Town of Farmington
DOCKET NO. 55 – United Cable Television Service Corporation and United Cable Television Corporation of Connecticut Certificate for a community antenna television head-end facility on Rattlesnake Mountain, Farmington. (Findings of Fact) (Opinion) and (Decision and Order)
DOCKET NO. 97 – The Connecticut Light and Power Company Certificate for the reconstruction of a 115-kV electric transmission line between Farmington Substation in Farmington, and North Bloomfield Substation in Bloomfield. (Findings of Fact) (Opinion) (Dissenting Opinion) and (Decision and Order)
DOCKET NO. 274 – AT&T Wireless PCS, LLC d/b/a AT&T Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a wireless telecommunications facility at Hyde Road, Farmington, Connecticut. (Findings of Fact) (Opinion) and (Decision and Order)
DOCKET NO. 282 – Sprint Spectrum, L.P., d/b/a Sprint PCS application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a telecommunications facility at 1 Westerberg Drive, Farmington, Connecticut. (Findings of Fact) (Opinion) and (Decision and Order) Council Request for Compliance Applicant's Compliance Response
DOCKET NO. 356 – Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and management of a telecommunications facility located at 199 Town Farm Road, Farmington, Connecticut. (Record) (Withdrawal Letter) WITHDRAWN (See Docket No. 374)
DOCKET NO. 374 – Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a telecommunications facility located at 199 Town Farm Road, Farmington, Connecticut. (Record) (Findings of Fact) (Opinion)(Decision and Order)
DOCKET NO. 454 – Tower Holdings, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Farmington Tax Assessor Parcel ID Maps 25 and 26, Lots 3A and 3B, 199 Brickyard Road, Farmington, Connecticut. (Record) (Findings of Fact) (Opinion) (Decision and Order) DENIED
DOCKET NO. 480 – Phoenix Towers International US Towers II, LLC SectorSite, LLC and T-Mobile Northeast, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility on town-owned property behind the Southwest Fire Station located at 2 Westwoods Drive, Farmington, Connecticut. (Findings of Fact) (Opinion) (Decision and Order)
PETITION NO. 125 – Algonquin Gas Transmission Company petition to construct a natural gas transmission line between Cheshire and Farmington. Approved 03/26/85
PETITION NO. 326 – Springwich Cellular Limited Partnership petition to replace an existing tower and install antennas on the replacement tower at the University of Connecticut Health Center, 263 Farmington Avenue, Farmington, Connecticut. Staff Report Approved 07/26/94
PETITION NO. 423 – Omnipoint Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modification to an existing Connecticut Light & Power high-voltage electric transmission line support structure located between Maple Ridge Road and New Britain Avenue in Farmington. Staff Report Approved 08/16/99
PETITION NO. 561 – Robert J. Rigney, et. al., petition for a declaratory ruling ordering a hearing to determine the effects associated with the construction, operation, and maintenance of a telecommunications facility located at 319-321 New Britain Avenue, Farmington, Connecticut. Staff Report Decision Denied 09/05/02.
PETITION NO. 582 – Northeast Utilities Service Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications at the existing Connecticut Light and Power Company Farmington Substation, located off Old Mountain Road, Farmington, Connecticut. Staff Report Approved 09/25/02
PETITION NO. 644 – Sprint Spectrum, L.P., d/b/a Sprint PCS and Southwestern Bell Mobile Systems, LLC, d/b/a Cingular Wireless for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the addition of Sprint PCS and Cingular Wireless Antennas to an existing Connecticut Light & Power Company electrical transmission structure at 45 Maple Ridge Drive, Farmington, Connecticut. Staff Report Approved 10/29/03
PETITION NO. 823 – Sprint Nextel Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light & Power electrical transmission structure (pole #8012) located at Maple Ridge Drive, Farmington, Connecticut. Staff Report Approved 08/29/07
PETITION NO. 942 – The Clear Wireless LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 82 Lovely Street, Farmington, Connecticut. Record Withdrawal Letter Withdrawn 07/22/10
PETITION NO. 1072 – Algonquin Gas Transmission, LLC Petition for a Declaratory Ruling Regarding the Jurisdiction of the Connecticut Siting Council over the construction or replacement of natural gas pipeline facilities in the towns of Danbury, Cromwell/Rocky Hill, Lebanon/Franklin/Norwich and Montville, Connecticut; modifications to compressor stations in the towns of Oxford, Cromwell and Chaplin Connecticut; modifications to metering stations in the towns of Berlin, Danbury, Farmington, Glastonbury, Guilford, Middletown, Montville, North Haven, Norwich, Plainville, Pomfret, Putnam, Southbury, Vernon and Windham, Connecticut; and for recommendations regarding siting, environmental mitigation measures, and construction procedures to the Federal Energy Regulatory Commission. Decision and Staff Report Decision 10/31/13
SUB-PETITION NO. 1133-VER-20150319 – Cellco Partnership d/b/a Verizon Wireless sub-petition for a declaratory ruling for approval of an eligible facility request for modifications to an existing telecommunications facility located at 1 Westerberg Drive, Farmington, Connecticut. Decision Notice of Construction Completion
SUB-PETITION NO. 1133-CING-20240605 – New Cingular Wireless PCS, LLC eligible facility request for modifications to an existing telecommunications facility located at 1 Westerberg Drive, Farmington, Connecticut. Notice of Incomplete Request Acknowledgement of Complete Request Farmington Planning and Zoning Comments Decision Notice of Construction Completion
SUB-PETITION NO. 1133-ATT-20250408 – AT&T eligible facility request for modifications to an existing telecommunications facility located at 130 Birdseye Road, Farmington, Connecticut. Notice of Incomplete Request Council Acknowledgement of Complete Request Decision Notice of Construction Completion
PETITION NO. 1180 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing building at Holy Family Monastery Retreat House & Center located at 303 Middle Road, Farmington, Connecticut. Decision and Staff Report Approved 10/01/15
PETITION NO. 1275 – Bloom Energy Corporation, as an agent for Stanley Black& Decker, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 200-Kilowatt Fuel Cell Facility to be located at the Stanley Access Technologies building, 65 Scott Swamp Road, Farmington, Connecticut. Approved 02/16/17
SUB-PETITION NO. 1293-FA-01 (Farmington) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Construction Completion
SUB-PETITION NO. 1293-FWHABS-01 (Farmington, West Hartford, Avon, Bloomfield, Simsbury) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Decision Notice of Construction Completion
SUB-PETITION NO. 1293 -FNNBB (Farmington, Newington, New Britain, Berlin) – Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements to comply with the updated National Electric Safety Code clearance requirements. Decision Request for Minor Project Change Revision Decision Notice of Construction Completion
SUB-PETITION NO. 1293-FA-02 (Farmington) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Construction Completion
PETITION NO. 1348 – Safari Energy, LLC, as agent for West Farms Mall, LLC, petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 2.019-megawatt AC solar photovoltaic electric generating facility located at West Farms Mall, 1500 New Britain Avenue, West Hartford and 500 South Road, Farmington, Connecticut. Approved 9/27/18
PETITION NO. 1434 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a new 63-foot steel pole and associated radio communications equipment located at the Eversource-owned Old Mountain Road Substation, 29 Old Mountain Road, Farmington, Connecticut. Approved 01/14/21
BANM notice of intent to modify an existing telecommunications facility located on Rattlesnake Mountain, Farmington. January 30, 1991 filing November 22, 1995 Antenna Upgrade Filing
Springwich Cellular Ltd. Partnership notice of intent to modify an existing telecommunications facility located at 263 Farmington Ave., Farmington. Decision
Springwich Cellular Ltd. Partnership notice of intent to replace an existing tower located at UConn, Farmington Ave., Farmington. Decision-Denial
Springwich Cellular Ltd. Partnership notice of intent to modify an existing telecommunications facility located at 82 Lovely St., Unionville.
TS-NEXTEL-052-990526 – Nextel Communications request for an order to approve tower sharing at an existing telecommunications facility located at 130 Birdseye Road in Farmington, Connecticut.
TS-OUTLET-052-990629 – Outlet Broadcasting request for an order to approve tower sharing for the replacement of an existing facility and removal of an existing facility located on Rattlesnake Mountain in the Town of Farmington.
TS-XM-052-001218 – XM Satellite Radio request for an order to approve tower sharing at an existing telecommunications facility located at Rattlesnake Mountain, Farmington, Connecticut.
TS-SPRINT-052-020118 – Sprint Spectrum, L.P. d/b/a Sprint PCS request for an order to approve tower sharing at an existing telecommunications facility located at 319-321 New Britain Avenue, Farmington, Connecticut. Decision
TS-AT&T-052-020624 – AT&T Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 319-321 New Britain Avenue, Farmington, Connecticut.
EM-CING-007-017-052-148-020730 – SNET Mobility, LLC notice of intent to modify existing telecommunications facilities located in Berlin, Bristol, Farmington, and Wallingford, Connecticut.
EM-T-MOBILE-052-020830 – Omnipoint Communications d/b/a T-Mobile USA, Inc. notice of intent to modify an existing telecommunications facility located at 40 Maple Ridge Road, Farmington, Connecticut.
EM-T-MOBILE-"UNIVERSAL"-020830 – Omnipoint Facilities Network 2., L.L.C. and Omnipoint Communications, Inc., subsidiaries of T-Mobile USA, Inc. notice of intent to modify existing telecommunications facilities throughout Connecticut.
EM-CING-025-102-104-111-130-052-148-165-020917 – Southwestern Bell Mobile Systems, LLC notice of intent to modify existing telecommunications facilities located in Cheshire, North Stonington, Norwich, Plymouth, Southbury, Unionville (Farmington), Wallingford, and Windsor Locks, Connecticut.
EM-VER-052-140619 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 190 Colt Highway, Farmington, Connecticut. Withdrawn