Due to the personally identifying information contained in written limited appearance statements from the public, any written limited appearance statements that are received by the Council for any matter are available to be viewed at the Council’s office Monday through Friday from 8:30 a.m. to 4:30 p.m. or available to be sent via e-mail upon request. Please allow adequate time for processing.

Long Island Sound Resource and Use Inventory/Long Island Sound Blue Plan Survey

Town of East Windsor


DOCKET NO. 492 – Gravel Pit Solar application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 120-megawatt-AC solar photovoltaic electric generating facility on eight parcels generally located to the east and west of the Amtrak and Connecticut Rail Line, south of Apothecaries Hall Road and north of the South Windsor town boundary in East Windsor, Connecticut and associated electrical interconnection(Findings of Fact) (Opinion) (Decision and Order)

DOCKET NO. 519 The Towers LLC Cellco Partnership d/b/a Verizon Wireless application for a  Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 11 Chamberlain Road, East Windsor, Connecticut. (Findings of Fact)(Opinion) (Decision and Order)

PETITION NO. 218 – The Connecticut Light and Power Company petition for modifications to the Barbour Hill-Enfield and Enfield-Windsor Locks 115-kV lines. Staff Report Approved 10/27/88

PETITION NO. 245 – The Connecticut Light and Power Company petition for modifications to its Barbour Hill Substation to Windsor Locks Junction, to Enfield Substation 115-kV transmission lines. Staff Report Approved 02/26/90

PETITION NO. 351 – The Connecticut Light and Power Company petition for proposed modifications to the Barbour Hill to Enfield 115-kV line, East Windsor. Staff Report Approved 05/09/96

PETITION NO. 751 – Manchester Methane, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction of a 3.2-megawatt methane renewable energy project at the NORCAP Landfill in East Windsor, Connecticut. Staff Report Approved 2/22/06 Staff Report for Modifications Modified 07/27/06

PETITION NO. 952 – The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 25.5 foot wall mounted steel pipe-mast and associated equipment radio communications equipment located at 112 Prospect Hill Road, East Windsor, Connecticut. Staff Report Approved 07/15/10

SUB-PETITION NO. 1293-ES-01 (East Windsor-South Windsor) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Construction Completion

SUB-PETITION NO. 1293-EEWSW-01 (Enfield, East Windsor, South Windsor) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Construction Completion

SUB-PETITION NO. 1293-SWEWES-01 (South Windsor, East Windsor, Ellington, Somers) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Decision Notice of Construction Completion

SUB-PETITION 1293-SEEW-01 (Somers, Ellington, East Windsor) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Construction Completion

SUB-PETITION NO. 1293-WLEW-01 (Windsor Locks, East Windsor) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements.  Decision Notice of Construction Completion

PETITION NO. 1294 LSE Canes Venatici LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of a 2.0-megawatt AC Solar Photovoltaic Electric Generating facility located at East Windsor Tax Assessor Map 037, Block 65, Lot 027A, Wapping Road, East Windsor, Connecticut. (NORCAP North). Approved 05/25/17   
 
PETITION NO. 1295 – LSE Coma Berenices LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, operation, and maintenance of a 2.0-megawatt AC Solar Photovoltaic Electric Generating facility located at East Windsor Tax Assessor Map 027, Block 65, Lot 031, 90 Wapping Road, East Windsor, Connecticut. (NORCAP South). Approved 05/25/17  
 
PETITION NO. 1414 –  The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement of an existing 25.5-foot wall-mounted steel pipe-mast with a new 34-foot wall-mounted galvanized steel pipe mast and associated radio communications equipment located at its East Windsor Area Work Center, 112 Prospect Hill Road, East Windsor, Connecticut. Approved 08/27/20   
 
PETITION NO. 1422 – Greenskies Clean Energy, LLC petition for a CF Mulnite LLC Declaratory Ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.99-megawatt AC solar photovoltaic electric generating facility to be located at Mulnite Farms, Inc. off Barber Hill Road west of the intersection with Rockville Road, East Windsor, Connecticut and associated electrical interconnection. (Findings of Fact) (Opinion) (Decision and OrderApproved 04/22/21    
 
PETITION NO. 1422A  CF Mulnite LLC Declaratory Ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the construction, maintenance and operation of a 4.99-megawatt AC solar photovoltaic electric generating facility to be located at Mulnite Farms, Inc. off Barber Hill Road west of the intersection with Rockville Road, East Windsor, Connecticut and associated electrical interconnection. Link to Petition No. 1422
 
PETITION NO. 1426 East Windsor Solar One, LLC petition for a DG Connecticut Solar III, LLC declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.9-megawatt AC solar photovoltaic electric generating facility located west of the Ellington town boundary at 341 East Road, East Windsor, Connecticut and associated electrical interconnection. (Findings of Fact) (Opinion) (Decision and Order) Approved 05/06/21  
 
PETITION NO. 1463 – CF Mulnite LLC CF Mulnite Miller LLC Greenskies Clean Energy, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.0-megawatt (MW) AC solar photovoltaic electric generating facility located at a Mulnite Farms, Inc. parcel off Wapping Road, and a 4.0 MW AC solar photovoltaic electric generating facility located at a Mulnite Farms, Inc. parcel off Miller Road, East Windsor, Connecticut, and associated electrical interconnection. Approved 01/13/22   
 
PETITION NO. 1463A – CF Mulnite, LLC Declaratory Ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the construction, maintenance and operation of a 1.0- megawatt (MW) AC solar photovoltaic electric generating facility located at a Mulnite Farms, Inc. parcel off Wapping Road, and a 4.0 MW AC solar photovoltaic electric generating facility located at a Mulnite Farms, Inc. parcel off Miller Road, East Windsor, Connecticut, and associated electrical interconnection. Link to Petition No. 1463
 
PETITION NO. 1531 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 1200/1300 Line Structure Replacement Project consisting of the replacement and reconductoring of approximately 0.39 mile of its existing No. 1200 and No. 1300 115-kilovolt electric transmission lines within existing Eversource electric transmission line right-of-way between Eversource's Windsor Locks Substation in Windsor Locks and Warehouse Point Junction in East Windsor, Connecticut and related transmission line and substation improvements. Approved 09/29/22  
 
PETITION NO. 1556 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Gravel Pit Solar Transmission Interconnection Project consisting of the electrical interconnection between its existing No. 1200 115-kilovolt (kV) transmission line facility and Gravel Pit Solar’s 120 megawatt solar photovoltaic electric generating facility located generally to the east and west of the Amtrak and Connecticut Rail Line, south of Apothecaries Hall Road and north of the South Windsor town boundary in East Windsor, Connecticut, and related electric transmission line and switchyard improvements. Approved 02/16/23  
 
PETITION NO. 1572 – East Windsor Solar Two, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.0-megawatt AC solar photovoltaic electric generating facility located at 31 Thrall Road, East Windsor, Connecticut, and associated electrical interconnection. (Findings of Fact) (Opinion) (Decision and Order) Approved 10/12/23   
 
BANM notice of intent to modify an existing telecommunications facility located at 250 South Main St., East Windsor.1995 Filing/Record
 
BANM notice of intent to modify an existing telecommunications facility located at 232 South Main Street in East Windsor. 1997 Filing/Record
 
Springwich Cellular Limited Partnership notice of intent to modify an existing telecommunications facility located at 232 South Main Street in East Windsor.  
 
EM-SPRINT-047-000306 – Sprint PCS notice of intent to modify an existing telecommunications facility located at 15 Chamberlin Road in (Broad Brook) East Windsor, Connecticut.  
 
EM-AT&T-047-020513 – AT&T Wireless notice of intent to modify an existing telecommunications facility located at 232 South Main Street, East Windsor, Connecticut.  
 
EM-CING-047-094-115-130-142-020828 – SNET Mobility, LLC notice of intent to modify existing telecommunications facilities located in East Windsor, Newington, Prospect, Southbury, and Tolland, Connecticut. (232 a/k/a 236 S. Main Street, East Windsor)  
 
EM-T-MOBILE-047-030612 Omnipoint Communications, Inc. notice of intent to modify an existing telecommunications facility located at 232 South Main Street, East Windsor, Connecticut.  
 
EM-VER-047-047A-129-164-050316 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify existing telecommunications facilities located at 15 Chamberlain Road, East Windsor (Broad Brook), 232 South Main Street, East Windsor; 599 Mantianuck Avenue, Windsor; and 126 Pioneer Heights Road, Somers, Connecticut.  
 
EM-NEXTEL-047-050825 – Nextel Communications, Inc. notice of intent to modify an existing telecommunications facility located at 232 South Main Street, East Windsor, Connecticut.  
 
EM-VER-057-093-043-159-047-060310 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify existing telecommunications facilities located at 1111 East Putnam Avenue, Greenwich; 153 Forbes Avenue, New Haven; 886 Main Street, East Hartford; 100 Great Meadow Road, Wethersfield; and 232 South Main Street, East Windsor, Connecticut.  
 
TS-CING-047-060405 – New Cingular Wireless PCS, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 50 Plantation Road, East Windsor, Connecticut.  
 
EM-CING-023-131-047-155-056-061130 – New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 14 Canton Spring Road, Canton; Shuttle Meadow Road, Southington; 232 South Main Street, East Windsor; 3114 Albany Avenue, West Hartford; and 15 North Granby Road, Granby, Connecticut.   
 
EM-CING-047-052-131-142-164-071004 New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 232 South Main Street, East Windsor; 319-321 New Britain Avenue, Farmington; 250 Meriden-Waterbury Turnpike, Southington; 5 Barbara Road, Tolland; and 750 Rainbow Road, Windsor, Connecticut.  
 
EM-POCKET-047-081006 – Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications notice of intent to modify an existing telecommunications facility located at 232 South Main Street, East Windsor, Connecticut. 
 
EM-POCKET-047-090414 – Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications notice of intent to modify an existing telecommunications facility located at 15 Chamberlain Road, East Windsor, Connecticut.  
 
EM-T-MOBILE-047-090429 Omnipoint Communications, as subsidiary of T-Mobile USA, Inc., notice of intent to modify an existing telecommunications facility located at 232 South Main Street, East Windsor, Connecticut.  Decision
 
EM-POCKET-047-090504 Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications notice of intent to modify an existing telecommunications facility located at 50 Plantation Road, East Windsor, Connecticut.  
 
EM-CLEARWIRE-164-100416 – Clearwire Corporation notice of intent to modify an existing telecommunications facility located at 160 Plantation Road, East Windsor, Connecticut.  
 
EM-VER-047-101216 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 232 South Main Street, East Windsor, Connecticut.  
 
EM-VER-047-110126 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 15 Chamberlain Road, East Windsor, Connecticut.  
 
EM-VER-047-110930 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 232 South Main Street, East Windsor, Connecticut.  Decision Notice of Construction Completion
 
EM-VER-047-111020 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at Chamberlain Road, East Windsor, Connecticut.  
 
EM-AT&T-047-120427 – AT&T Mobility notice of intent to modify an existing telecommunications facility located at 236 South Main Street, East Windsor, Connecticut.  
 
EM-METROPCS-047-121228-MA – MetroPCS Massachusetts, LLC notice of intent to modify an existing telecommunications facility located at 232 South Main Street, East Windsor, Connecticut.  
 
EM-SPRINT-047-130109 – Sprint Spectrum L.P. notice of intent to modify an existing telecommunications facility located at 160 Plantation Road, East Windsor, Connecticut.  
 
EM-SPRINT-047-130322 – Sprint Spectrum L.P. notice of intent to modify an existing telecommunications facility located at 15 Chamberlain Road, Broad Brook (East Windsor), Connecticut.  
 
EM-SPRINT-047-130405 Sprint Spectrum L.P. notice of intent to modify an existing telecommunications facility located at 236 South Main Street, East Windsor, Connecticut.  
 
EM-VER-047-130809 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 236 South Main Street, East Windsor, Connecticut. Notice of Construction Completion Decision
 
EM-SPRINT-047-131008 Sprint Spectrum L.P. notice of intent to modify an existing telecommunications facility located at 232 South Main Street, East Windsor, Connecticut.  Decision
 
EM-SPRINT-047-140530 – Sprint Spectrum L.P. notice of intent to modify an existing telecommunications facility located at 50 Plantation Road, East Windsor, Connecticut. Decision
 
EM-SPRINT-047-140613 Sprint Spectrum, L.P. notice of intent to modify an existing telecommunications facility located at 15 Chamberlain Road, East Windsor, Connecticut.   Decision Notice of Construction Completion
 
EM-METROPCS-047-140717 MetroPCS Massachusetts, LLC notice of intent to modify an existing telecommunications facility located at 50 Plantation Road, Broad Brook (East Windsor), Connecticut.  Decision Notice of Construction Completion
 
EM-METROPCS-047-140725 – MetroPCS Massachusetts LLC notice of intent to modify an existing telecommunications facility located at 15 Chamberlain Drive, Broad Brook (East Windsor), Connecticut. Decision Notice of Construction Completion
 
EM-SPRINT-047-140728 Sprint Spectrum, L.P. notice of intent to modify an existing telecommunications facility located at 232 South Main Street, East Windsor, Connecticut. Revised Filing Decision
 
EM-VER-047-160919 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 232 South Main Street, East Windsor, Connecticut. Decision Condition 1 Compliance Notice of Construction Completion
 
EM-AT&T-047-161003 AT&T notice of intent to modify an existing telecommunications facility located at 50 Plantation Road, East Windsor, Connecticut.  Decision Notice of Construction Completion
 
EM-AT&T-047-170130 – AT&T notice of intent to modify an existing telecommunications facility located at 104 Prospect Hill Road, East Windsor, Connecticut. Decision Notice of Construction Completion
 
EM-AT&T-047-170712 – AT&T notice of intent to modify an existing telecommunications facility located at 232 South Main Street, East Windsor, Connecticut. Decision
 
EM-SPRINT-047-170920 – Sprint notice of intent to modify an existing telecommunications facility located at 50 Plantation Road, East Windsor, Connecticut. Incomplete Extension Request and Council Decision Response to Incomplete Second Incomplete Second Extension Request for Incomplete and Council Decision Decision
 
EM-AT&T-047-180116 – AT&T notice of intent to modify an existing telecommunications facility located at 104 Prospect Hill Road, East Windsor, Connecticut. Incomplete Letter Decision - Denial
 
EM-SPRINT-047-180126 – Sprint notice of intent to modify an existing telecommunications facility located at 232 South Main Street, East Windsor, Connecticut.  Decision Notice of Construction Completion
 
EM-VER-047-180213 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 15 Chamberlain Road, East Windsor, Connecticut. Decision Extension Request and Council Decision Notice of Construction Completion
 
EM-SPRINT-047-180319 – Sprint notice of intent to modify an existing telecommunications facility located at 50 Plantation Road, East Windsor, Connecticut. Incomplete Letter Response to Incomplete Letter Council Receipt of Information Decision Notice of Construction Completion
 
EM-T-MOBILE-047-180817 – T-Mobile notice of intent to modify an existing telecommunications facility located at 232 South Main Street, East Windsor, Connecticut. Incomplete Letter Response to Incomplete-Amended Filing Response to Incomplete and Council Acknowledgement Decision Extension Request and Council Decision Notice of Construction Completion
 
EM-VER-047-190403 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 104 Prospect Hill Road, East Windsor, Connecticut. Incomplete Letter Extension Request and Council Decision Response to Incomplete and Council Acknowledgement Decision Second Extension Request and Council Decision Notice of Construction Completion
 
EM-AT&T-047-190522 – AT&T Mobility notice of intent to modify an existing telecommunications facility located at 104 Prospect Hill Road, East Windsor, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion
 
EM-CING-047-190726 – New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 41 Depot Street, East Windsor, Connecticut. Decision
 
TS-VER-047-200827 – Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 50 Plantation Road, East Windsor, Connecticut.  Town Letter Decision Extension Request and Council Decision Notice of Construction Completion
 
EM-VER-047-210419 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 232 South Main Street, East Windsor, Connecticut. Decision Extension Request and Council Decision Additional Extension Request and Council Decision Notice of Cancellation
 
EM-T-MOBILE-047-210430 – T-Mobile notice of intent to modify an existing telecommunications facility located at  232 South Main Street, East Windsor, Connecticut.  Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion Outstanding Condition Letter Outstanding Condition Submission
 
EM-VER-047-210817 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 50 Plantation Road, East Windsor, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Additional Clarification Response Decision Extension Request and Council Decision Notice of Construction Completion
 
EM-T-MOBILE-047-211006 – T-Mobile notice of intent to modify an existing telecommunications facility located at 50 Plantation Road, East Windsor, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Commencement Notice of Construction Completion
 
EM-VER-047-211021 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 104 Prospect Hill Road, East Windsor, Connecticut.  Decision Notice of Construction Completion
 
TS-DISH-047-211124 – Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 50 Plantation Road, East Windsor, Connecticut.  Town Letter Decision Amendment Request and Council Amendment Decision Notice of Construction Completion
 
EM-T-MOBILE-047-230417 – T-Mobile notice of intent to modify an existing telecommunications facility located at 50 Plantation Road, East Windsor, Connecticut.  Decision Notice of Construction Commencement   
 
EM-ATT-047-230621 – AT&T notice of intent to modify an existing telecommunications facility located at 50 Plantation Road, East Windsor, Connecticut.  Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion
 
EM-ATT-047-230809 – AT&T notice of intent to modify an existing telecommunications facility located at 104 Prospect Hill Road, East Windsor, Connecticut. Decision Extension Request and Council Decision Notice of Construction Completion
 
EM-VER-047-240628 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 104 Prospect Hill Road, East Windsor, Connecticut. Decision Notice of Construction Commencement Extension Request and Council Decision Notice of Construction Completion
 
EM-VER-047-240807 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 232 South Main Street, East Windsor, Connecticut. Decision Extension Request and Council Decision Notice of Construction Completion
 
EM-VER-047-250926 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 50 Plantation Road, East Windsor, Connecticut.  Decision