Construction News from the Connecticut Department of Transportation - 2021
Page 5 of 27
-
10/27/2021
The Roadway Detour on U.S. Route 1 for the Replacement of Railing on Retaining Wall in the Town of Groton (Mystic) to Begin at 8 p.m. October 24, 2021 Roadway Detour Railing Replacement in Groton and Mystic
The Connecticut Department of Transportation is announcing that a roadway detour for the work to replace substandard railing mounted on existing retaining wall along U.S. Route 1 in the Town of Groton (Mystic) to Begin at 8 p.m. October 24, 2021.
- 10/27/2021 CTDOT Replaces Section of Retaining Wall on Route 44 in Putnam
-
10/17/2021
Installation and revisions Traffic control signals various locations
The Connecticut Department of Transportation is announcing that the installation and revisions of traffic signals throughout Central Connecticut is scheduled to start Friday, October 22, 2021.
-
10/15/2021
Three Consecutive Weekend Lane and Shoulder Closures, Route 2 EB and WB at West Road in the Town of Marlborough
Three Consecutive Weekend Lane and Shoulder Closures, Route 2 EB and WB at West Road in the Town of Marlborough
-
10/14/2021
Weekend Lane Closures for the Installation of Culvert on I-395 in the Vicinity of Canterbury Turnpike in the City of Norwich
The Connecticut Department of Transportation announces weekend lane closures and lane shifts approximately a half mile south of Exit 18 on I-395 starting October 15, 2021.
-
10/14/2021
CTDOT Begins Installation of Incident Management System Along Routes 9 and 72
The Connecticut Department of Transportation is announcing the commencement of work for the installation of an Incident Management System Along Routes 9 & 72 starting November 4, 2021.
-
10/14/2021
Intersection Improvements on Route 34 at SR 490 and Toddy Hill Road and SR 490 at I-84 Interchange in the Town of Newtown
The Connecticut Department of Transportation announces the start of roadway construction activities for Intersection Improvements on Route 34 at SR 490 and Toddy Hill Road and SR 490 at I-84 Interchange. Work will start the week of October 18, 2021.
-
10/14/2021
Three Consecutive Weekend Lane and Shoulder Closures, Route 2 EB and WB at West Road in the Town of Marlborough
The Connecticut Department of Transportation announces three consecutive weekend lane and shoulder closures on Route 2 at West Road to facilitate the replacement of Bridge Numbers 01708 and 03374. The closures will begin at 7 p.m. Friday, October 15, 2021 and end 8 a.m. November 1, 2021.
-
10/14/2021
Weekend Lane Closures on Route 8 Southbound in Waterbury Beginning October 15, 2021
For two weekends, beginning at 8:00 PM on Friday, October 15, until 6:00 AM Monday, October 18, AND from 8:00 PM on Friday, October 22, until 6:00 AM Monday, October 25, there will be lane closures on Route 8 Southbound in Waterbury to facilitate rehabilitation of Bridges over Platts Mill Rd and Metro-North Railroad.
-
10/14/2021
Reconstruction of Interchange 33 of I-95 Update
The Connecticut Department of Transportation announces the continuing of work for the Reconstruction of Interchange 33 of I-95 in the Town of Stratford.
-
10/14/2021
Emergency Guiderail Repair in Danbury
The Connecticut Department of Transportation announces that Emergency Guiderail Repair will be performed on I-84 Eastbound between exits 3-8 in the City of Danbury.
-
10/9/2021
Pavement Preservation Project and Concrete Roadway Repairs on Route 25 Northbound/Southbound Ramps in Trumbull
The Connecticut Department of Transportation is announcing that a pavement preservation project will be performed on Route 25 Ramps Southbound Exit#9 (Daniels Farm Rd.) & Route 25 Northbound Exit #7B-A Route# 15 Southbound NYC/ Route #127 (White Plains Rd.) Also, Route #15 Southbound Exit# 49 to Route#25 Northbound.
-
10/9/2021
Scheduled Lane Closures on Bridge over Lake Saltonstall in East Haven
The Connecticut Department of Transportation is announcing a single lane closure on Interstate 95 Northbound and Southbound over Lake Saltonstall in East Haven beginning October 15.
-
10/9/2021
Milling and Resurfacing Project on I-95 in Stonington, North Stonington, and the Boom Bridge Overpass
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on I-95 northbound in Stonington and North Stonington, and southbound at the Boom Bridge overpass in North Stonington.
- 10/9/2021 Construction and Maintenance Activities Restricted for State Holiday Weekend October 8-12, 2021