Virtual Public Information Meetings

 

Welcome to the CT Department of Transportation’s Virtual Public Meetings page

Per Governor Lamont’s Executive Order No. 7B, the requirement to make project documents available at public view locations/physical locations and the state requirement to hold in-person open meetings have been suspended. 

Public Meetings can be held remotely and will be recorded.  These meetings shall be posted on the Department’s website within 7 days.

Please note, some meetings may have reached or passed their required public comment period. Please refer to each recording to make that determination.  If you would like information on any of these projects, please contact the project manager directly if the public comment period is closed.

 

Virtual Public Information Meeting Videos

DOT Line Image

 Walk Bridge Program VPIM June 16, 2020 Graphic U.S. ROUTE 1 (POST ROAD) ROAD DIET IMPLEMENTATION, Fairfield CT  CTDOT Project 0040-0146 Route 82 over Strongs Brook, East Haddam
WALK BRIDGE PROGRAM - MANRESA ISLAND
NORWALK, CT
June 16, 2020
Proposed use of Manresa Island as a construction staging area for the upcoming Walk Bridge Replacement Project.
CT STATEWIDE ROAD DIET FEASIBILITY STUDY STATE PROJECT #0170-3480
US RTE 1 (POST RD), FAIRFIELD, CT
June 17, 2020
Convert existing multi-lane undivided roadway to two through lanes with a center turn lane or other treatment.
REPLACEMENT OF BRIDGE NO. 02510 STATE PROJECT #0040-0146
RTE 82 OVER STRONGS BROOK, EAST HADDAM, CT
June 29, 2020
Due to structural deterioration, Bridge #02510 carrying Rte 82 over Strongs Brook in East Haddam, CT needs to be replaced.
     
     
AVON OLD FARMS ROAD REALIGNMENT & IMPROVEMENTS
AVON, CT
July 22, 2020
Realignment and improvements to Old Farms Road north of Thompson Road including the Scoville Road Intersection (~3,025 ft {0.57 miles})
CLAPBOARD RIDGE ROAD (RTE 39) INTERSECTION IMPROVEMENTS
DANBURY, CT
July 29, 2020
Intersection improvements on Route 39 (Clapboard Ridge Road) at East Gate Road and Beckerle Street

STONE MASONRY WALL REHABILITATION STATE PROJECT 0058-0335
GROTON, CT
August 27, 2020
Rehabilitation of the stone masonry wall on U.S. Route 1 (West Main Street)

     
     
REHABILITATION OF BRIDGE NO. 00230
WESTBROOK, CT
September 3, 2020
Deck replacement of Bridge No. 00230 Carrying Willard Ave over I-95
Public Involvement Procedures 2021-2024 DRAFT Statewide Transportation Improvement Program
NEWINGTON, CT
September 23, 2020
I-91/I-691/ROUTE 15 INTERCHANGE IMPROVEMENTS STATE PROJECT 0079-0240/245/246
Meriden & Middletown, CT
October 8, 2020
     
       
ROUTE 349 ROAD DIET FEASIBILITY STUDY STATE PROJECT 0170-3480
GROTON, CT
October 5, 2020
Convert existing multi-lane undivided roadway to two through lanes with a center turn lane or other treatment.