Due to the personally identifying information contained in written limited appearance statements from the public, any written limited appearance statements that are received by the Council for any matter are available to be viewed at the Council’s office Monday through Friday from 8:30 a.m. to 4:30 p.m. or available to be sent via e-mail upon request. Please allow adequate time for processing.

Long Island Sound Resource and Use Inventory/Long Island Sound Blue Plan Survey

Town of Ledyard


DOCKET NO. 133 – Intercon Gas, Inc. application for a Certificate of Environmental Compatibility and Public Need for the proposed construction and operation of the Thames River Pipeline. Dismissed

DOCKET NO. 313 – Omnipoint Communications, Inc., a subsidiary of T-Mobile USA, Inc., application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and management of a wireless telecommunications facility at 12 Orchard Drive, Ledyard, Connecticut. Withdrawn

DOCKET NO. 322 – Optasite, Inc. and Omnipoint Communications, Inc. application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut. (Record)(Findings of Fact) (Opinion) and (Decision and Order)

PETITION NO. 50 – Coastal Cable TV Company petition to place a receiving dish on the Department of Public Safety’s tower, on Vinegar Hill Road in Ledyard. Approved 02/22/80

PETITION NO. 51 – Coastal Cable TV Company modification of tower site in to a State Police tower in Ledyard. Approved 03/19/80

PETITION NO. 55 - Connecticut Department of Transportation petition for the construction of a telecommunications tower, antenna, associated equipment, and equipment building at an existing tower site located on Vinegar Hill off Vinegar Hill Road in Ledyard. Staff Report Approved 04/18/80

PETITION NO. 90 – Northeast Utilities petition for modifications to the 115-kV transmission line between Whipple Junction, Mystic Junction, and Mystic Substation in Stonington, Ledyard, and Groton. Staff Report Approved 12/13/82

PETITION NO. 141 – The Department of Environmental Protection petition for proposed changes to existing telecommunications facilities in Oxford, Cornwall, Hartford, Sterling, Ledyard, and Colchester.  Staff Report Approved 10/08/85

PETITION NO. 278 – Northeast Utilities Service Company and the City of Groton, Department of Utilities petition for proposed modifications to existing 69-kV transmission lines and substations in Montville, Ledyard, Preston, and Groton. Staff Report Approved 01/06/92

PETITION NO. 774 – Omnipoint Communications, Inc. and New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing facility located at 136 Vinegar Hill Road, Ledyard, Connecticut. Staff Report Approved 07/27/06

PETITION NO. 842 – The Sprint Nextel Corporation petition  for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the attachment of Sprint’s Antennas to an existing CL&P Tower located at 40 Barton Lane, Ledyard, Connecticut. Withdrawal Letter Withdrawn.
 
PETITION NO. 1034 The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing 115-kV transmission line in Ledyard, Connecticut. Staff Report Approved 09/06/12

PETITION NO. 1246 – Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed removal of one existing 69-kV dead-end wood electric transmission line structure, replacement of two existing 69-kilovolt (kV) wood H-frame tap angle electric transmission line structures (Line 100 and Line 400) with two 3-pole weathering steel angle electric transmission line structures, relocation of the conductors from the existing electric transmission line structures to the proposed electric transmission line structures located at Gales Ferry Substation, 301 Whalehead Road, Ledyard, Connecticut and related transmission line and substation improvements. Approved 09/01/16

PETITION NO. 1259 – Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Thames River Crossing Structure Replacement Project that includes replacement and reconductoring of four double-circuit electric transmission line structures along approximately .5 miles of existing Eversource right of way between Montville and Ledyard, Connecticut, and related transmission line structure improvements. Approved 12/08/16

SUB-PETITION NO. 1293-LG-01 (Ledyard-Groton) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Request for Intervenor Status/Motion for Hearing  Council Acknowledgement of Status and Motion Request Council Denial of Request for Status/Motion for Hearing  Decision  Extension Request and Council Decision  Request for Amendment  Council Decision on Amendment Request  Notice of Construction Completion

PETITION NO. 1436 – Groton Utilities petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement and reconductoring of electric transmission line structures along approximately 1.7 miles of its existing 115-kilovolt (kV)/69-kV 1410/400 double-circuit electric transmission line and 115-kV 1280 single-circuit electric transmission line within existing Groton Utilities electric transmission line right-of-way between Groton/Ledyard town line and Buddington Substation located north of Gold Star Highway in Groton, Connecticut, and related transmission line and substation improvements.  Approved 02/25/21

PETITION NO. 1475 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Eastern Connecticut Reliability Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 2.1 miles of its existing Nos. 100 and 400 69-kilovolt (kV) and Nos. 1410 and 1280 115-kV electric transmission lines within existing Eversource electric transmission line right-of-way between Montville Junction, Montville and Ledyard Junction, Ledyard, Connecticut, and related electric transmission line and substation improvements. Approved 02/24/22

PETITION NO. 1484 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed modifications to its existing Gales Ferry Substation located at 301 Whalehead Road, Ledyard, Connecticut, and related electric transmission line structure improvements. Approved 05/12/22

PETITION NO. 1486 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 400/500 Lines Rebuild Project consisting of the upgrade of the existing No. 400 69-kilovolt (kV) electric transmission line to 115-kV and the replacement and reconductoring of electric transmission line structures along 8.6 miles of the existing No. 400 electric transmission line within existing Eversource electric transmission line right-of-way between Ledyard Junction in Ledyard and Tunnel Substation in Preston; and the replacement and reconductoring of electric transmission line structures along approximately 4.9 miles of the existing No. 500 69-kV electric transmission line within existing Eversource electric transmission line right-of-way between Hallville Junction in Ledyard and Tunnel Substation in Preston Connecticut, and related electric transmission line and substation improvements. Approved 05/12/22

PETITION NO. 1535  The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Ledyard Junction to Mystic Substation Upgrade Project consisting of the replacement and reconductoring of approximately 12.8 miles of its existing No. 1280 115-kilovolt (kV) electric transmission line within existing Eversource electric transmission right-of-way between Eversource’s Ledyard Junction in Ledyard and Mystic Substation in Stonington, Connecticut and related electric transmission line and substation improvements.  Approved 12/22/22

Dept. of Public Safety, Div. of State Police notice of intent to modify existing telecommunications facilities located at Windham, Colchester; Troop E, Rt. 42, Montville; Mohawk Mountain, Cornwall; Vinegar Hill Rd., east of Gales Ferry, Ledyard.

Dept. of Public Safety, Division of State Police, notice of intent to modify an existing telecommunications facility located at 136 Vinegar Hill Road in Ledyard.

TS-VER-072-001113 – Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 889A Colonel Ledyard Highway, Ledyard, Connecticut.  Town Letter  Decision  

EM-CING-072-020401 – SNET Mobility, LLC notice of intent to modify an existing telecommunications facility located at 889R Colonel Ledyard Highway, Ledyard, Connecticut.  Decision  

EM-MARCUS-072-020403 – Marcus Communications, LLC notice of intent to modify an existing telecommunications facility located at 889R Colonel Ledyard Highway, Ledyard, Connecticut.

EM-NEXTEL-072-020621 – Nextel Communications Inc. notice of intent to modify an existing telecommunications facility located at 889R Colonel Ledyard Highway, Ledyard, Connecticut.

EM-T-MOBILE-"UNIVERSAL"-020830 – Omnipoint Facilities Network 2., L.L.C. and Omnipoint Communications, Inc., subsidiaries of T-Mobile USA, Inc. notice of intent to modify existing telecommunications facilities throughout Connecticut.

EM-AT&T–072-020923 AT&T Wireless PCS, Inc., d/b/a AT&T Wireless notice of intent to modify an existing telecommunications facility located at 889 Colonel Ledyard Highway, Ledyard, Connecticut.  Decision  
 
EM-T-MOBILE-072-070315 – Omnipoint Communications, Inc. (T-Mobile) notice of intent to modify an existing telecommunications facility located at 889A Colonel Ledyard Highway, Ledyard, Connecticut.  Decision  
 
EM-CING-062-070-072-073-083-070815 New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 890 Evergreen Street, Hamden; Clinton Road/78 Route 81, Killingworth; 899A Colonel Ledyard Highway, Ledyard; 26 Mell Road, Lisbon; and 538 Preston Avenue, Meriden, Connecticut.  Decision  
 
EM-VER-072-080410 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunication facility located at 889 Colonel Ledyard Highway, Ledyard, Connecticut.  Decision  
 
EM-CING-072-080612 – New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 889R Colonel Ledyard Highway, Ledyard, Connecticut.  Decision  
 
EM-METROPCS-072-090728 – MetroPCS Massachusetts, LLC d/b/a MetroPCS notice of intent to modify an existing telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut.  Decision
 
EM-CING-072-121031 New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 889R Colonel Ledyard Highway, Ledyard, Connecticut.  Decision  
 
EM-VER-072-121123 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 889 Colonel Ledyard Highway, Ledyard, Connecticut.  Decision  
 
EM-CING-072-130328 – New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 136 Vinegar Hill Road, Ledyard, Connecticut.  Decision  
 
TS-VER-072-130613 – Cellco Partnership d/b/a Verizon Wireless request for an order to approve the shared used of an existing telecommunications facility located at 770 Long Cove Road, Ledyard, Connecticut. Decision Notice of Construction Completion  
 
EM-T-MOBILE-072-140312 – T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 889A Colonel Ledyard Highway, Ledyard, Connecticut. Decision Notice of Construction Completion
 
EM-T-MOBILE-072-140403 T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut. Decision Notice of Construction Completion 
 
EM-T-MOBILE-072-150316 – T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 889A Colonel Ledyard Highway, Ledyard, Connecticut. Decision Notice of Construction Completion  
 
EM-VER-072-150610  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 889 Colonel Ledyard Highway, Ledyard, Connecticut. Decision Extension Request and Council Decision Notice of Construction Completion  
 
TS-VER-072-160706 Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut.  Decision Notice of Construction Completion
 
EM-CING-072-160927 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 136 Vinegar Hill Road, Ledyard, Connecticut. Decision Will Not Complete Letter
 
EM-AT&T-072-161207 – AT&T notice of intent to modify an existing telecommunications facility located at 889R Colonel Ledyard Highway, Ledyard, Connecticut.  Decision Extension Request and Council Decision Compliance with Condition No. 2
 
EM-EVER-072-170413e Eversource notice of intent to modify an existing energy facility located at 301 Whalehead Road, Ledyard, Connecticut. Decision Notice of Construction Completion
 
EM-SPRINT-072-171109 – Sprint notice of intent to modify an existing telecommunications facility located at 889R Colonel Ledyard Highway, Ledyard, Connecticut. Decision Will Not Complete- refilled as EM-SPRINT-072-180622
 
EM-SPRINT-072-180622 – Sprint Spectrum Realty Company, L.P. notice of intent to modify an existing telecommunications facility located at 889R Colonel Ledyard Highway, Ledyard, Connecticut.  Decision Notice of Construction Completion
 
TS-CING-072-190430 – New Cingular Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 581 Colonel Ledyard Highway, Ledyard, Connecticut. Town Letter Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion
 
EM-T-MOBILE-072-190723 – T-Mobile notice of intent to modify an existing telecommunications facility located at 889A Colonel Ledyard Highway, Ledyard, Connecticut. Decision Will Not Complete
 
EM-T-MOBILE-072-190813 – T-Mobile notice of intent to modify an existing telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut. Decision Notice of Construction Completion
 
EM-AT&T-072-200903 – AT&T notice of intent to modify an existing telecommunications facility located at 889A Colonel Ledyard Highway, Ledyard, Connecticut. Decision Notice of Construction Completion
 
EM-CING-072-210524 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 136 Vinegar Hill Road, Ledyard, Connecticut.  Decision Notice of Construction Completion
 
EM-VER-072-210609 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut. Notice of Incomplete Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion
 
EM-VER-072-210622 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 760 (a/k/a 770) Long Cove Road, Ledyard, Connecticut.  Decision Notice of Construction Completion
 
EM-T-MOBILE-072-211105 – T-Mobile notice of intent to modify an existing telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut.  Decision Notice of Construction Completion
 
TS-DISH-072-220513 – Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 760 (a/k/a 770) Long Cove Road, Ledyard, Connecticut.  Town Letter Decision Notice of Construction Completion
 
EM-T-MOBILE-072-220824 – T-Mobile notice of intent to modify an existing telecommunications facility located at 889A Colonel Ledyard Highway, Ledyard, Connecticut. Decision Notice of Construction Completion
 
TS-DISH-072-220907 – Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut. Town Letter Decision Extension Request and Council Decision Extension Request and Council Decision Extension Request and Council Decision  
 
EM-ATT-072-230825 – AT&T notice of intent to modify an existing telecommunications facility located at 889A Colonel Ledyard Highway, Ledyard, Connecticut.  Decision Notice of Construction Completion
 
EM-VER-072-230914 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut. Decision Notice of Construction Commencement Notice of Construction Completion
 
EM-VER-072-240226 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 889A Colonel Ledyard Highway, Ledyard, Connecticut.  Decision Notice of Construction Completion
 
EM-VER-072-250313 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut.  Decision Notice of Construction Commencement
 
EM-T-MOBILE-072-250812 – T-Mobile notice of intent to modify an existing telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut.  Decision