Town of Bloomfield
DOCKET NO. 11 – Manchester - North Bloomfield 345-kV line and reconstruction of two 115-kV transmission lines in the vicinity of the Manchester Industrial Park between Meekville Junction - Burnham Road and Pleasant Valley. (Findings of Fact) (Opinion) (Concurring Opinion) (Dissenting Opinion 1) (Dissenting Opinion 2) and (Decision and Order)
DOCKET NO. 24 – Department of Environmental Protection Certificate for the construction of a microwave telecommunications facility on Talcott Mountain Road, Bloomfield. (Findings of Fact) (Opinion) and (Decision and Order)
DOCKET NO. 58 – Metro Mobile CTS of Hartford, Inc. Certificate for the construction, maintenance, and operation of facilities to provide cellular telephone service on Talcott Mountain in Bloomfield (DENIED), and in Glastonbury, Haddam, Middlefield, Portland, Rocky Hill, Somers, Willington, Vernon, Windsor, and Hartford. (Findings of Fact) (Opinion) and (Decision and Order)
DOCKET NO. 97 – The Connecticut Light and Power Company Certificate for the reconstruction of a 115-kV electric transmission line in Farmington and Bloomfield. (Findings of Fact) (Opinion) (Dissenting Opinion) and (Decision and Order)
DOCKET NO. 107 – Metro Mobile CTS of Hartford, Inc. Certificate for cellular telephone antennas and associated equipment in Bloomfield. (Findings of Fact) (Opinion) and (Decision and Order)
DOCKET NO. 158 – Springwich Cellular Limited Partnership Certificate for a cellular telecommunications tower and associated equipment approximately 0.3 miles west of Hoskins Road, Bloomfield. (Findings of Fact) (Opinion) and (Decision and Order)
DOCKET NO. 336 – Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a telecommunications facility located at 811 Blue Hills Avenue, Bloomfield, Connecticut. (Record) (Findings of Fact)(Opinion) (Decision and Order)
DOCKET NO. 370 – Consolidated proceeding pursuant to the Connecticut Energy Advisory Board (CEAB) Request for Proposal (RFP) process under C.G.S. §16a-7c. Original application: The Connecticut Light & Power Company application for Certificates of Environmental Compatibility and Public Need for the Connecticut Valley Electric Transmission Reliability Projects which consist of (1) The Connecticut portion of the Greater Springfield Reliability Project that traverses the municipalities of Bloomfield, East Granby, and Suffield, or potentially including an alternate portion that traverses the municipalities of Suffield and Enfield, terminating at the North Bloomfield Substation; and (2) the Manchester Substation to Meekville Junction Circuit Separation Project in Manchester, Connecticut. Competing application: NRG Energy, Inc. application pursuant to C.G.S. §16-50l(a)(3) for consideration of a 530 MW combined cycle generating plant in Meriden, Connecticut. (Record) (Findings of Fact GSRP/MMP/NRG)( Opinion GSRP) (Correction to GSRP Opinion) (Decision and Order GSRP) (Opinion MMP) (Decision and Order MMP) (Record 370b) (Opinion NRG) and (Decision and Order NRG)
DOCKET NO. 379 – SBA Tower II, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a telecommunications facility at 12 Burr Road, Bloomfield, Connecticut. (Record) (Findings of Fact) (Opinion) (Decision and Order)
DOCKET NO. 416 – American Towers, LLC Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a telecommunications facility located off Day Hill Road, Bloomfield, Connecticut. (Record) (Findings of Fact) (Opinion) (Decision and Order)
PETITION NO. 19 – Northeast Utilities Service Company petition for replacing existing steel lattice structures with steel monopole structures and reconductoring two existing 115-kV circuits extending about 5.3 miles from North Bloomfield Substation, Duncaster Road, to Bloomfield Tap Point near Blue Hills Avenue. Approved 09/14/73
PETITION NO. 39 – Hartford Electric Light Company petition to construct a 115-kV line from Canton Substation in Canton to North Bloomfield Substation in Bloomfield crossing facilities of the Southern New England Telephone in Canton, Simsbury, and Bloomfield. Staff Report Approved 12/13/77
PETITION NO. 172 – Connecticut Natural Gas Corporation petition for the construction and operation of temporary towers and associated equipment in New Britain, Bloomfield, Glastonbury, and Rocky Hill. Staff Report Denied 01/28/87
PETITION NO. 177 – Northeast Utilities petition for proposed addition of equipment to the existing Bloomfield 3B Substation. Staff Report Approved 03/11/87
PETITION NO. 224 – The Connecticut Light and Power Company petition for the proposed addition of 115-kV capacitors and associated equipment within North Bloomfield Substation. Staff Report Approved 12/29/88
PETITION NO. 244 – Connecticut Natural Gas Corporation petition for a proposal to install, own, and operate a natural gas line in Bloomfield, West Hartford, and Hartford. Findings of Fact, Opinion, Decision and Order Approved 05/30/90
PETITION NO. 275 – The Connecticut Light and Power Company petition for proposed modification at four pole locations, along two existing 115-kV transmission lines from Manchester Substation to Northwest Hartford Substation and Bloomfield Substation to Northwest Substation (circuits 1751 and 1756), west of Goodman Street and Lincoln Terrace on Cottage Grove Road. Staff Report Approved 09/18/91
PETITION NO. 362 – The Connecticut Light and Power Company petition that no Certificate of Environmental Compatibility and Public Need is required for the modification of a 115 kilovolt electric transmission line extending from North Bloomfield Substation to the Silver and Agawan Substation in Agawam, Massachusetts. Staff Report Approved 01/22/97
PETITION NO. 472 – VoiceStream Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric transmission facility located east of Duncaster Road, Bloomfield, Connecticut. Staff Report Approved 07/25/00
PETITION NO. 711 – PPL Distributed Generation, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 250-kW fuel cell located at 1414 Blue Hill Avenue, Bloomfield, Connecticut. Staff Report Approved 05/11/05
PETITION NO. 847 – Pepperidge Farm, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 1.2 megawatt fuel cell located at 1414 Blue Hills Avenue, Bloomfield, Connecticut. Staff Report Approved 02/14/08
PETITION NO. 858 – The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing North Bloomfield 2A Substation located at 2 Hoskins Road in the Town of Bloomfield, Connecticut. Staff Report Approved 07/10/08
PETITION NO. 921 – DFC-ERG CT, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Fuel Cell generating facility located at 535 Simsbury Road, Bloomfield, Connecticut. Staff Report Status Update - Not Constructed Approved 12/03/09
PETITION NO. 1020 – MetroPCS Massachusetts, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the extension of an existing telecommunications facility located at 12 Burr Road, Bloomfield, Connecticut. Staff Report Approved 01/19/12
PETITION NO. 1057 – The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Northeast Simsbury Substation and replacement of structures in Simsbury and Bloomfield; and re-conductoring of a 115-kV transmission line from Northeast Simsbury Substation (Simsbury, Connecticut) to the North Bloomfield Substation, Bloomfield, Connecticut. Staff Report Approved 02/07/13
PETITION NO. 1084 – Bloom Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 200 kW Fuel Cell to be located at the Home Depot store, 55 Granby Street, Bloomfield, Connecticut. Staff Report Status Update - Constructed Approved 12/12/13
PETITION NO. 1112 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement and extension of an existing telecommunications facility located off of St. Andrews Road, Bloomfield, Connecticut. Filing Staff Report D&M Revision Approval Second D&M Revision Approval Approved 09/04/14
PETITION NO. 1202 – FuelCell Energy, Inc. petition for a Declaratory Ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 1.4 MW fuel cell combined heat and power electric generating facility located at Pepperidge Farm, Inc., 1414 Blue Hills Avenue, Bloomfield, Connecticut. Comments from the Drinking Water Section of the Department of Public Health Date for Decision SHPO Response Staff Report and Decision Notice of Construction Commencement Pipe Cleaning Procedures Approved 01/21/16
PETITION NO. 1217 – Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed separation of the existing 1779/1777 115 kilovolt (kV) electric transmission lines for 1.6 miles within existing right of way from Bloomfield Substation to Bloomfield Junction; proposed separation of the existing 1751/1777 115kV electric transmission lines for 5.3 miles within existing right of way from Bloomfield Junction to North Bloomfield Substation; modifications to the existing overhead 1779 115 kV electric transmission line to loop into the Rood Avenue Substation via underground cables; including related transmission line structure improvements; and modifications to the Bloomfield Substation, 40 Crestview Drive and North Bloomfield Substation, 2 Hoskins Road both in Bloomfield, Connecticut and modifications to the Rood Avenue Substation located at 275 Rood Avenue, Windsor, Connecticut. Approved 04/28/16
PETITION NO. 1279 – Bloom Energy Corporation, as an agent for The TJX Companies Inc., petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 500-Kilowatt Fuel Cell Facility to be located at the TJX building, 1415 Blue Hills Avenue, Bloomfield, Connecticut. Approved 02/16/17
SUB-PETITION NO. 1293-BL-01 (Bloomfield) – Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements to comply with the updated National Electric Safety Code clearance requirements. Decision Notice of Construction Completion
SUB-PETITION NO. 1293-BW-01 (Bloomfield - Windsor) – Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements to comply with the updated National Electric Safety Code clearance requirements. Decision Notice of Construction Completion
SUB-PETITION NO. 1293-FWHABS-01 (Farmington, West Hartford, Avon, Bloomfield, Simsbury) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Decision Notice of Construction Completion
SUB-PETITION NO. 1293-BWSWM-01 (Bloomfield, Windsor, South Windsor, Manchester) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Decision Second Extension Request and Council Decision Notice of Construction Completion
SUB-PETITION NO. 1293-BH-01 (Bloomfield, Hartford) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Decision Notice of Construction Completion
SUB-PETITION NO. 1293-BL-02 (Bloomfield) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Construction Completion
SUB-PETITION NO. 1293-BM-01 (Bloomfield, Manchester) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Amendment Request Council Amendment Decision Extension Request and Council Decision Notice of Construction Completion
SUB-PETITION NO. 1293-BL-03 (Bloomfield) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Construction Completion
PETITION NO. 1476 – New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed extension and modifications to an existing telecommunications facility located at 2627 Day Hill Road, Bloomfield, Connecticut. Approved 03/10/22
PETITION NO. 1488 – T-Mobile Northeast, LLC (T-Mobile) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility on electric transmission line structure No. 3147, owned by Eversource Energy within an existing Eversource Energy electric transmission line right-of-way located at 140 Duncaster Road, Bloomfield, Connecticut. Approved 05/12/22
PETITION NO. 1526 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a wireless telecommunications facility and associated equipment on the roof of an existing commercial building located at 1300 Hall Boulevard, Bloomfield, Connecticut. Approved 08/18/22
Dept. of Public Safety, Div. of State Police notice of intent to modify an existing telecommunications facility at Talcott Mountain, Bloomfield.
Springwich Cellular Ltd. Partnership notice of intent to modify an existing telecommunications facility located at 8 Hoskins Rd. (Talcott Mt.), Bloomfield.
Springwich Cellular Ltd. Partnership notice of intent to modify an existing telecommunications facility located at Blue Hills Avenue, Bloomfield.
BANM notice of intent to modify an existing telecommunications facility located at 8 Hoskins Rd., Bloomfield.
Bell Atlantic NYNEX Mobile - Antenna Upgrades - Talcott Mountain Science Center, Bloomfield, Connecticut. November 22, 1995 Antenna Upgrade Filing
Springwich Cellular Ltd. Partnership notice of intent to modify an existing telecommunications facility located at the Bloomfield Cemetery, Brewer Drive, Bloomfield.
TS-OCI-011-000208 – Omnipoint Communications request for an order to approve tower sharing at an existing telecommunications facility located at 28 Brewer Drive in Bloomfield, Connecticut.
TS-XM-011-001005 – XM Satellite Radio (XM) request for an order to approve tower sharing at an existing telecommunications facility located at Blue Hills Fire Station, Blue Hills Road, Bloomfield, Connecticut.
TS-XM-011-001005 – XM Satellite Radio (XM) request for an order to approve tower sharing at an existing telecommunications facility located at Blue Hills Fire Station, Blue Hills Road, Bloomfield, Connecticut.
EM-VER-011-010228 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at the Talcott Mountain Science Center for Student Involvement, Inc., Bloomfield, Connecticut.
TS-AT&T-011-010321 – AT&T Wireless PCS, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 1021 Blue Hills Avenue, Bloomfield, Connecticut.
EM-VER-011-010619 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 8 Hoskins Road, Bloomfield, Connecticut.
EM-SPRINT-011-010924 – Sprint Spectrum L.P. notice of intent to modify an existing telecommunications facility located at 1021 Blue Hills Avenue, Bloomfield, Connecticut.
EM-VOICESTREAM-011-011029 – VoiceStream Wireless Corporation notice of intent to modify an existing telecommunications facility located at 1021 Blue Hills Avenue, Bloomfield, Connecticut
EM-VOICESTREAM-011-020304 – VoiceStream Wireless Corporation notice of intent to modify an existing telecommunications facility located at 28 Brewer Street, Bloomfield, Connecticut.
EM-AT&T-011-049-148-155-020703 – AT&T Wireless PCS, LLC d/b/a AT&T Wireless notice of intent to modify existing telecommunications facilities located in Bloomfield, Enfield, Wallingford, and West Hartford, Connecticut.
EM-CING-011-056-020718 – SNET Mobility, LLC notice of intent to modify existing telecommunications facilities located in Bloomfield and Granby, Connecticut.
EM-T-MOBILE-"UNIVERSAL"-020830 – Omnipoint Facilities Network 2., L.L.C. and Omnipoint Communications, Inc., subsidiaries of T-Mobile USA, Inc. notice of intent to modify existing telecommunications facilities throughout Connecticut.
EM-CING-011-102-105-021011 – Southwestern Bell Mobile Systems, LLC notice of intent to modify existing telecommunications facilities located in Bloomfield, North Stonington, and Old Lyme, Connecticut.
EM-VER-011-021017 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 785 Park Avenue, Bloomfield, Connecticut.
EM-POCKET-011-090626 – Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications notice of intent to modify an existing telecommunications facility located at 1021 Blue Hills Avenue, Bloomfield, Connecticut. Decision
EM-VER-011-091208 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing
EM-CLEARWIRE-011-100312 – Clearwire Corporation notice of intent to modify an existing telecommunications facility located at 1021 Blue Hills Avenue, Bloomfield, Connecticut. Decision
EM-CLEARWIRE-011-100401 – Clearwire Corporation notice of intent to modify an existing telecommunications facility located at 785 Park Avenue, Bloomfield, Connecticut.
EM-CLEARWIRE-011-100611 – Clearwire Corporation notice of intent to modify an existing telecommunications facility located at 30 Mountain Road (28 Brewer Street), Bloomfield, Connecticut. Decision
EM-CING-011-100628 – New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 12 Burr Road, Bloomfield, Connecticut.