DOCKET NO. 9 - CL&P application for a Certificate of Environmental Compatibility and Public Need with respect to a new 345 kV overhead electric transmission line between Oxbow Junction, in Haddam, and Black Pond Junction, in Meriden, and the related reconstruction of an existing overhead 115kV electric transmission line between Beseck Junction , in Wallingford, and East Meriden Substation, in Meriden. (Findings of Fact)
DOCKET NO. 93 - Metro Mobile CTS of New Haven, Inc. application for a Certificate of Environmental Compatibility and Public Need for cellular telephone antennas and associated equipment in the City of Meriden, Connecticut. (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 190 - An application by PDC - El Paso Meriden LLC for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of the proposed Meriden Power Project located in the City of Meriden and the Town of Berlin. (Findings of Fact), (Opinion), (Dissenting Opinion) and (Decision and Order).
DOCKET NO. 190A – Meriden Gas Turbines, LLC Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 530 MW combined cycle generating plant in Meriden, Connecticut. Reopening of this docket pursuant to Connecticut General Statutes § 4-181a(b) limited to Council consideration of changed conditions and of the attachment of conditions to the certificate consistent with the findings and recommendations in the Final Report issued by the Kleen Energy Plant Investigation Review Panel (Nevas Commission) and the findings and recommendations in the Executive Report issued by the Thomas Commission. (Record), (Findings of Fact), (Opinion), (Decision and Order).
DOCKET NO. 190B – Meriden Gas Turbines, LLC Certificate of Environmental Compatibility and Public Need for a 530 MW combined cycle generating plant in Meriden, Connecticut. Reopening of this docket pursuant to Connecticut General Statutes § 4-181a(b) limited to Council consideration of changed conditions and Decommissioning Plan. (Record), (Findings of Fact), (Opinion), (Decision and Order), (Conclusions of Law).
DOCKET NO. 272 - The Connecticut Light and Power Company and The United Illuminating Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV electric transmission line and associated facilities between the Scovill Rock Switching Station in Middletown and the Norwalk Substation in Norwalk, Connecticut. This includes construction of the Beseck Switching Station in Wallingford, East Devon Substation in Milford, and Singer Substation in Bridgeport and modifications to the Scovill Rock Switching Station and the Norwalk Substation and certain interconnections. (Meriden) (Findings of Fact), (Appendix A), (Appendix B), (Appendix C), (Opinion), (Decision and Order), (Record).
DOCKET NO. 329 – Optasite Towers LLC and Omnipoint Communications, Inc. application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a telecommunications facility at Paddock Avenue in Meriden, Connecticut. (Record), (Findings of Fact), (Opinion), (Decision and Order), and modified (Decision and Order).
PETITION NO. 67 - Southern New England Telephone Company petition for the construction of an 80-foot tall square lattice steel tower antenna and associated equipment, concrete equipment building, and fuel storage tank at an existing tower facility in Wolcott; construction of a concrete equipment building and installation of microwave antennas and associated equipment on an existing tower in Waterbury; installation of microwave antennas and associated equipment on existing towers on West Peak, Meriden; and in Bridgeport, Shelton, and Norwalk. Staff Report. Approved 4/1/81
PETITION NO. 96 - Northeast Utilities petition for modifications to sections of the Southington Substation - Wallingford Substation, Southington Substation - Hanover Substation, Southington Substation - East Meriden Substation 115-kV transmission lines located in Meriden. Staff Report. Approved 8/23/83
PETITION NO. 129 - Northeast Utilities Service Company petition for modifications to the Southington-Hanover 115-kV line in Southington and Meriden. Staff Reports for Petitions 129 - 136. Approved 8/20/85
PETITION NO. 130 - Northeast Utilities Service Company petition for modifications to the Southington-Wallingford Junction 115-kV line in Southington, Meriden, and Cheshire. Staff Report. Approved 8/20/85
PETITION NO. 131 - Northeast Utilities Service Company petition for modification of the Southington-Glen Lake Junction 115-kV line in Southington, Meriden, Wallingford, Cheshire, Hamden, and Bethany. Staff Report. Approved 8/20/85
PETITION NO. 134 - Northeast Utilities Service Company petition to reconductor the Southington-Schwab Junction 115-kV line in Southington, Cheshire, Meriden, and Wallingford. Staff Report.Approved 8/20/85
PETITION NO. 135 - Northeast Utilities Service Company petition for the construction of the Southington-Lucchini Junction 115-kV line in Southington, Meriden, Wallingford, and Cheshire. Staff Report. Approved 8/20/85
PETITION NO. 136 - Northeast Utilities Service Company petition for modifications to the Hanover Substation. Staff Report. Approved 8/20/85
PETITION NO. 140HW - United Oil Recovery, Inc. petition regarding proposed modifications to its existing facility in Meriden. Staff Report. Approved 9/26/85
PETITION NO. 231HW - The United Industrial Services petition that no Certificate of Public Safety and Necessity is required for proposed changes at its hazardous waste facility in Meriden. Staff Report. Approved 4/24/89
PETITION NO. 292 - Springwich Cellular Limited Partnership petition that no Certificate is required for the installation of cellular telecommunications antennas on top of the Southern New England Telephone Company building at 27 Butler Street in Meriden. Staff Report. Approved 10/14/92
PETITION NO. 294HW - United Oil Recovery, Inc. petition for proposed improvements and activities to a facility located at 136 Gracey Avenue in Meriden. Staff Report. Approved 12/2/92
PETITION NO. 320 - Metro Mobile CTS of New Haven, Inc. petition for the installation of cellular antennas, support pole, and associated equipment at 921 East Main Street in Meriden. Staff Report. Approved 4/18/94
PETITION NO. 339A - The Connecticut Light and Power Company petition that no Certificate of Environmental Compatibility and Public Need is required for installation of a fiber optic cable and associated structural changes along several 115-kV and 345-kV transmission corridors in the Towns of Berlin, Bethany, Cheshire, Hamden, Meriden, Milford, Orange, Wallingford, and Woodbridge.
PETITION NO. 374 - Cellco Partnership d/b/a Bell Atlantic NYNEX Mobile petition that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing telecommunications site (Petition No. 320) at an Amoco gasoline station, 921 East Main Street in Meriden, Connecticut. Staff Report. Approved 6/16/97
PETITION NO. 477HW - United Oil Recovery, Inc. petition for a declaratory ruling that no Certificate of Public Safety and Necessity is required for changes at the container staging area of the facility located at 136 Gracey Avenue, Meriden, Connecticut. Staff Report. Approved 9/19/00.
PETITION NO. 548 - Yankee Gas Services Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation, and maintenance of a distribution line in Southington, Berlin, and Meriden, Connecticut Findings of Fact Opinion Decision and Order Approved 08/01/02.
PETITION NO. 594 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power electric transmission facility located at 74 Birdsey Avenue, Meriden, Connecticut. Staff Report. Approved 11/21/02.
PETITION NO. 614T - AT&T Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing telecommunications tower located at 450-478 West Main Street, Meriden, Connecticut. Staff Report. Approved 03/11/03.
PETITION NO. 727 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification to expand an existing telecommunications facility located at 119 Empire Avenue, Meriden, Connecticut. Staff Report. Approved 08/24/05.
PETITION NO. 864 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing single-circuit 115kV transmission line between Cook Hill Junction in Cheshire, Connecticut and Lucchini Junction in Meriden, Connecticut. Staff Report. Approved 10/16/08.
PE1133-VER-20150928 - Cellco Partnership d/b/a Verizon Wireless sub-petition for a declaratory ruling for approval of an eligible facility request for modifications to an existing telecommunications facility located at 234 Sherman Avenue, Meriden, Connecticut. Decision. Extension Request and CSC Approval.Proposed Minor ModificationsCSC Modification ApprovalCompletion Letter
PETITION NO. 1264 - Bloom Energy Corporation, as an agent for Frontier Communications Corporation, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 400-Kilowatt Fuel Cell Facility to be located at the Frontier building, 25 Butler Street, Meriden, Connecticut. Approved 1/19/17.
SUB-PETITION NO. 1293 - BMMM-01 (Berlin, Meriden, Middlefield, Middletown) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decisio nCompletion Letter
SUB-PETITION NO. 1293-SBMM-01 (Southington-Berlin-Meriden-Middletown) Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Approval 2nd Extension Request and Council Approval 3rd Extension and Council Approval 4th Extension Request and Council Approval
SUB-PETITION NO. 1293-SCMW-01 (Southington-Cheshire-Meriden-Wallingford) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Approval
SUB-PETITION NO. 1293 - SBM-01 (Southington-Berlin-Meriden) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Request for Extension and Council Extension Decision Amendment Request Council Decision on Amendment Request Second Extension Request and Council Extension Decision Third Extension Request and Council Decision Request for Project Change and Council Decision
PETITION NO. 1335 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small cell telecommunications facility on the façade of an existing commercial building located at 1187 East Main Street (Route 66), Meriden, Connecticut. Approved 12/21/17
PETITION NO. 1574 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Southington Substation to Cook Hill Junction Rebuild Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 11.2 miles of its existing electric transmission line right-of-way shared by its existing 115-kilovolt (kV) 1690, 1208, 1355 and 1610 Lines between Southington Substation in Southington and Cook Hill Junction in Wallingford including the installation of approximately 650 feet of the 1690 Line underground at Lucchini Junction in Meriden, traversing the municipalities of Southington, Cheshire, Wallingford, and Meriden, Connecticut, and related electric transmission line and substation improvements. Approved 08/17/23
PETITION NO. 1585 – Endurant EnergyScale Microgrid Solutions Operating, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.9-megawatt AC battery energy storage facility located at 508 North Colony Street, Meriden, Connecticut, and associated electrical interconnection. Approved 12/07/23
PETITION NO. 1590 – TowerNorth Development, LLC and New Cingular Wireless, PCS d/b/a AT&T petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement of an existing municipal communications tower located at 13 Pomeroy Avenue, Meriden, Connecticut. Approved 12/21/23
BAM request for an order to approve tower sharing at an existing telecommunications facility located at 38 Elm St., Meriden. Complete File
Bell Atlantic NYNEX Mobile - Antenna Upgrades - West Peak, Meriden, Connecticut. November 22, 1995 Antenna Upgrade Filing
Dept. of Public Safety, Div. of State Police notice of intent to modify an existing telecommunications facility located at 285 Preston Ave., Meriden.
Springwich Cellular Ltd. Partnership notice of intent to modify an existing telecommunications facility located on West Peak Dr., Meriden.
Omnipoint Communications notice of intent to modify an existing telecommunications facility located on West Peak Dr., Meriden.
EM-OCI-080-990406 - Omnipoint Communications notice of intent to modify an existing telecommunications facility located on West Peak in Meriden.
EM-SNET-080-990603 - Southern New England Telephone notice of intent to modify an existing telecommunications facility located on the West Peak of Meriden Mountain, Meriden.
EM-SNET-080-010112 - Southern New England Telephone Company (SNET) notice of intent to modify an existing telecommunications facility located on the West Peak of Meriden Mountain, Meriden, Connecticut.
EM-VOICESTREAM-080-010426 - VoiceStream Wireless notice of intent to modify an existing telecommunications facility located at 11 West Peak Drive, Meriden, Connecticut.
EM-AT&T-080-020823 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless notice of intent to modify an existing telecommunications facility located at 21 West Peak Drive, Meriden, Connecticut.
TS-T-MOBILE-080-031217 - T-Mobile USA, Inc. request for an order to approve tower sharing for a proposed telecommunications facility to be constructed at 450-478 West Main Street, Meriden, Connecticut.
EM-CLEARWIRE-080-091230 – Clearwire Corporation notice of intent to modify an existing telecommunications facility located at 119 Empire Avenue, Meriden, Connecticut.
EM-VER-080-150923 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 38 Elm Street, Meriden, Connecticut. Decision Request for Extension and CSC Decision 2nd Extension Request and CSC Decision Completion Letter
EM-T-MOBILE-080-150924 - T-Mobile notice of intent to modify an existing telecommunications facility located at 119 Empire Avenue, Meriden, Connecticut. Decision Completion Letter
EM-T-MOBILE-080-151014 - T-Mobile notice of intent to modify an existing telecommunications facility located at 651 Paddock Avenue, Meriden, Connecticut. Denied Modified Decision (DO329) Completion Letter
EM-VER-080-151207 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 462 West Main Street, Meriden, Connecticut. DecisionRequest for Extension and CSC Decision Completion Letter
EM-T-MOBILE-080-160616 - T-Mobile notice of intent to modify an existing telecommunications facility located at 462 West Main Street, Meriden, Connecticut. Decision Completion Letter
EM-VER-080-160921 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 651 Paddock Avenue, Meriden, Connecticut. Decision Compliance with Condition 1Extension Request and CSC Approval Second Extension Request and CSC Approval Completion Letter
EM-VER-080-161026 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 119 Empire Avenue, Meriden, Connecticut. Decision. Completion Letter.
EM-AT&T-080-161227 - AT&T notice of intent to modify an existing telecommunications facility located at 119 Empire Avenue, Meriden, Connecticut. Decision Extension Request Council Denial of Extension Letter
EM-AT&T-080-170124 - AT&T notice of intent to modify an existing telecommunications facility located at 450 West Main Street, Meriden, Connecticut. Decision Extension Request and CSC Decision Status Update Completion Letter 2nd Complete Letter
EM-SPRINT-080-171219 - Sprint notice of intent to modify an existing telecommunications facility located at 651 Paddock Avenue, Meriden, Connecticut. DecisionCompletion Letter
EM-AT&T-080-180328 - AT&T notice of intent to modify an existing telecommunications facility located at 119 Empire Avenue, Meriden, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Completion Status Sheet Completion Letter
EM-AT&T-080-180430 – AT&T notice of intent to modify an existing telecommunications facility located at 450 West Main Street, Meriden, Connecticut. Decision Completion Letter
EM-VER-080-180620 – Cellco Partnership, d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 119 Empire Avenue, Meriden, Connecticut. Decision Completion Letter
EM-SPRINT-080-180806 – Sprint notice of intent to modify an existing telecommunications facility located at 119 Empire Avenue, Meriden, Connecticut. R. Bertotti Comment with CSC Response Decision Completion Letter Construction Complete
EM-T-MOBILE-080-181015 - T-Mobile notice of intent to modify an existing telecommunications facility located at 450 West Main Street, Meriden, Connecticut. Decision Will Not Complete Letter
EM-SPRINT-080-190110 - Sprint notice of intent to modify an existing telecommunications facility located at 21 West Peak Drive, Meriden, Connecticut. Decision Will Not Complete
EM-VER-080-190214 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 38 Elm Street, Meriden, Connecticut. Decision Will Not Complete - Approval Expired
EM-CING-080-190411 - New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 74 Birdsey Avenue, Meriden, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision
EM-CING-080-190506 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 27 Butler Street, Meriden, Connecticut. Decision Notice of Completion Condition Submission
EM-VER-080-200430 - Cellco Partnership, d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 119 Empire Avenue, Meriden, Connecticut. Decision Notice of Completion
EM-EVER-080-200724 – The Connecticut Light and Power Company d/b/a Eversource Energy notice of intent to modify an existing telecommunications facility located 56 Cooper Street, Meriden, Connecticut. Decision Completion Letter
EM-T-MOBILE-080-210108 - T-Mobile notice of intent to modify an existing telecommunications facility located at 450 West Main Street, Meriden, Connecticut. Decision Notice of Completion
EM-T-MOBILE-080-210111 - T-Mobile notice of intent to modify an existing telecommunications facility located at 651 Paddock Avenue, Meriden, Connecticut. Decision Notice of Construction Start Completion Letter
EM-CING-080-210203 - New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 74 Birdsey Avenue, Meriden, Connecticut. Decision Notice of Completion
EM-VER-080-210617 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 38 Elm Street, Meriden, Connecticut. Decision Notice of Completion
EM-VER-080-210701 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 651 Paddock Avenue, Meriden, Connecticut. Decision Extension Request and Council Extension Approval Notice of Construction Commencement Notice of Construction Completion
EM-T-MOBILE-080-210702 – T-Mobile notice of intent to modify an existing telecommunications facility located at 119 Empire Avenue, Meriden, Connecticut. Decision Notice of Completion
EM-T-MOBILE-080-210813 - T-Mobile notice of intent to modify an existing telecommunications facility located at 450-478 West Main Street, Meriden, Connecticut. Decision Notice of Completion
EM-VER-080-210917 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 450-478 West Main Street, Meriden, Connecticut. Incomplete Letter Decision-Denial
EM-VER-080-211206 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 119 Empire Avenue, Meriden, Connecticut. Decision Extension Request and Council Approval Additional Extension Request and Council Extension Approval Notice of Construction Commencement
TS-DISH-080-220207 - Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 11 West Peak Drive, Meriden, Connecticut. Town Letter Decision Extension Request and Council Extension Approval
EM-VER-080-220215 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 450-478 West Main Street, Meriden, Connecticut. Incomplete Letter Council Acknowledgement of Incomplete Submission 2nd Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Extension Request and Council Approval Notice of Cancellation
TS-DISH-080-220407 - Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 450-478 West Main Street, Meriden, Connecticut. Town Letter Decision Notice of Construction Completion
TS-DISH-080-220531 - Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 651 Paddock Avenue, Meriden, Connecticut. Town Letter Decision Notice of Construction Completion
EM-CING-080-220613 - New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 27 Butler Street, Meriden, Connecticut. Decision Notice of Construction Commencement Notice of Construction Completion
EM-EVER-080-220616e – The Connecticut Light and Power Company d/b/a Eversource Energy notice of intent to modify an existing energy facility located at 300 High Hill Road, Meriden, Connecticut. Decision Notice of Completion
EM-VER-080-220713 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 234 Sherman Avenue, Meriden, Connecticut. Decision Request for Extension and Council Approval Second Extension Request and Council Approval
TS-DISH-080-230522 - Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 38 Elm Street, Meriden, Connecticut. Town Letter Incomplete Letter Extension Request and Council Approval Additional Extension Request and Council Extension Approval Extension Request and Council Approval Second Extension Request and Council Approval
Third Extension Request and Council Extension Approval Fourth Extension Request and Council Extension Approval Response to Incomplete 2nd Incomplete Letter Fifth Extension Request and Council Extension Approval Decision-Denial
EM-ATT-080-230524 - AT&T notice of intent to modify an existing telecommunications facility located at 119 Empire Avenue, Meriden, Connecticut. Decision Extension Request and Council Extension Approval
EM-VER-080-230818 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 651 Paddock Avenue, Meriden, Connecticut. Decision Notice of Construction Commencement Notice of Construction Completion
EM-ATT-080-231011 - AT&T notice of intent to modify an existing telecommunications facility located at 200 Edgemark Acres, Meriden, Connecticut. Decision Notice of Construction Completion
EM-VER-080-231012 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 38 Elm Street, Meriden, Connecticut. Decision Notice of Construction Commencement Notice of Construction Completion
EM-ATT-080-240207 – AT&T notice of intent to modify an existing telecommunications facility located at 450-475 West Main Street, Meriden, Connecticut. Decision