Due to the personally identifying information contained in written limited appearance statements from the public, any written limited appearance statements that are received by the Council for any matter are available to be viewed at the Council’s office Monday through Friday from 8:30 a.m. to 4:30 p.m. or available to be sent via e-mail upon request. Please allow adequate time for processing.

Long Island Sound Resource and Use Inventory/Long Island Sound Blue Plan Survey

LISBON

DOCKET NO. 110 Riley Energy Systems of Lisbon Corporation, Regional Disposal Systems of Lisbon, Inc., and Philip C. Armetta Certificate for construction of the Lisbon Resource Recovery Facility. (Findings of Fact)(Opinion)(Decision and Order).

DOCKET NO. 110A  An amended Certificate to Riley Energy Systems of Lisbon Corporation, Regional Disposal Systems of Lisbon, Inc., and Philip C. Armetta for the Lisbon Resource Recovery facility in the Town of Lisbon. (Findings of Fact)(Opinion), and (Decision and Order).

DOCKET NO. 124 SNET Cellular, Inc. Certificate for the construction, operation, and maintenance of a cellular telephone tower and associated equipment on Mell Road in Lisbon. (Findings of Fact)(Opinion), and (Decision and Order).

PETITION NO. 276  Northeast Utilities Service Company petition for a transmission line interconnection between the Lisbon Resource Recovery facility, located on a 276 acre parcel owned by Philip C. Armetta, approximately 1,000 feet east of the intersection of Route 97 and 169, and an existing Connecticut Light and Power Company 115-kV electrical transmission line, in Lisbon. Staff Report Approved 06/23/92

PETITION NO. 282  Concerned Citizens of Lisbon petition regarding the status of the Lisbon Resource Recovery facility in Lisbon. Certificate remains applicable. 07/15/92

PETITION NO. 302 The Connecticut Resources Recovery Authority petition for proposed changes in facility design, transfer of the Certificate, and compliance with conditions for waste fuel. Denied 04/22/93

PETITION NO. 309  Connecticut Resource Recovery Authority petition for rulings concerning the notice of intent to commence construction filed by Riley Energy Systems of Lisbon, Inc.  Staff Report Council felt issues raised by CRRA were moot given Council action dated 10/4/93. 10/20/93

PETITION NO. 771 – New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing transmission structure located at 652 River Road (State Route 12), Lisbon, Connecticut. Staff Report Approved 06/07/06.

SUB-PETITION NO. 1293-(LI-01) (Lisbon)  Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Construction Completion

SUB-PETITION NO. 1293-PLCPB-01 (Preston, Lisbon, Canterbury, Plainfield, Brooklyn)  Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Request for Access Road Change Revision Decision Request for Extension with CSC Decision Completion Letter

SUB-PETITION NO. 1293-NL-01 (Norwich-Lisbon) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Construction Completion

TS-OCI-073-991210  Omnipoint Communications request for an order to approve tower sharing at an existing telecommunications tower located at 26 Mell Road in Lisbon, Connecticut.

TS-VER-073-001117  Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 20 Nygren Road, Lisbon, Connecticut.  Town Letter Decision  

EM-AT&T-073-020405  AT&T Wireless PCS, LLC d/b/a AT&T Wireless notice of intent to modify an existing telecommunications facility located at 26 Mell Road, Lisbon, Connecticut.  Decision  

EM-CING-054-079-028-121-104-073-109-058-020702  SNET Mobility, LLC notice of intent to modify existing telecommunications facilities located in Colchester, Glastonbury, Griswold, Lisbon, Marlborough, Norwich, Plainfield, and Salem, Connecticut. Lisbon filing

EM-T-MOBILE-"UNIVERSAL"-020830 Omnipoint Facilities Network 2., L.L.C. and Omnipoint Communications, Inc., subsidiaries of T-Mobile USA, Inc. notice of intent to modify existing telecommunications facilities throughout Connecticut.

EM-T-MOBILE-073-040521  Omnipoint Communications, Inc., notice of intent to modify an existing telecommunications facility located at 26 Mell Road, Lisbon, Connecticut.  Decision  
 
EM-CING-062-070-072-073-083-070815 New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 890 Evergreen Street, Hamden; Clinton Road/78 Route 81, Killingworth; 899A Colonel Ledyard Highway, Ledyard; 26 Mell Road, Lisbon; and 538 Preston Avenue, Meriden, Connecticut.  Decision  
 
EM-CING-073-090127  New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 20 Mell Road, Lisbon, Connecticut.  Decision
 
EM-METROPCS-073-090622 – MetroPCS New York, LLC notice of intent to modify an existing telecommunications facility located at 26 Mell Road, Lisbon, Connecticut. Decision Extension Request and Council Approval Second Extension Request and Council Approval Third Extension Request and Council Approval  
 
EM-VER-073-110526  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 26 Mell Road, Lisbon, Connecticut.
 
EM-SPRINT-073-121126 – Sprint Spectrum notice of intent to modify an existing telecommunications facility located at 6 Mell Road, Lisbon, Connecticut.  Decision  

EM-CING-073-130207  New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 20 Mell Road, Lisbon, Connecticut.  Decision Extension Letter Second Extension Letter
 
EM-ATC-073-130328 – American Tower Corporation (“ATC”) notice of intent to modify an existing telecommunications facility located at 20 Mel Road, Lisbon, Connecticut.
 
EM-T-MOBILE-073-140411 T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 26 Mell Road, Lisbon, Connecticut. Decision Notice of Construction Completion
 
EM-VER-073-140708 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 26 Mell Road, Lisbon, Connecticut. Decision Notice of Construction Completion
 
EM-T-MOBILE-073-150320 – T-Mobile notice of intent to modify an existing telecommunications facility located at 26 Mell Road, Lisbon, Connecticut. Decision Notice of Construction Completion
 
EM-VER-073-161101  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 26 Mell Road, Lisbon, Connecticut. Decision Extension Request and CSC Approval Notice of Construction Completion
 
EM-CING-073-170309 New Cingular Wireless PCS, LLC (“AT&T") notice of intent to modify an existing telecommunications facility located at 20 Mell Road, Lisbon, Connecticut. Property Card Incomplete Response to Incomplete Decision Notice of Construction Completion
 
EM-SPRINT-073-180321 Sprint notice of intent to modify an existing telecommunications facility located at 26 Mell Road, Lisbon, Connecticut. Incomplete Letter Response to Incomplete Council Acknowledgement of Receipt Council Acknowledgement of Receipt Decision Notice of Construction Completion
 
EM-CING-073-200106 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 26 Mell Road, Lisbon, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion
 
EM-T-MOBILE-073-210527 – T-Mobile notice of intent to modify an existing telecommunications facility located at 26 Mell Road, Lisbon, Connecticut.  Decision Notice of Construction Completion
 
EM-VER-073-210630 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 26 Mell Road, Lisbon, Connecticut. Incomplete Letter Response to Incomplete Council Acknowledgement Decision Request for Extension and Council Extension Approval Notice of Construction Completion
 
TS-DISH-073-220518  Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 26 Mell Road, Lisbon, Connecticut.  Town Letter Decision Notice of Cancellation
 
TS-DISH-073-230214  Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 26 Mell Road, Lisbon, Connecticut.  Town Letter Decision Extension Request and Council Extension Approval Additional Extension Request and Council Approval
 
EM-VER-073-230914  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 26 Mell Road, Lisbon, Connecticut. Decision Notice of Construction Commencement  Request for Extension and Council Extension Approval