Due to the personally identifying information contained in written limited appearance statements from the public, any written limited appearance statements that are received by the Council for any matter are available to be viewed at the Council’s office Monday through Friday from 8:30 a.m. to 4:30 p.m. or available to be sent via e-mail upon request. Please allow adequate time for processing.

Long Island Sound Resource and Use Inventory/Long Island Sound Blue Plan Survey

Town of Durham

 

DOCKET NO. 9 – Northeast Utilities Chestnut Hill Junction to Black Pond Junction 3345 kV/115-kV lines. (Findings of Fact)

DOCKET NO. 161 – Metro Mobile CTS of Hartford, Inc. Certificate for the construction, maintenance, and operation of a cellular telephone antenna tower off Old Blue Hills Road, Durham; with alternate sites located at 199R Cherry Lane and 100 New Haven Road, Durham. (Findings of Fact) (Opinion) and (Decision and Order)

DOCKET NO. 237 – Tower Ventures II, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a wireless telecommunications facility on one of two sites at 853R New Haven Road, Durham, Connecticut. (Findings of Fact) (Opinion) and (Decision and Order)

DOCKET NO. 254 – Sprint Spectrum, L.P. d/b/a Sprint PCS application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a wireless telecommunications facility at 134R Creamery Road, Durham, Connecticut. (Findings of Fact) (Opinion) and (Decision and Order)

DOCKET NO. 272 – The Connecticut Light and Power Company and The United Illuminating Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV electric transmission line and associated facilities between the Scovill Rock Switching Station in Middletown and the Norwalk Substation in Norwalk, Connecticut. This includes construction of the Beseck Switching Station in Wallingford, East Devon Substation in Milford, and Singer Substation in Bridgeport and modifications to the Scovill Rock Switching Station and the Norwalk Substation and certain interconnections. (Durham)  (Findings of Fact) (Appendix A) (Appendix B) (Appendix C) (Opinion) (Decision and Order) (Record)

DOCKET NO. 505 – Haddam Quarter Solar, LLC application for a Kearsarge Haddam Quarter, LLC Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a 2.8-megawatt-AC solar photovoltaic electric generating facility located south of Haddam Quarter Road and north of Johnson Lane, Durham, Connecticut and associated electrical interconnection. (Findings of Fact) (Opinion) and (Decision and Order)

PETITION NO. 697 Nextel Communications of the Mid-Atlantic, Inc. d/b/a Nextel Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing monopole located at 143 Old Blue Hills Road, Durham, Connecticut. Staff Report Approved 05/11/05

PETITION NO. 1092 Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications facility located at 134R Creamery Road, Durham, Connecticut. Staff Report Approved 03/06/14

PETITION NO. 1117 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction, maintenance, and operation of a small cell telecommunications facility on the approximately 30 acre Durham Fairgrounds parcel located at 24 Townhouse Road, Durham, Connecticut.  Filing Staff Report Notice of Construction Completion Approved 10/16/14

PETITION NO. 1227  Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of electric transmission line structures within approximately .8 miles of existing right of way along its existing No. 1975 115-kV transmission line traversing the municipalities of Middlefield, Durham and Middletown, Connecticut, and related transmission line structure improvements.  Approved 05/26/16

PETITION NO. 1341  The Durham Manufacturing Company petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.215-megawatt AC solar photovoltaic electric generating facility located at the Durham Manufacturing Company, 201 Main Street, Durham, Connecticut.  Approved 06/7/18

PETITION NO. 1494 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small wireless facility on a new 38.5-foot wood pole and associated equipment at Durham Fairgrounds, 24 Townhouse Road, Durham, Connecticut.  Approved 04/21/22

PETITION NO. 1539 – New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of three small wireless facilities on new wood poles that are less than 50 feet in height and associated equipment at Durham Fairgrounds, 24 Townhouse Road, Durham, Connecticut. Approved 12/08/22

PETITION NO. 1608  Greenskies Clean Energy, LLC CF Durham Middlefield, LLC Declaratory Ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the construction, maintenance and operation of a 3.035-megawatt AC solar photovoltaic electric generating facility located at 141 Middlefield Road, Durham, Connecticut, and associated electrical interconnection. Approved 05/23/24

Bell Atlantic NYNEX Mobile notice of intent to modify an existing telecommunications facility located off Old Blue Hills Road in Durham. November 22, 1995 Antenna Upgrade Filing

TS-CROWN-038-990526  Crown Communications request for an order to approve tower sharing at an existing telecommunications facility located on Old Blue Hills Road in Durham.

EM-AT&T-038-020626  AT&T Wireless notice of intent to modify an existing telecommunications facility located at 143-R Old Blue Hills Road, Durham, Connecticut. 

EM-VER-027-038-076-083-050318 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify existing telecommunications facilities located at 48 Cow Hill Road, Clinton; 101 R. Old Blue Hills Road, Durham; 864 Opening Hill Road, Madison; and Court Street, Middletown, Connecticut.

EM-CING-038-050817  New Cingular Wireless PCS, LLC notice of intent to install a temporary cellular telephone facility for use at the Durham Agricultural Fair, Town House Road, Durham, Connecticut.

EM-CING-038-060804 – New Cingular Wireless PCS, LLC notice of intent to install a temporary cellular telecommunications facility at the Durham Agricultural Fair, Town House Road, Durham, Connecticut. 

EM-CING-038-070808 – New Cingular Wireless PCS, LLC notice of intent to install a temporary cellular telecommunications facility at the Durham Agricultural Fair, Town House Road, Durham, Connecticut.    
 
EM-CING-038-080520 – New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 143R Old Blue Hills Road, Durham, Connecticut.   
 
EM-VER-038-080522 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at Old Blue Hills Road, Durham, Connecticut.   
 
EM-CING-038-080805 New Cingular Wireless PCS, LLC notice of intent to install a temporary cellular telecommunications facility at the Durham Agricultural Fair, Town House Road, Durham, Connecticut.   
 
EM-CING-038-081103 New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 143R Old Blue Hills Road, Durham, Connecticut.   
 
EM-CING-038-090811  New Cingular Wireless PCS, LLC notice of intent to install a temporary cellular telecommunications facility at the Durham Agricultural Fair, Town House Road, Durham, Connecticut.   
 
EM-CING-038-100730 New Cingular Wireless PCS, LLC notice of intent to install a temporary cellular telecommunications facility at the Durham Agricultural Fair, Durham, Connecticut.   
 
EM-CING-038-110628 New Cingular Wireless PCS, LLC notice of intent to install a temporary cellular telecommunications facility at the Durham Agricultural Fair, Durham, Connecticut.   
 
EM-VER-038-111108  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at Old Blue Hills Road, Durham, Connecticut.

EM-CING-038-120501 New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 101R (aka 143) Old Blue Hills Road, Durham, Connecticut.

EM-CING-038-120816 New Cingular Wireless PCS, LLC notice of intent to install a temporary cellular telecommunications facility at the 2012 Durham Agricultural Fair, Durham, Connecticut.

EM-SPRINT-038-120924  Sprint Spectrum L.P. notice of intent to modify an existing telecommunications facility located at 143R Old Blue Hills Road, Durham, Connecticut.  Decision  

EM-CING-038-130801 New Cingular Wireless PCS, LLC notice of intent to install a temporary cellular telecommunications facility located at the 2013 Durham Agricultural Fair, Durham, Connecticut. Notice of Construction Completion

EM-CING-038-140703 New Cingular Wireless PCS, LLC notice of intent to install a temporary cellular telecommunications facility located at the 2014 Durham Agricultural Fair, Durham, Connecticut. Decision

EM-CING-038-140902  New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 143R Old Blue Hills Road, Durham, Connecticut. Decision Extension Request and Council Decision

EM-VER-038-141008 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 101R Old Blue Hills Road, Durham, Connecticut. Decision Notice of Construction Completion

EM-CING-038-150706 New Cingular Wireless PCS, LLC notice of intent to install a temporary cellular telecommunications facility located at the 2015 Durham Agricultural Fair, Durham, Connecticut. Decision

EM-CING-038-160725 New Cingular Wireless PCS, LLC notice of intent to install a temporary cellular telecommunications facility located at the 2016 Durham Agricultural Fair, 24 Town House Road, Durham, Connecticut. Decision
 
EM-T-MOBILE-038-160818  T-Mobile Northeast LLC notice of intent to install a temporary cellular telecommunications facility located at the 2016 Durham Agricultural Fair, Durham, Connecticut.  Decision
 
EM-VER-038-161018 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 134R Creamery Road, Durham, Connecticut.  Decision Notice of Construction Completion
 
EM-VER-038-161114  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 143R Old Blue Hills Road, Durham, Connecticut. Decision  Notice of Construction Completion
 
EM-AT&T-038-170124 – AT&T notice of intent to modify an existing telecommunications facility located at 143R Blue Hills Road, Durham, Connecticut. Decision  Notice of Construction Completion
 
EM-CING-038-170417 – New Cingular Wireless PCS, LLC notice of intent modify an existing telecommunications facility located at 143R Old Blue Hills Road, Durham, Connecticut. Town Comments  Revised Structural Analysis Report  Revised CD  Decision  Notice of Construction Completion
 
EM-CING-038-170620 (cow)  New Cingular Wireless PCS, LLC notice of intent to install a temporary telecommunications facility located at the 2017 Durham Agricultural Fair, Durham, Connecticut. Decision
 
EM-T-MOBILE-038-170727 (cow) – T-Mobile notice of intent to install a temporary telecommunications facility located at the 2017 Durham Agricultural Fair, 24 Town House Road, Durham, Connecticut. Decision  Notice of Construction Completion
 
EM-VER-038-170727 – Cellco Partnership d/b/a Verizon notice of intent to modify an existing telecommunications facility located at 24 Town House Road, Durham, Connecticut. Decision  Notice of Construction Completion
 
EM-SPRINT-038-171220 – Sprint notice of intent to modify an existing telecommunications facility located at 134 R Creamery Road, Durham, Connecticut. Decision  Notice of Construction Completion
 
EM-CING-038-180326  New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 143R Old Blue Hills Road, Durham, Connecticut. Decision  Notice of Construction Completion
 
TS-T-MOBILE-038-180405  T-Mobile Northeast LLC request for an order to approve tower sharing at an existing telecommunications facility located at 143 R Old Blue Hills Road, Durham, Connecticut.  Correspondence from First Selectman L. Francis  Additional Correspondence from First Selectman L. Francis  Decision  Notice of Construction Completion
 
EM-AT&T-038-180716 – AT&T notice of intent to install a temporary telecommunications facility located at the 2018 Durham Agricultural Fair, Durham, Connecticut. Decision
 
EM-VER-038-180806 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 24 Town House Road, Durham, Connecticut.  Decision  Notice of Construction Completion
 
EM-VER-038-180816(cow)  Cellco Partnership d/b/a Verizon Wireless notice of intent to install a temporary telecommunications facility located at the 2018 Durham Agricultural Fair, 24 Town House Road, Durham, Connecticut. Decision
 
EM-SPRINT-038-180924  Sprint notice of intent to modify an existing telecommunications facility located at 143 R Old Blue Hill Road, Durham, Connecticut. Incomplete Letter  Response to Incomplete and Council Acknowledgement  Decision Notice of Construction Completion
 
EM-VER-038-181210  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 143 R Old Blue Hill Road, Durham, Connecticut. Decision Notice of Construction Completion
 
EM-AT&T-038-190529 – AT&T notice of intent to modify an existing telecommunications facility located at 143 R Old Blue Hills Road, Durham, Connecticut. Decision Construction Completion Condition Submission
 
EM-VER-038-190712 (cow) – Cellco Partnership d/b/a Verizon Wireless notice of intent to install a temporary telecommunications facility located at the 2019 Durham Agricultural Fair, 24 Town House Road, Durham, Connecticut. Decision
 
EM-CING-038-190722(temp) – New Cingular Wireless PCS, LLC (AT&T) notice of intent to install a temporary telecommunications facility located at the 2019 Durham Agricultural Fair, 24 Town House Road, Durham, Connecticut. Decision
 
EM-CING-038-200319  New Cingular Wireless PCS, LLC (AT&T) notice of intent modify an existing telecommunications facility located at 143 R Old Blue Hills Road, Durham, Connecticut. Decision Notice of Construction Completion
 
EM-T-MOBILE-038-200819  T-Mobile notice of intent to modify an existing telecommunications facility located at 143 R Old Blue Hill Road, Durham, Connecticut. Decision  Notice of Construction Completion
 
EM-AT&T-038-200911  AT&T notice of intent to modify an existing telecommunications facility located at 143 R Old Blue Hill Road, Durham, Connecticut. Decision  Notice of Construction Completion
 
EM-T-MOBILE-038-210304  T-Mobile notice of intent to modify an existing telecommunications facility located at 134R (a/k/a 128R) Creamery Road, Durham, Connecticut. Decision  Notice of Construction Completion
 
EM-VER-038-210701 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 134R Creamery Road, Durham, Connecticut. Decision  Notice of Commencement  Notice of Construction Completion
 
EM-CING-038-210716(temp)  New Cingular Wireless PCS, LLC (AT&T) notice of intent to install a temporary telecommunications facility located at the Durham Fairgrounds, Durham, Connecticut. 2021 Durham Agricultural Fair. Decision
 
EM-VER-038-210720Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 143R Old Blue Hills Road, Durham, Connecticut.  Incomplete Letter Response to Incomplete and Second Incomplete Letter Response to Second Incomplete and Council Acknowledgement Decision Notice of Construction Completion
 
TS-DISH-038-210802 DISH Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 134R (a/k/a 128R) Creamery Road, Durham, Connecticut.  Town Letter DecisionNotice of Construction Completion
 
TS-DISH-038-211202  Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 143R Old Blue Hills Road, Durham, Connecticut.  Town Letter Incomplete Letter Extension Request and Council Decision  Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion
 
EM-CING-038-220815(temp)  New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at the Durham Fairgrounds, Durham, Connecticut. 2022 Durham Agricultural Fair. Decision
 
EM-ATT-038-230620(temp) – AT&T notice of intent to install a temporary telecommunications facility located at the Durham Fairgrounds, Durham, Connecticut. 2023 Durham Agricultural Fair.  Decision
 
EM-VER-038-230803 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 134R Creamery Road, Durham, Connecticut. Original Tower Approval Decision Notice of Construction Commencement Notice of Construction Completion
 
EM-VER-038-240320  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 134R Old Blue Hills Road, Durham, Connecticut.  Decision Notice of Construction Commencement Notice of Construction Completion
 
EM-ATT-038-240606 (temp) – AT&T notice of intent to install a temporary telecommunications facility located at the Durham Fairgrounds, Durham, Connecticut. 2024 Durham Agricultural Fair.  Decision
 
EM-ATT-038-250313  AT&T notice of intent to modify an existing telecommunications facility located at 143R Old Blue Hills Road, Durham, Connecticut.  Decision