FRANKLIN
DOCKET NO. 12 -CL&P application for a Certificate of Environmental Compatibility and Public Need with respect to the construction of an overhead 345 kV electric transmission line between the Millstone Point generating station, in Waterford, and the Manchester substation, in Manchester. DENIED, became Docket No. 25. (Findings of Fact), (Opinion), (Dissenting Opinion), and (Decision and Order).
DOCKET NO. 25 - Connecticut Light and Power Company and Hartford Electric Light Company Certificate with respect to the construction of an overhead 345-kV electric transmission line between the Millstone Point generating station in Waterford, and the Manchester Substation in Manchester. (Franklin) (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 133 - Intercon Gas, Inc. application for a Certificate of Environmental Compatibility and Public Need for the proposed construction and operation of the Thames River Pipeline. DISMISSED.
PETITION NO. 781 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 36 Ayer Road, Franklin, Connecticut. Staff Report. Approved 8/31/06.
PETITION NO. 1072 – Algonquin Gas Transmission, LLC Petition for a Declaratory Ruling Regarding the Jurisdiction of the Connecticut Siting Council over the construction or replacement of natural gas pipeline facilities in the towns of Danbury, Cromwell/Rocky Hill, Lebanon/Franklin/Norwich and Montville, Connecticut; modifications to compressor stations in the towns of Oxford, Cromwell and Chaplin Connecticut; modifications to metering stations in the towns of Berlin, Danbury, Farmington, Glastonbury, Guilford, Middletown, Montville, North Haven, Norwich, Plainville, Pomfret, Putnam, Southbury, Vernon and Windham, Connecticut; and for recommendations regarding siting, environmental mitigation measures, and construction procedures to the Federal Energy Regulatory Commission. Decision Letter and Staff Report Decision: 10/31/13.
PETITION NO. 1194 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on an existing abandoned grain elevator structure at 140 Route 32, Franklin, Connecticut. Staff Report and Decision Letter. Completion Letter. Approved 11/12/15.
SUB-PETITION NO. 1293 -LFBNM-01 (Lebanon-Franklin-Bozrah-Norwich-Montville) - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements to comply with the updated National Electric Safety Code clearance requirements. Decision Minor Project Change with CSC Response Extension Request Access Road Request with CSC Response Modification Request with CSC Response Notice of Completion
SUB-PETITION 1293 - LFB-01 (Lebanon-Franklin-Bozrah) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements to comply with the updated National Electric Safety Code clearance requirements. Decision Completion Letter
PETITION NO. 1566- The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Card Substation to Wawecus Junction Upgrade Project consisting of the replacement of electric transmission line structures along its existing 12.5-mile electric transmission right-of-way shared by its existing 115-kilovolt (kV) Nos. 1080/1490 and 1080/1070 Lines between Card Substation in Lebanon, Stockhouse Road Substation in Bozrah and Wawecus Junction in Norwich, Connecticut traversing the municipalities of Lebanon, Franklin, Bozrah and Norwich, and related electric transmission line and substation improvements. Approved 09/28/23
PETITION NO. 1626 – North Franklin Solar One, LLC and Verogy Holdings, LLC d/b/a Verogy, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.975-megawatt AC solar photovoltaic electric generating facility and associated equipment located at 931 Route 32, Franklin, Connecticut, and associated electrical interconnection. Approved 08/15/24
EM-VER-053-060927 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 89 Dr. Nott Road, Franklin, Connecticut. Decision.
EM-NEXTEL-053-061130 - Nextel Communications of the Mid-Atlantic, Inc. notice of intent to modify an existing telecommunications facility located at Nott Road (Lot 10), Franklin, Connecticut. Decision.
TS-CING-053-100216 – New Cingular Wireless PCS, LLC request for an order to approve tower sharing at an approved telecommunications facility located at 5 Tyler Drive, Franklin, Connecticut. Decision.
EM-CING-053-190619 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located 5 Tyler Drive, Franklin, Connecticut. Incomplete Letter 2nd Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Condition Submission
EM-T-MOBILE-053-210630 – T-Mobile notice of intent to modify an existing telecommunications facility located at 89 Dr. Nott Road, Franklin, Connecticut. Decision Notice of Completion
TS-T-MOBILE-053-210901 - T-Mobile request for an order to approve tower sharing at an existing telecommunications facility located at 5 Tyler Drive, Franklin, Connecticut. Town Letter Decision Notice of Completion
EM-CING-053-210917 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 89 Doctor Nott Road, Franklin, Connecticut. Decision-Denial
EM-VER-053-210929 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 89 Dr. Nott Road, Franklin, Connecticut. Decision Extension Request and Council Extension Approval Notice of Cancellation
EM-T-MOBILE-053-211018 - T-Mobile notice of intent to modify an existing telecommunications facility located at 89 Dr. Nott Road, Franklin, Connecticut. Decision Notice of Completion
TS-CING-053-211028 - New Cingular Wireless PCS, LLC (AT&T) request for an order to approve tower sharing at an existing telecommunications facility located at 89 Dr. Nott Road, Franklin, Connecticut. Town Letter Decision Notice of Completion
EM-VER-053-211130 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 36 Ayer Road, Franklin, Connecticut. Decision Notice of Completion
TS-T-MOBILE-053-220801 – T-Mobile request for an order to approve tower sharing at an existing telecommunications facility located at 36 Ayer Road, Franklin, Connecticut. Town Letter Decision Withdrawn
TS-DISH-053-230221 - Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 36 Ayer Road, Franklin, Connecticut. Town Letter Decision Extension Request and Council Extension Approval
EM-ATC-053-231116 – American Tower Corporation notice of intent to modify an existing telecommunications facility located at 89 Dr. Nott Road, Franklin, Connecticut. Decision
EM-VER-053-240221 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 89 Dr. Nott Road, Franklin, Connecticut. Decision Notice of Construction Commencement Notice of Construction Completion