LEDYARD

DOCKET NO. 133 - Intercon Gas, Inc. application for a Certificate of Environmental Compatibility and Public Need for the proposed construction and operation of the Thames River Pipeline. Dismissed

DOCKET NO. 313 - Omnipoint Communications, Inc., a subsidiary of T-Mobile USA, Inc., application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and management of a wireless telecommunications facility at 12 Orchard Drive, Ledyard, Connecticut. Withdrawn.

DOCKET NO. 322 - Optasite, Inc. and Omnipoint Communications, Inc. application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut. (Record), (Findings of Fact), (Opinion), and (Decision and Order).

PETITION NO. 50 - Coastal Cable TV Company petition to place a receiving dish on the Department of Public Safety’s tower, on Vinegar Hill Road in Ledyard. Approved 2/22/80

PETITION NO. 51 - Coastal Cable TV Company modification of tower site in to a State Police tower in Ledyard. Approved 3/19/80

PETITION NO. 55 - Connecticut Department of Transportation petition for the construction of a telecommunications tower, antenna, associated equipment, and equipment building at an existing tower site located on Vinegar Hill off Vinegar Hill Road in Ledyard. Staff Report.  Approved 4/18/80

PETITION NO. 90 - Northeast Utilities petition for modifications to the 115-kV transmission line between Whipple Junction, Mystic Junction, and Mystic Substation in Stonington, Ledyard, and Groton. Staff Report.  Approved 12/13/82

PETITION NO. 141 - The Department of Environmental Protection petition for proposed changes to existing telecommunications facilities in Oxford, Cornwall, Hartford, Sterling, Ledyard, and Colchester.  Staff Report.  Approved 10/8/85

PETITION NO. 278 - Northeast Utilities Service Company and the City of Groton, Department of Utilities petition for proposed modifications to existing 69-kV transmission lines and substations in Montville, Ledyard, Preston, and Groton. Staff Report.  Approved 1/6/92

PETITION NO. 774 - Omnipoint Communications, Inc. and New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing facility located at 136 Vinegar Hill Road, Ledyard, Connecticut. Staff Report.  Approved 7/27/06.

PETITION NO. 842 - The Sprint Nextel Corporation petition  for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the attachment of Sprint’s Antennas to an existing CL&P Tower located at 40 Barton Lane, Ledyard, Connecticut. Withdrawal LetterWithdrawn.
PETITION NO. 1034 – The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing 115-kV transmission line in Ledyard, Connecticut. Staff Report.  Approved 09/06/12.

PETITION NO. 1246 -Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed removal of one existing 69-kV dead-end wood electric transmission line structure, replacement of two existing 69-kilovolt (kV) wood H-frame tap angle electric transmission line structures (Line 100 and Line 400) with two 3-pole weathering steel angle electric transmission line structures, relocation of the conductors from the existing electric transmission line structures to the proposed electric transmission line structures located at Gales Ferry Substation, 301 Whalehead Road, Ledyard, Connecticut and related transmission line and substation improvements. Approved 9/1/16.

PETITION NO. 1259 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Thames River Crossing Structure Replacement Project that includes replacement and re-conductoring of four double-circuit electric transmission line structures along approximately .5 miles of existing Eversource right of way between Montville and Ledyard, Connecticut, and related transmission line structure improvements. Approved 12/8/16.

SUB-PETITION NO. 1293-LG-01 (Ledyard-Groton) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Request for Intervenor Status/Motion for Hearing  Council Acknowledgement of Status and Motion Request Council Denial of Request for Status/Motion for Hearing  Decision  Extension Request and Council Decision  Request for Amendment  Council Decision on Amendment Request  Notice of Completion

PETITION NO. 1436 - Groton Utilities petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement and reconductoring of electric transmission line structures along approximately 1.7 miles of its existing 115-kilovolt (kV)/69-kV 1410/400 double-circuit electric transmission line and 115-kV 1280 single-circuit electric transmission line within existing Groton Utilities electric transmission line right-of-way between Groton/Ledyard town line and Buddington Substation located north of Gold Star Highway in Groton, Connecticut, and related transmission line and substation improvements.  Approved 02/25/21

PETITION NO. 1475– The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Eastern Connecticut Reliability Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 2.1 miles of its existing Nos. 100 and 400 69-kilovolt (kV) and Nos. 1410 and 1280 115-kV electric transmission lines within existing Eversource electric transmission line right-of-way between Montville Junction, Montville and Ledyard Junction, Ledyard, Connecticut, and related electric transmission line and substation improvements. Approved 02/24/22

PETITION NO. 1484 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed modifications to its existing Gales Ferry Substation located at 301 Whalehead Road, Ledyard, Connecticut, and related electric transmission line structure improvements. Approved 05/12/22

PETITION NO. 1486 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 400/500 Lines Rebuild Project consisting of the upgrade of the existing No. 400 69-kilovolt (kV) electric transmission line to 115-kV and the replacement and reconductoring of electric transmission line structures along 8.6 miles of the existing No. 400 electric transmission line within existing Eversource electric transmission line right-of-way between Ledyard Junction in Ledyard and Tunnel Substation in Preston; and the replacement and reconductoring of electric transmission line structures along approximately 4.9 miles of the existing No. 500 69-kV electric transmission line within existing Eversource electric transmission line right-of-way between Hallville Junction in Ledyard and Tunnel Substation in Preston Connecticut, and related electric transmission line and substation improvements. Approved 05/12/22

PETITION NO. 1535  The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Ledyard Junction to Mystic Substation Upgrade Project consisting of the replacement and reconductoring of approximately 12.8 miles of its existing No. 1280 115-kilovolt (kV) electric transmission line within existing Eversource electric transmission right-of-way between Eversource’s Ledyard Junction in Ledyard and Mystic Substation in Stonington, Connecticut and related electric transmission line and substation improvements.  Approved 12/22/22

Dept. of Public Safety, Div. of State Police notice of intent to modify existing telecommunications facilities located at Windham, Colchester; Troop E, Rt. 42, Montville; Mohawk Mountain, Cornwall; Vinegar Hill Rd., east of Gales Ferry, Ledyard.

Dept. of Public Safety, Division of State Police, notice of intent to modify an existing telecommunications facility located at 136 Vinegar Hill Road in Ledyard.

TS-VER-072-001113 - Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 889A Colonel Ledyard Highway, Ledyard, Connecticut.

EM-CING-072-020401 - SNET Mobility, LLC notice of intent to modify an existing telecommunications facility located at 889R Colonel Ledyard Highway, Ledyard, Connecticut.

EM-MARCUS-072-020403 - Marcus Communications, LLC notice of intent to modify an existing telecommunications facility located at 889R Colonel Ledyard Highway, Ledyard, Connecticut.

EM-NEXTEL-072-020621 - Nextel Communications Inc. notice of intent to modify an existing telecommunications facility located at 889R Colonel Ledyard Highway, Ledyard, Connecticut.

EM-T-MOBILE-"UNIVERSAL"-020830 - Omnipoint Facilities Network 2., L.L.C. and Omnipoint Communications, Inc., subsidiaries of T-Mobile USA, Inc. notice of intent to modify existing telecommunications facilities throughout Connecticut.

EM-AT&T–072-020923 - AT&T Wireless PCS, Inc., d/b/a AT&T Wireless notice of intent to modify an existing telecommunications facility located at 889 Colonel Ledyard Highway, Ledyard, Connecticut.
EM-T-MOBILE-072-070315 - Omnipoint Communications, Inc. (T-Mobile) notice of intent to modify an existing telecommunications facility located at 889A Colonel Ledyard Highway, Ledyard, Connecticut.  Decision Letter.
EM-CING-062-070-072-073-080-070815 - New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 890 Evergreen Street, Hamden; Clinton Road/78 Route 81, Killingworth; 899A Colonel Ledyard Highway, Ledyard; 26 Mell Road, Lisbon; and 538 Preston Avenue, Meriden, Connecticut.
EM-VER-072-080410 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunication facility located at 889 Colonel Ledyard Highway, Ledyard, Connecticut.
EM-CING-072-080612 – New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 889R Colonel Ledyard Highway, Ledyard, Connecticut.
 
EM-METROPCS-072-090728 – MetroPCS Massachusetts, LLC d/b/a MetroPCS notice of intent to modify an existing telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut.  Decision
EM-CING-072-121031 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 889R Colonel Ledyard Highway, Ledyard, Connecticut.
EM-CING-072-121031 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 889R Colonel Ledyard Highway, Ledyard, Connecticut.
EM-VER-072-121123- Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 889 Colonel Ledyard Highway, Ledyard, Connecticut.
EM-CING-072-130328 – New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 136 Vinegar Hill Road, Ledyard, Connecticut.
TS-VER-072-130613 – Cellco Partnership d/b/a Verizon Wireless request for an order to approve the shared used of an existing telecommunications facility located at 770 Long Cove Road, Ledyard, Connecticut. Decision. Completion Letter.
EM-T-MOBILE-072-140312 – T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 889A Colonel Ledyard Highway, Ledyard, Connecticut. Decision. Completion Letter
EM-T-MOBILE-072-140403T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut. Decision. Completion Letter.
EM-T-MOBILE-072-150316 – T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 889A Colonel Ledyard Highway, Ledyard, Connecticut. Decision. Completion Letter.
EM-VER-072-150610 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 889 Colonel Ledyard Highway, Ledyard, Connecticut. Decision.  Extension Request and CSC Extension Approval.  Completion Letter.
TS-VER-072-160706 - Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut.  Decision.Completion Letter

EM-CING-072-160927 - New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 136 Vinegar Hill Road, Ledyard, Connecticut. DecisionWill Not Complete Letter

EM-AT&T-072-161207 - AT&T notice of intent to modify an existing telecommunications facility located at 889R Colonel Ledyard Highway, Ledyard, Connecticut.  DecisionExtension Request and Council ApprovalCompliance with Condition No. 2

EM-EVER-072-170413e - Eversource notice of intent to modify an existing energy facility located at 301 Whalehead Road, Ledyard, Connecticut. DecisionCompletion Letter

EM-SPRINT-072-171109 – Sprint notice of intent to modify an existing telecommunications facility located at 889R Colonel Ledyard Highway, Ledyard, Connecticut. DecisionWill Not Complete- refilled as EM-SPRINT-072-180622

TS-CING-072-190430 - New Cingular Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 581 Colonel Ledyard Highway, Ledyard, Connecticut. Town LetterIncomplete LetterResponse to Incomplete and Council Acknowledgement  Decision Notice of Completion

EM-SPRINT-072-180622 - Sprint Spectrum Realty Company, L.P. notice of intent to modify an existing telecommunications facility located at 889R Colonel Ledyard Highway, Ledyard, Connecticut.  Decision  Notice of Completion

EM-T-MOBILE-072-190723 - T-Mobile notice of intent to modify an existing telecommunications facility located at 889A Colonel Ledyard Highway, Ledyard, Connecticut. Decision  Will Not Complete

EM-T-MOBILE-072-190813 – T-Mobile notice of intent to modify an existing telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut. Decision  Notice of Completion

EM-AT&T-072-200903 - AT&T notice of intent to modify an existing telecommunications facility located at 889A Colonel Ledyard Highway, Ledyard, Connecticut. Decision Notice of Completion

EM-CING-072-210524 - New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 136 Vinegar Hill Road, Ledyard, Connecticut.  Decision Notice of Completion

EM-VER-072-210609 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut. Notice of Incomplete  Response to Incomplete and Council Acknowledgement Decision  Notice of Completion

EM-VER-072-210622 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 760 (a/k/a 770) Long Cove Road, Ledyard, Connecticut.  Decision Notice of Completion

EM-T-MOBILE-072-211105 - T-Mobile notice of intent to modify an existing telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut.  Decision  Notice of Completion

TS-DISH-072-220513 – Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 760 (a/k/a 770) Long Cove Road, Ledyard, Connecticut.  Town Letter Decision Notice of Construction Completion

EM-T-MOBILE-072-220824 T-Mobile notice of intent to modify an existing telecommunications facility located at 889A Colonel Ledyard Highway, Ledyard, Connecticut. Decision  Notice of Completion

TS-DISH-072-220907 - Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut. Town Letter  Decision Extension Request and Council Extension Decision   Extension Request and Council Extension Approval

EM-ATT-072-230825 – AT&T notice of intent to modify an existing telecommunications facility located at 889A Colonel Ledyard Highway, Ledyard, Connecticut.  Decision Notice of Construction Completion

EM-VER-072-230914 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 12 Orchard Drive, Ledyard, Connecticut. Decision  Notice of Construction Commencement Notice of Construction Completion

EM-VER-072-240226 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 889A Colonel Ledyard Highway, Ledyard, Connecticut.  Decision