FAIRFIELD
DOCKET NO. 86 - Metro Mobile CTS of Fairfield County, Inc. Certificate for cellular telephone antennas and associated equipment on Woodhouse Road in Fairfield, and in Greenwich. (Findings of Fact) (Opinion), and (Decision and Order).
DOCKET NO. 141 - The Connecticut Light and Power Company and the United Illuminating Company Certificate for a 115-kV electric transmission line and related telecommunications equipment between the Pequonnock Substation in Bridgeport and the Ely Avenue Junction in Norwalk. (Fairfield) (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 272 - The Connecticut Light and Power Company and The United Illuminating Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV electric transmission line and associated facilities between the Scovill Rock Switching Station in Middletown and the Norwalk Substation in Norwalk, Connecticut. This includes construction of the Beseck Switching Station in Wallingford, East Devon Substation in Milford, and Singer Substation in Bridgeport and modifications to the Scovill Rock Switching Station and the Norwalk Substation and certain interconnections. (Fairfield) (Findings of Fact), (Appendix A), (Appendix B), (Appendix C), (Opinion), (Decision and Order), (Record).
DOCKET NO. 495 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 5151 Park Avenue, Fairfield, Connecticut. (Findings of Fact) (Opinion) (Decision and Order)
DOCKET NO. 495A - Cellco Partnership d/b/a Verizon Wireless Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located 5151 Park Avenue, Fairfield, Connecticut. Reopening of this Certificate based on changed conditions pursuant to Connecticut General Statutes §4-181a(b). (Findings of Fact) (Opinion) (Decision and Order)
DOCKET NO. 516– The United Illuminating Company (UI) application for a Certificate of Environmental Compatibility and Public Need for the Fairfield to Congress Railroad Transmission Line 115-kV Rebuild Project that consists of the relocation and rebuild of its existing 115- kilovolt (kV) electric transmission lines from the railroad catenary structures to new steel monopole structures and related modifications along approximately 7.3 miles of the Connecticut Department of Transportation’s Metro-North Railroad corridor between Structure B648S located east of Sasco Creek in Fairfield and UI’s Congress Street Substation in Bridgeport, and the rebuild of two existing 115-kV transmission lines along 0.23 mile of existing UI right-of-way to facilitate interconnection of the rebuilt 115-kV electric transmission lines at UI’s existing Ash Creek, Resco, Pequonnock and Congress Street Substations traversing the municipalities of Bridgeport and Fairfield, Connecticut.(Findings of Fact) (Opinion) (Decision and Order) and (Conclusions of Law)
PETITION NO. 3 - The Connecticut Light and Power Company petition for reconductoring a portion of an existing 115-kV line between Trumbull Junction and Norwalk Substation and a 115-kV line on same right of way between Old Town Substation and Norwalk Substation and crossing facilities of Penn Central Transportation Company, the Southern New England Telephone Company, and the United Illuminating Company in Trumbull, Bridgeport, Fairfield, Easton, Weston, Wilton, and Norwalk. Approved 10/13/72
PETITION NO. 291 - The United Illuminating Company petition for the installation of an optical fiber ground wire system between Ash Creek Substation in Bridgeport and structure No. B714 on the railroad catenary system of the Northeast Railroad Corridor in Fairfield. Staff Report. Approved 9/9/92
PETITION NO. 304 - Metro Mobile CTS of Fairfield County, Inc. petition for proposed installation of antennas on an existing watertank and construction of an equipment building off Black Rock Turnpike, Fairfield. Approved 5/6/93
PETITION NO. 343 - Springwich Cellular Ltd. Partnership petition that no Certificate of Environmental Compatibility and Public Need is required for the replacement of an existing communications tower and for the installation of cellular antennas on the replacement tower located at 55 Walls Drive, Fairfield. Staff Report. Approved 10/10/95
PETITION NO. 383 - Sprint PCS petition that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to a Connecticut Light and Power (CL&P) 115-kv electric transmission line support structure in Fairfield, Connecticut. Staff Report. Findings of Fact. Opinion. Decision & Order. Approved 12/18/97
PETITION NO. 387 - Bell Atlantic Mobile petition for declaratory ruling that no amendment to the Certificate of Environmental Compatibility and Public Need is required to replace an existing telecommunications tower and accommodated tower sharing at 281 Woodhouse Road in Fairfield. Staff Report. Approved 3/16/98
PETITION NO. 408 - United Illuminating Company Petition that no Certificate of Environmental Compatibility and Public Need is required for modification to the Hawthorne Substation facility in Fairfield. Staff Report. Approved 12/17/98
PETITION NO. 437 - United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of receive-only telecommunications facilities associated with a remote network meter reading system within UI's service area. Staff Report. Approved nine of eleven sites 11/9/99. Reconsideration of the Woodbridge site. Approved 3/22/00. Reconsidered and Approved Ansonia site 8/10/00.
PETITION NO. 438 - United Illuminating Company (UI) UIL Holdings Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of transmitters and receivers associated with a remote network meter reading system within UI's service area. Staff Report. Approved 11/9/99.
PETITION NO. 462 - United Illuminating (UI) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of telecommunications equipment associated with a remote network meter reading system at Canisius Hall, Fairfield University in Fairfield, Connecticut. Staff Report. Approved 5/24/00.
PETITION NO. 471 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric transmission facility located on Route 136, Fairfield, Connecticut. Staff Report. Approved 7/25/00.
PETITION NO. 475 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located on Morehouse Drive, Fairfield, Connecticut (Petition No. 383). Staff Report. Approved 8/31/00.
PETITION NO. 525 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power electric transmission facility located on Morehouse Road, Fairfield, Connecticut. Staff Report. Approved 09/12/01.
PETITION NO. 636T - Omnipoint Facilities Network 2, L.L.C., a subsidiary of T-Mobile USA, Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to existing United Illuminating electric transmission line support structure off of Timko Street, Fairfield, Connecticut. Staff Report. Approved 07/22/03.
PETITION NO. 696 - Johnson Controls, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 200-kW Fuel Cell at the Water Pollution Control Facility located at 330 One Rod Highway, Fairfield, Connecticut. Staff Report. Approved 10/26/04.
PETITION NO. 786 - The United Illuminating Company petition for a declaratory ruling no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing United Illuminating Company’s transmission line for the Fairfield Rail Station, located off of Timko Street and Frank Street, Fairfield, Connecticut. Staff Report. Approved 09/14/06.
PETITION NO. 989 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 400 kW Fuel Cell to be located at 350 Grasmere Avenue, Fairfield, Connecticut. Staff Report. Status Update. Approved 04/28/11.
PETITION NO. 1082 - Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200 kW Fuel Cell to be located at the Home Depot store, 541 Kings Highway Cut-Off, Fairfield, Connecticut. Staff Report.Status Update - Constructed Approved 01/23/14.
PETITION NO. 1120- The United Illuminating Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Hawthorne Substation located at 180 Hawthorne Drive, Fairfield, Connecticut. Record, Findings of Fact, Opinion, Decision and Order. Approved 06/25/15.
PETITION NO. 1270 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to replace an existing customer-side 200-kilowatt fuel cell facility with a 460-kilowatt customer-side combined heat and power fuel cell facility to be located at the Fairfield Wastewater Treatment Facility, 183 Richard White Way, Fairfield, Connecticut. Approved 03/16/17.
SUB-PETITION NO. 1293-EF-01 (Easton-Fairfield) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Completion
PETITION NO. 1370 - The United Illuminating Company (UI) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for replacement of its existing No. 1720 Line Relay in order to comply with the Northeast Power Coordinating Council’s Implementation Plan on the ISO New England, Inc. Bulk Power System between Connecticut Light and Power Company d/b/a Eversource Energy’s Norwalk Substation in Norwalk, Connecticut and UI’s Hawthorne Substation located at 180 Hawthorne Drive, Fairfield, Connecticut and related substation improvements. Approved 06/06/19
PETITION NO. 1470– Cellco Partnership d/b/a Verizon Wireless, New Cingular Wireless PCS, LLC and T-Mobile Northeast, LLC joint petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a temporary telecommunications facility and associated equipment located at Sacred Heart University, 5151 Park Avenue, Fairfield, Connecticut. Approved 12/16/21
PETITION NO. 1549 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 1714 Line Rebuild Project consisting of the replacement and reconductoring of approximately 9.4 miles of its existing Nos. 1714, 1720, and 1222 115-kilovolt (kV) electric transmission lines and one structure along its 1637 line within existing Eversource electric transmission right-of-way between Eversource’s Weston Substation, 85 Weston Street in Weston and the United Illuminating Company’s Old Town Substation, 122 Kaechele Place in Bridgeport, Connecticut traversing Weston, Fairfield, Easton and Bridgeport and related electric transmission line and substation improvements. Approved 02/16/23
Bell Atlantic NYNEX Mobile - Antenna Upgrades - 40 Blackrock Turnpike, East Fairfield, Connecticut. November 22, 1995 Antenna Upgrade Filing
BANM notice of intent to allow Springwich Cellular Ltd. Partnership to install cellular telecommunications antennas and associated equipment on an existing facility site located off Woodhouse Rd., Fairfield. 1992 filing
BANM notice of intent to modify an existing telecommunications facility located on 281 Woodhouse Road in Fairfield. November 22, 1995 Antenna Upgrade Filing
TS-SCLP-051-990219 - Springwich Cellular Limited Partnership request for an order to approve tower sharing at an existing telecommunications facility located at 3965 Congress Street in Fairfield. Decision
EM-CROWN-051-990706 - Crown Atlantic Company LLC notice of intent to modify an existing telecommunications facility located at 281 Woodhouse Road in Fairfield. Decision. Request for Minor Modification. Decision on Minor Modification.
EM-CROWN-051-991014 - Crown Atlantic Company LLC notice of intent to modify an existing telecommunications facility located at 281 Woodhouse Road in Fairfield.
EM-METRICOM-051-001128 - Metricom, Inc. notice of intent to modify an existing telecommunications facility located at 287 Woodhouse Road, Fairfield, Connecticut.
EM-XM-051-001129 - XM Satellite Radio notice of intent to modify an existing telecommunications facility located at 287 Woodhouse Road, Fairfield, Connecticut.
EM-NEXTEL-051-010824 - Nextel Communications Inc. notice of intent to modify an existing telecommunications facility located at 2189-2279 Black Rock Turnpike, Fairfield, Connecticut.
EM-AT&T-009-051-020227 - AT&T Wireless notice of intent to modify existing telecommunications facilities located in Bethel and Fairfield, Connecticut.
EM-AT&T-034-051-144-161-020703 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless notice of intent to modify existing telecommunications facilities located in Danbury, Fairfield, Trumbull, and Wilton, Connecticut. Morehouse Rd., Fairfield File Only
EM-T-MOBILE-"UNIVERSAL"-020830 - Omnipoint Facilities Network 2., L.L.C. and Omnipoint Communications, Inc., subsidiaries of T-Mobile USA, Inc. notice of intent to modify existing telecommunications facilities throughout Connecticut.
EM-CING-015-034-035-051-057-085-103-117-126-135-138-157-158-161-020917 - Southwestern Bell Mobile Systems, LLC notice of intent to modify existing telecommunications facilities located in Bridgeport, Danbury, Darien, Fairfield, Greenwich, Monroe, Newtown, Norwalk, Redding, Shelton, Stamford, Stratford, Weston, Westport, and Wilton, Connecticut.
EM-AT&T-"UNIVERSAL"-030221 - AT&T Wireless PCS LLC d/b/a AT&T Wireless notice of intent to modify existing telecommunications facilities throughout Connecticut.
EM-T-MOBILE-051-030501 - Omnipoint Facilities Networks 2, LLC notice of intent to modify an existing telecommunications facility located at 281 Woodhouse Road, Fairfield, Connecticut.
EM-T-MOBILE-051-030929 - Omnipoint Facilities Networks 2, LLC, notice of intent to modify an existing telecommunications facility located at 3965 Congress Street, Fairfield, Connecticut.
EM-VER-139-051-089-060428 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify existing telecommunications facilities located at 44 Fyler Place, Suffield; 281 Woodhouse Road, Fairfield; 200 Stanley Street, New Britain; and 167 Lester Street, New Britain, Connecticut.
EM-SPRINT-NEXTEL-051-080131 – Sprint Nextel notice of intent to modify an existing telecommunications facility located at 2189 Black Rock Turnpike, Fairfield, Connecticut.
EM-CING-051-110527 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 281 Wood House Road, Fairfield, Connecticut.
EM-CING-051-110614 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 3965 Congress Street, Fairfield, Connecticut.
EM-CING-051-110629 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 55 Walls Drive, Fairfield, Connecticut.
EM-CING-051-111223 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 100 Reef Road, Fairfield, Connecticut. Decision
EM-T-MOBILE-051-120614 - Omnipoint Communications, as subsidiary of T-Mobile USA, Inc., notice of intent to modify an existing telecommunications facility located at 100 Reef Road, Fairfield, Connecticut. Decision. Completion Letter
EM-T-MOBILE-051-151019 - T-Mobile notice of intent to modify an existing telecommunications facility located at 281 Woodhouse Road,EM-CING-051-150220 - AT&T Mobility notice of intent to modify an existing telecommunications facility located at 281 Wood House Road, Fairfield, Connecticut. Incomplete Letter. Revised Filing. Decision. Extension Request and CSC Decision. Completion Letter Fairfield, Connecticut. Decision. Completion Letter
EM-T-MOBILE-051-151125 - T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at Route 136 (Westport Turnpike), Fairfield, Connecticut. Decision Will Not Complete Modifications Letter
EM-CING-051-160226 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 55 Walls Drive, Fairfield, Connecticut. DecisionExtension Request and CSC Decision2nd Extension Request and CSC DecisionCompletion
EM-AT&T-051-160914 – AT&T notice of intent to modify an existing telecommunications facility located at 281 Wood House Road, Fairfield, Connecticut. Decision. Compliance with Condition #1Completion Letter
EM-AT&T-051-160923 – AT&T notice of intent to modify an existing telecommunications facility located at 100 Reef Road, Fairfield, Connecticut. Decision. Condition #1 Compliance.
EM-CING-051-161007 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 3965 Congress Street, Fairfield, Connecticut. Decision Extension Request and CSC Decision Outstanding Condition Audit Letter Outstanding Condition Letter Response and 2nd Outstanding Condition Letter
EM-VER-051-161101 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 281 Woodhouse Road, Fairfield, Connecticut. Decision Completion Letter
EM-UI-051-161101e – The United Illuminating Company notice of intent to modify an existing energy facility located at 180 Hawthorne Drive, Fairfield, Connecticut. Decision Completion Letter
EM-AT&T-051-161121 - AT&T notice of intent to modify an existing telecommunications facility located at 100 Reef Road, Fairfield, Connecticut. Decision Completion Letter
EM-T-MOBILE-051-170303 - T-Mobile notice of intent to modify an existing telecommunications facility located at 280 Morehouse Drive, Fairfield, Connecticut. Decision Extension Request and CSC Approval Completion Letter
EM-AT&T-051-170508 – AT&T notice of intent to modify an existing telecommunications facility located at 280 Morehouse Drive, Fairfield, Connecticut. Decision Completion Letter
EM-T-MOBILE-051-170623 - T-Mobile notice of intent to modify an existing telecommunications facility located at 640 Westport Turnpike, Fairfield, Connecticut. Denied
EM-AT&T-051-171005 – AT&T notice of intent to modify and existing telecommunications facility located at 55 Walls Drive, Fairfield, Connecticut. Decision Completion Letter
EM-SPRINT-051-171018 – Sprint notice of intent to modify an existing telecommunications facility located at 3965 Congress Street, Fairfield, Connecticut. Decision Completion Letter
EM-AT&T-051-180509 – AT&T notice of intent to modify an existing telecommunications facility located at 281 Woodhouse Road, Fairfield, Connecticut. Decision Completion Status Sheet Completion Letter
EM-VER-051-180620 – Cellco Partnership, d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 3965 Congress Street, Fairfield, Connecticut. Decision Extension Request and Council Approval Will Not Complete Letter
EM-SPRINT-051-180801 – Sprint notice of intent to modify an existing telecommunications facility located at 281 Wood House Road, Fairfield, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Construction Complete
EM-SPRINT-051-180802 - Sprint notice of intent to modify an existing telecommunications facility located at 2189-2215 Black Rock Turnpike, Fairfield, Connecticut. Decision Completion Letter Construction Complete
EM-AT&T-051-190204 - AT&T Mobility notice of intent to modify an existing telecommunications facility located at 100 Reef Road, Fairfield, Connecticut. Incomplete Letter 2nd Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Completion Letter
EM-UI-015-051-158-190306e - United Illuminating Company (UI) notice of intent to modify an existing energy facility located between Pequonnock Substation in Bridgeport, Connecticut to Ash Creek Substation in Fairfield, Connecticut, and Sasco Creek Substation in Westport, Connecticut. Decision Completion Letter
EM-CING-051-190416 - New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 3965 Congress Street, Fairfield, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Construction Complete Condition Submission
EM-SPRINT-051-190417 – Sprint notice of intent to modify an existing telecommunications facility located at 100 Reef Road, Fairfield, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Completion
EM-SPRINT-051-190516 - Sprint notice of intent to modify an existing telecommunications facility located at 281 Wood House Road, Fairfield, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Completion Letter
EM-T-MOBILE-051-190723 – T-Mobile notice of intent to modify an existing telecommunications facility located at 3965 Congress Street, Fairfield, Connecticut. Incomplete Letter Response to Incomplete and 2nd Incomplete Letter Decision-Denial
EM-T-MOBILE-051-190924 – T-Mobile notice of intent to modify an existing telecommunications facility located at 3965 Congress Street, Fairfield, Connecticut. Decision Withdrawn
EM-SPRINT-051-191003– Sprint notice of intent to modify an existing telecommunications facility located at 280 Morehouse Drive, Fairfield, Connecticut. Decision Will Not Complete
EM-CING-051-200325 - New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 281 Wood House Road, Fairfield, Connecticut. Decision Notice of Completion
EM-VER-051-200528 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 3965 Congress Street, Fairfield, Connecticut. Decision Extension Request and Council Decision Notice of Completion
EM-T-MOBILE-051-200708 – T-Mobile notice of intent to modify an existing telecommunications facility located 100 Reef Road, Fairfield, Connecticut. Decision Extension Request and Council Approval Notice of Cancellation
EM-T-MOBILE-051-200911 - T-Mobile notice of intent to modify an existing telecommunications facility located at 3965 Congress Street, Fairfield, Connecticut. Decision Extension Request and Council Decision Notice of Cancellation
EM-T-MOBILE-051-210902 - T-Mobile notice of intent to modify an existing telecommunications facility located at 3965 Congress Street, Fairfield, Connecticut. Decision Notice of Cancellation
EM-T-MOBILE-051-211021 - T-Mobile notice of intent to modify an existing telecommunications facility located at 280 Morehouse Drive, Fairfield, Connecticut. Decision Notice of Cancellation
EM-T-MOBILE-051-211210 - T-Mobile notice of intent to modify an existing telecommunications facility located at 281 Wood House Road, Fairfield, Connecticut. Decision Will Not Complete
EM-VER-051-220207- Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 3965 Congress Street, Fairfield, Connecticut. Decision Extension Request and Council Extension Approval Notice of Project Cancellation
TS-DISH-051-220503 – Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 281 Wood House Road, Fairfield, Connecticut. Town Letter Decision Notice of Completion
EM-CING-051-220510 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 55 Walls Drive, Fairfield, Connecticut. Decision Notice of Completion
EM-CING-051-220527 - New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 100 Reef Road, Fairfield, Connecticut. Decision Notice of Completion
EM-T-MOBILE-051-220617 – T-Mobile notice of intent to modify an existing telecommunications facility located at 281 Wood House Road, Fairfield, Connecticut. Decision Notice of Completion
EM-CING-051-220622 – New Cingular Wireless PCS, (AT&T) notice of intent to modify an existing telecommunications facility located at 3965 Congress Street, Fairfield, Connecticut. Decision
EM-AT&T-051-220722 – AT&T notice of intent to modify an existing telecommunications facility located at 281 Wood House Road, Fairfield, Connecticut. Decision Notice of Construction Completion
EM-DISH-051-220824 – Dish Wireless, LLC notice of intent to modify an existing telecommunications facility located at 2189-2215 Black Rock Turnpike, Fairfield, Connecticut. Decision Notice of Completion
EM-VER-051-220908 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 281 Wood House Road, Fairfield, Connecticut. Decision Notice of Commencement of Construction Construction Commencement/Request for Extension and Council Extension Approval Notice of Construction Completion
EM-AT&T-051-221227 – AT&T notice of intent to modify an existing telecommunications facility located at 100 Reef Road, Fairfield, Connecticut. Incomplete Letter Decision-Denial
EM-AT&T-051-230303 – AT&T notice of intent to modify an existing telecommunications facility located at 100 Reef Road, Fairfield, Connecticut. Decision Notice of Construction Cancellation
TS-DISH-051A-230511 - Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 3965 Congress Street, Fairfield, Connecticut. Town Letter Decision Notice of Completion
TS-DISH-051B-230511 - Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 100 Reef Road, Fairfield, Connecticut. Town Letter Decision Notice of Commencement of Construction Extension Request and Council Extension Approval
EM-T-MOBILE-051-230719 – T-Mobile notice of intent to modify an existing telecommunications facility located at 280 Morehouse Drive, Fairfield, Connecticut. Decision Notice of Construction Completion
EM-ATT-051-230929 - AT&T notice of intent to modify an existing telecommunications facility located at 280 Morehouse Drive, Fairfield, Connecticut. Decision Notice of Construction Completion
EM-VER-051-231012 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 281 Wood House Road, Fairfield, Connecticut. Decision Notice of Commencement of Construction Notice of Construction Completion
EM-T-MOBILE-051-231023 - T-Mobile notice of intent to modify an existing telecommunications facility located at 640 Westport Turnpike, Fairfield, Connecticut. Decision Notice of Construction Completion
EM-UI-051-231120e - The United Illuminating Company notice of intent to modify an existing energy facility located at 180 Hawthorne Drive, Fairfield, Connecticut. Decision Request for Extension and Council Decision
EM-BLOOM-051-240416e - Bloom Energy Corporation notice of intent to modify an existing energy facility located at 541 Kings Highway Cutoff, Fairfield, Connecticut. Decision
EM-VER-051-240419 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 3965 Congress Street, Fairfield, Connecticut. Decision Notice of Construction Commencement Notice of Construction Completion