Connecticut Department of Transportation
Telephone: (860)594-3017
or email to: DOT.ConsultantSelection@ct.gov
Effective January 1, 2024 the Recent Selection Criteria has been updated:
Recent Selection is now divided into 2 distinct categories: Design Categories (including Bridge Inspection) and Construction Inspection Categories. The recent selection look back rules now apply to each category independently.
RECENT SELECTION FOR DESIGN CATEGORIES -
- The ‘look back’ window is 12 months.
- A firm may be selected for 2 assignments within a 12 month rolling period.
- A firm may only be selected for one assignment in the same prequalification category in a 6 month period.
RECENT SELECTION FOR CONSTRUCTION INSPECTION CATEGORIES:
- The 'look back' window is 12 months
- A firm may be selected for 2 assignments within a 12 month rolling period.
Recent Selection is waived for both Design and Construction Inspection Categories for the following conditions:
- Assignments which fall under the Construction Engineering and Inspection (Rails) or Construction Engineering and Inspection (Facilities) prequalification categories
- Assignments advertised via legal notice
- If less than the minimum number of firms statutorily required to be interviewed submit proposals in response to a solicitation.
- 4.10.24 Consultant firms volume adjustment factors
- NOTE: Firms not on this list will be given the maximum adjustment per complexity category (low-15; medium-10; high-5).
- Volume Adjustment Range Chart.
Consultant Selection Process Scoring Revisions Presentation 2.18.22
Solicitation Look Ahead 4.16.24
- CSO 2437 - Task Order Engineering Services for Bridge & Structure Design - Major Bridge & Railroad Bridge
- CSO 2435 - Construction Engineering & Inspection for Project 56-319 & 56-326
- CSO 2444 - Construction Engineering & Inspection for Project 301-509 - REVISED
- CSO 2446 - Inspection of Surface & Below Water Components of Statewide Structures
- CSO 2445 - Transportation Asset Management Support Services
- CSO 2452 - Construction Engineering & Inspection for Project 172-524
- CSO 2439 - Task Order Railroad Construction Engineering & Inspection Services & Other Specialized Tasks
- CSO 2454 - Construction Engineering & Inspection for Project 130-193
130-193 Project Info - Information Only, Subject to Change
- Past Consultant Selections - 4.8.24
Annual Consultant Prequalification Information for 2024 is CLOSED - Applications are no longer being accepted - Submittal deadline for the 2024 calendar year was October 16, 2023.
- Consultant Selection Office Procedures Manual June 2016
- Selection-Negotiation Requirements(rev 4-18).pdf
- Consultant Notices
Affidavits OPM Website
CSO 255 Submittal Form - June 2022 (word)