Completion
EM-VER-086-240531 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 57 Cook Drive, Montville (Uncasville), Connecticut. Decision Notice of Construction Commencement Extension Request and Council Decision
EM-VER-086-240605 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 557 Route 82, Montville (Oakdale), Connecticut. DecisionNotice of Construction CommencementNotice of Construction Completion
EM-T-MOBILE-086-250507 – T-Mobile notice of intent to modify an existing telecommunications facility located at 71 Moxley Road, Montville (Uncasville), Connecticut. Decision
TS-T-MOBILE-086-250807 – T-Mobile request for an order to approve tower sharing at an existing telecommunications facility located at 1334 Route 85, Montville, Connecticut. Town Letter Decision
EM-EVER-086-251024e – The Connecticut Light and Power Company d/b/a Eversource Energy notice of intent to modify an existing energy facility located between Fort Hills Farm Substation and Montville Substation, Montville, Connecticut. Decision Notice of Construction Commencement and Council Acknowledgement of Compliance with Condition No. 3
EM-VER-086-251105 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 41 Beckwith Road, Montville, Connecticut. Decision