BRISTOL
DOCKET NO. 52 - Ogden Martin Systems, Inc. Certificate for the Bristol Resource Recovery Project for the construction of an electric generating facility. (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 250 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a wireless telecommunications facility at 371 Teryville Avenue or 522 Terryville Avenue, Bristol, Connecticut. (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 318 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a telecommunications facility at 1191 Terryville Avenue in Bristol, Connecticut. (Record), (Findings of Fact), (Opinion), and (Decision and Order).
PETITION NO. 14 - Northeast Utilities Service Company petition for the replacement of double circuit wood pole structures with double circuit steel monopole structures and the reconductoring of two 115-kV circuits extending approximately 6.16 miles from Southington Substation, Southington to Forestville Substation, Bristol, and about 0.8 miles from Forestville Junction, Southington to Bristol Substation. Staff Report. Approved 2/23/73
PETITION NO. 79 - Southern New England Telephone Company petition for placement of microwave antennas on the roofs of existing buildings in Bristol, Torrington, and Harwinton. Staff Report. Decision Letter. Approved 3/1/82
PETITION NO. 120HW - CECOS Treatment Corporation petition for the proposed storage of containerized waste on Broderick Road. (Bristol) Approved 12/7/84
PETITION NO. 143HW - CECOS Treatment Corporation petition for changes to its Connecticut Discharge Permit by lowering waste concentrations. (Bristol) Partial Approval 11/26/85
PETITION NO. 144HW - CECOS Treatment Corporation petition for replacement of tanks, processes and equipment and addition of storage capacity. (Bristol) Partial Approval 11/26/85
PETITION NO. 164 - Northeast Utilities Service Company petition addition of a 47-MVA, 110-13.8-kV transformer, a 115-kV circuit breaker, and a replacement of an existing 5.4 MVAR capacitor bank within the Forestville 12A Substation in Bristol. Staff Report. Approved 10/6/86
PETITION NO. 165 - Northeast Utilities Service Company petition for the proposed removal of a 69-kV tower line from New Britain to Bristol. Staff Report. Approved 11/10/86
PETITION NO. 287HW - Connecticut Treatment Corporation petition for proposed improvements at an existing hazardous waste facility located on Broderick Road in Bristol. Staff Report. Approved 9/16/92
PETITION NO. 314 - Springwich cellular Limited Partnership petition for installation of a new monopole and cellular antennas at an existing tower site off Willis Street in Bristol. Staff Report. Approved 12/15/93
PETITION NO. 449 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power telecommunications facility located west of Willis Street on South Mountain in Bristol, Connecticut. Findings of Fact. Opinion. Decision & Order. Denied 6/7/00.
PETITION NO. 510 - VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed antenna installation of an existing Connecticut Light and Power Company communications tower located off Willis Street, Bristol, Connecticut. Staff Report. Approved 5/25/01.
PETITION NO. 800 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement of an existing telecommunications facility located at Willis Street, Bristol, Connecticut. Decision Letter and Staff Report. Approved 1/18/07.
PETITION NO. 959 - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing CL&P substation in the Forestville section located at 158 Cronin Street, Bristol, Connecticut. Staff Report. Approved 08/26/10.
PETITION NO. 1041HW – Clean Harbors of Connecticut, Inc. petition for a declaratory ruling that no Certificate of Public Safety and Necessity is required for the ten-day hazardous waste transfer facility operations consistent with its renewal of the RCRA Part B permit located at 51 Broderick Road, Bristol, Connecticut. Staff Report. Approved 11/29/12.
PETITION NO. 1143 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of the existing Harvest Bakery building located at 84 Farmington Avenue, Bristol, Connecticut. Decision Letter and Staff Report. Completion Letter. Approved 04/02/15.
PETITION NO. 1201 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed reconductoring of approximately 1.75 miles of its existing No. 1810 115-kV transmission line from Forestville Junction in Southington to Lake Avenue Junction in Bristol, rebuilding and reconductoring of approximately 1.85 miles of its existing Nos. 1800 and 1810 115-kV transmission lines from Southington Substation in Southington to Structure No. 1815 in Southington, reinforcement of an existing transmission structure at Southington Substation in Southington, and related substation and transmission line structure improvements. Set One Interrogatories.Field Review Notice. Response to Interrogatories Set One. Date for Decision. Staff Report and Decision Letter Correspondence Regarding Weathering Steel Consideration Request. Minor Change Request. Approved 01/21/16.
PETITION NO. 1205 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at the Bristol Shopping Center, 597 Farmington Avenue, Bristol, Connecticut. Withdrawn.
SUB-PETITION NO. 1293-BR-01 (Bristol) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Completion Letter
SUB-PETITION NO. 1293-TPB-01 (Thomaston-Plymouth-Bristol) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Completion
SUB-PETITION NO. 1293-BS-01 (Bristol-Southington) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Decision Second Extension Request and Council Decision Request for Amendment Council Decision on Amendment Request Request for Amendment and Council Decision Third Extension Request and Council Decision Notice of Construction Completion
PETITION NO. 1306 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 597 Farmington Avenue in Bristol, Connecticut. Approved 07/20/17.
SUBPETITION NO. 1133-CING-20230607 - New Cingular Wireless PCS, LLC eligible facility request for modification to an existing telecommunications facility located at 985 Farmington Avenue, Bristol, Connecticut. Decision Notice of Construction Commencement Extension Request and Council Extension Approval
SUBPETITION NO. 1133-VER-20240124 – Cellco Partnership d/b/a Verizon Wireless eligible facility request for modifications to an existing telecommunications facility located at 1191 Terryville Avenue, Bristol, Connecticut. Decision Notice of Construction Commencement
PETITION NO. 1369 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 440-kilowatt fuel cell facility and associated equipment to be located at the City of Bristol Water Pollution Control Facility, 75 Battisto Road, Bristol, Connecticut. Approved 06/06/19
PETITION NO. 1421 - DG Connecticut Solar III, LLC Bristol Solar One, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 3.25 megawatt AC solar photovoltaic generating facility located at 399 Hill Street, Bristol, Connecticut, and associated electrical interconnection. Approved 11/05/20
PETITION NO. 1427 – TRITEC Americas, LLC SunJet Energy, LLC notice of election to waive exclusion from Connecticut Siting Council jurisdiction, pursuant to Connecticut General Statutes §16-50k(e), and petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.0-megawatt or less AC solar photovoltaic electric generating facility and associated electrical interconnection located at 0 Matthews Street and 125 Hill Street, Bristol, Connecticut. Approved 01/14/21
PETITION NO. 1489– Palm Energy, LLC NRG Curtailment Solutions, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176, §16-50i and §16-50k, that the installation of four 2.46-megawatt natural gas-fired emergency generating devices and associated equipment inside two existing buildings located on the ESPN Campus at 935 Middle Street, Bristol, Connecticut are exempt from Connecticut Siting Council jurisdiction and would not have a substantial adverse environmental effect. Approved 04/22/22
PETITION NO. 1540 - ReNew Developers, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 4.0-megawatt fuel cell facility and associated equipment to be located at 234 Riverside Avenue, Bristol, Connecticut. Approved 12/08/22
PETITION NO. 1548 - Bloom Energy Corporation ESA Project Company, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 600-kilowatt fuel cell facility and associated equipment to be located at Bristol Hospital, 41 Brewster Road, Bristol, Connecticut. Approved 01/19/23
BANM notice of intent to modify an existing telecommunications facility owned by Carpenter Realty located on top of an existing building at 32 Valley St., Bristol.
EM-SNET-017930617 - Springwich Cellular Ltd. Partnership notice of intent to modify an existing telecommunications facility owned by SNET located off Willis St. (South Mountain), Bristol. Decision
TS-AT&T-017-010927 - AT&T Wireless PCS LLC request for an order to approve tower sharing at an existing telecommunications facility located at 1214 Farmington Avenue, Bristol, Connecticut.
EM-SPECTRA-017-011005 - Spectrasite Communications, Inc. notice of intent to modify an existing telecommunications facility located at Willis Street, Bristol, Connecticut.
EM-CING-007-017-052-148-020730 - SNET Mobility, LLC notice of intent to modify existing telecommunications facilities located in Berlin, Bristol, Farmington, and Wallingford, Connecticut.
EM-T-MOBILE-"UNIVERSAL"-020830 - Omnipoint Facilities Network 2., L.L.C. and Omnipoint Communications, Inc., subsidiaries of T-Mobile USA, Inc. notice of intent to modify existing telecommunications facilities throughout Connecticut.
EM-T-MOBILE-017-100326 – T-Mobile USA, Inc. notice of intent to modify an existing telecommunications facility located at 790 Willis Street, Bristol, Connecticut.
TS-METROPCS-017-110815MA - MetroPCS Massachusetts, LLC d/b/a MetroPCS request for an order to approve tower sharing at an existing telecommunications facility located at 985 Farmington Avenue, Bristol, Connecticut. Decision
EM-T-MOBILE-017-151005 - T-Mobile notice of intent to modify an existing telecommunications facility located at 790 Willis Street, Bristol, Connecticut. Decision Completion Letter
EM-VER-017-160108 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 371 Terryville Avenue, Bristol, Connecticut. Decision Extension Request and CSC Decision Completion Letter and Compliance with Condition 1
EM-T-MOBILE-017-160720- T-Mobile notice of intent to modify an existing telecommunications facility located at 790 Willis Street, Bristol, Connecticut. Decision. Completion Letter
EM-AT&T-017-170317 - AT&T notice of intent to modify an existing telecommunications facility located at 790 Willis Street, Bristol, Connecticut. Incomplete Response to Incomplete Decision Letter Extension Request and CSC Decision Completion Letter
TS-CING-017-170613 - AT&T Wireless PCS LLC request for an order to approve tower sharing at an existing telecommunications facility located at 383 Middle Street, Bristol, Connecticut. Incomplete Extension Request and CSC Approval Response to Incomplete Decision Completion
EM-VER-017-170830 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 32 Valley Street, Bristol, Connecticut. Decision Extension Request and CSC Approval Completion Letter
EM-SPRINT-017-171129 – Sprint notice of intent to modify an existing telecommunications facility located at 371 Terryville Avenue, Bristol, Connecticut. Decision Completion Letter
EM-AT&T-017-180322 - AT&T Mobility, LLC notice of intent to modify an existing telecommunications facility located at 790 Willis Street, Bristol, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Completion Letter
EM-AT&T-017-180628 – AT&T notice of intent to modify an existing telecommunications facility located at 371 Terryville Avenue, Bristol, Connecticut. Decision Completion Status Sheet
EM-SPRINT-017-180712 - Sprint notice of intent to modify an existing telecommunications facility located at 1214 Farmington Avenue, Bristol, Connecticut. Decision Completion Letter
TS-T-MOBILE-017-181015 – T-Mobile request for an order to approve tower sharing at an existing telecommunications facility located at 1214 Farmington Avenue, Bristol, Connecticut. Decision Request for Extension and Council Approval Notice of Completion
EM-VER-017-181116 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 371 Terryville Avenue, Bristol, Connecticut. Decision Completion Letter
EM-AT&T-017-190423 - AT&T notice of intent to modify an existing telecommunications facility located at 371 Terryville Avenue, Bristol, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Construction Complete Condition Submission
EM-T-MOBILE-017-190705 (temp) - T-Mobile notice of intent to install a temporary telecommunications facility located at the Little League Playoffs, 345 Mix Street, Bristol, Connecticut. Decision
EM-SPRINT-017-190709 - Sprint Spectrum, LP notice of intent to modify an existing telecommunications facility located at 790 Willis Street, Bristol, Connecticut. Decision - Denial
EM-SPRINT-017-190801 – Sprint Spectrum, LP notice of intent to modify an existing telecommunications facility located at 790 Willis Street, Bristol, Connecticut. Incomplete Letter Extension for Incomplete Response Second Extension for Incomplete Response Decision - Denial
EM-CING-017-191216 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 383 Middle Street, Bristol, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Completion
EM-VER-017-191219 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 225 North Main Street, Bristol, Connecticut. Incomplete Letter Response To Incomplete and Council Acknowledgement Decision Extension Request and Council Approval Notice of Completion
EM-SPRINT-017-191231 – Sprint notice of intent to modify an existing telecommunications facility located at 790 Willis Street, Bristol, Connecticut. Decision Notice of Cancellation
EM-AT&T-017-200128 – AT&T Mobility, LLC notice of intent to modify an existing telecommunications facility located at 790 Willis Street, Bristol, Connecticut. Decision Notice of Completion
EM-EVER-017-200423 - The Connecticut Light and Power Company d/b/a Eversource Energy notice of intent to modify an existing telecommunications facility located at 790 Willis Street, Bristol, Connecticut.
Decision Extension Request and Council Decision 2nd Extension Request and Council Decision Notice of Completion
EM-AT&T-017-200512- AT&T notice of intent to modify an existing telecommunications facility located at 371 Terryville Avenue, Bristol, Connecticut. Decision Notice of Completion
EM-T-MOBILE-017-210414 – T-Mobile notice of intent to modify an existing telecommunications facility located at 1214 Farmington Avenue, Bristol, Connecticut. Decision Notice of Completion
EM-T-MOBILE-017-210526 – T-Mobile notice of intent to modify an existing telecommunications facility located at 790 Willis Street, Bristol, Connecticut. Decision Notice of Completion
TS-DISH-017-211013 - Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 371 Terryville Avenue, Bristol, Connecticut. Town Letter Decision Notice of Completion
EM-VER-017-211018 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 225 North Main Street (a/k/a 32 Valley Street), Bristol, Connecticut. Decision Notice of Completion
EM-T-MOBILE-017-211116 - T-Mobile notice of intent to modify an existing telecommunications facility located at 371 Terryville Avenue, Bristol, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Cancellation
TS-DISH-017-211228 - Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 1214 Farmington Avenue, Bristol, Connecticut. Town Letter Decision Notice of Completion
EM-VER-017-220217 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 371 Terryville Avenue, Bristol, Connecticut. Decision Notice of Completion
EM-EVER-017-220303 - The Connecticut Light and Power Company d/b/a Eversource Energy notice of intent to modify an existing telecommunications facility located at 790 Willis Street, Bristol, Connecticut. Decision Notice of Completion
EM-CING-017-220708 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 383 Middle Street, Bristol, Connecticut. Decision Notice of Construction Completion
EM-AT&T-017-220725 - AT&T notice of intent to modify an existing telecommunications facility located at 790 Willis Street, Bristol, Connecticut. Decision Notice of Completion
EM-AT&T-017-220809 - AT&T notice of intent to modify an existing telecommunications facility located at 371 Terryville Avenue, Bristol, Connecticut. Filing-Part 2 Filing-Part 3 Decision Extension Request and Council Extension Approval Notice of Construction Completion
EM-T-MOBILE-017-220822 – T-Mobile notice of intent to modify an existing telecommunications facility located at 371 Terryville Avenue, Bristol, Connecticut. Decision Notice of Completion
EM-EVER-017-231017 - The Connecticut Light and Power Company d/b/a Eversource Energy notice of intent to modify an existing telecommunications facility located at 790 Willis Street, Bristol, Connecticut. Decision Notice of Construction Commencement Notice of Completion
TS-VER-017-240221 - Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 790 Willis Street, Bristol, Connecticut. Part 2 of Filing Town Letter Decision Notice of Construction Commencement
EM-VER-017-240321 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 371 Terryville Avenue, Bristol, Connecticut. Decision Notice of Construction Commencement Notice of Construction Completion
EM-VER-017-240620 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 225 North Main Street (a/k/a 32 Valley Street), Bristol, Connecticut. Decision Notice of Construction Commencement
EM-ATT-017-240822 - New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 790 Willis Street, Bristol, Connecticut. Decision