WATERTOWN

DOCKET NO. 156 - An Application of Litchfield County Cellular, Inc., for cellular telecommunications tower and equipment on Pine Hill west of South Street, Plymouth; on Wallens Hill north of Oakdale Avenue, Winsted; east of Loon Meadow Road, Norfolk; north of Sunnyside Avenue, Watertown (DENIED); and on Town Hill south of Legion Road, New Milford. (Findings of Fact)(Opinion),  and  (Decision and Order).

DOCKET NO. 354 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a telecommunications facility at one of two locations off of Old Baird Road in Watertown, Connecticut. (Record), (Findings of Fact), (Opinion), (Decision and Order)Verizon Termination of Approval - No Longer interested in developing site 11/21/12

DOCKET NO. 422 - American Towers, LLC Certificate of Environmental Compatibility and Public Need for the construction, maintenance and management of a telecommunications facility located at 655 Basset Road, Watertown, Connecticut.  (Record),   (Findings of Fact),   (Opinion),   (Decision and Order).

DOCKET NO. 466 - The Connecticut Light & Power Company d/b/a Eversource Energy application for a Certificate of Environmental Compatibility and Public Need for the Frost Bridge to Campville 115-kilovolt (kV) electric transmission line project that traverses the municipalities of Watertown, Thomaston, Litchfield, and Harwinton, which consists of (a) construction, maintenance and operation of a new 115-kV overhead electric transmission line entirely within existing Eversource right-of-way and associated facilities extending approximately 10.4 miles between Eversource’s existing Frost Bridge Substation in the Town of Watertown and existing Campville Substation in the Town of Harwinton; (b) related modifications to Frost Bridge Substation and Campville Substation; and (c) reconfiguration of a 0.4 mile segment of two existing 115-kV electric transmission lines across the Naugatuck River in the Towns of Litchfield and Harwinton within the same existing right-of-way as the new 115-kV electric transmission line. (Findings of Fact), (Opinion), (Decision and Order).

PETITION NO. 27 - The Connecticut Light and Power Company petition for construction of a 115-kV line from Frost Bridge Substation to Bunker Hill Substation and crossing facilities of the Penn Central Transportation Company and the Southern New England Telephone Company in Watertown and Waterbury. Staff Report.  Approved 5/19/74

PETITION NO. 98 - Northeast Utilities petition for modifications to the Frost Bridge Substation-Long Mountain Substation 345-kV transmission line off Fenn Hill Road in Watertown. Staff Report.  Approved 2/10/84

PETITION NO. 153 - The Connecticut Light and Power Company petition for modification of the Frost Bridge-Campville 115-kV line in Watertown, Thomaston, Litchfield, and Harwinton. Staff Report.  Approved 4/9/86

PETITION NO. 229 - The Connecticut Light and Power Company petition for the proposed addition of 115-kV capacitors and associated equipment at the Frost Bridge Substation, Watertown. Staff Report.  Approved 3/27/89

PETITION NO. 246 - The Connecticut Light and Power Company petition for modification of the Frost Bridge-Campville 115-kV line in Watertown, Thomaston, Litchfield, and Harwinton.  Staff Report.  Approved 3/26/90

PETITION NO. 368 - CL&P petition that no Certificate of Environmental Compatibility and Public Need is required for a proposed addition to CL&P’s Frost Bridge Substation in Watertown. Staff Report.  Approved 2/5/97

PETITION NO. 502 - Sprint Spectrum L.P. (Sprint PCS) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric transmission facility located off of Sunnyside Avenue, Watertown, Connecticut. Staff Report.  Approved 3/15/01.

PETITION NO. 661 - Connecticut Light & Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed substation expansion, the installation of 115-kV capacitor banks and the installation of associated equipment at CL&P’s Frost Bridge 8R Substation in Watertown, Connecticut.  Staff Report.  Approved 03/04/04

PETITION NO. 686 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a power transformer and associated equipment at CL&P’s Shaws Hill 24H substation in Watertown, Connecticut. Staff ReportApproved 08/12/04.

PETITION NO. 761 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Frost Bridge Substation, located on Frost Bridge Road, Watertown, Connecticut.  Staff Report.  Approved 4/27/06

PETITION NO. 818 - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing CL&P Frost Bridge 8R Substation located at Frost Bridge Road, Watertown, Connecticut. Staff Report.  Approved 7/03/07

PETITION NO. 834 – Watertown Renewable Power, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 30 MW biomass gasification generating project located at Echo Lake Road, Watertown, Connecticut. RecordFindings of FactOpinionDecision.  Approved 4/24/08.

PETITION NO. 1058 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed 1990 line structure replacement project consisting of modifications of two sections of an existing 115-kV transmission line from Stevenson Substation to Frost Bridge Substation and from Baldwin Junction to Baldwin Substation traversing the municipalities of Monroe, Oxford, Middlebury, Waterbury and Watertown, Connecticut. Staff Report.  Final Report. D&M Change - Lighting D&M Change-Lighting Decision Amendment - Modifications to Add Structure Lighting per FAA Determinations Approved 6/13/13

PETITION NO. 1417 – DG Connecticut Solar III, LLC Watertown Solar One, LLC and VCP, LLC d/b/a Verogy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.975 megawatt AC solar photovoltaic generating facility located at 669 Platt Road, Watertown, Connecticut, and associated electrical interconnection.  Approved 12/03/20

PE1133-VER-20171214 - Cellco Partnership d/b/a Verizon Wireless sub-petition for a declaratory ruling for approval of an eligible facility request for modifications to an existing telecommunications facility located at 655 Bassett Road, Watertown, Connecticut. DecisionCompletion Letter

SUB-PETITION NO. 1293-NMWRWW-01 (New Milford, Washington, Roxbury, Woodbury and Watertown) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Amendment Request Council Decision on Amendment Request Completion Letter

SUB-PETITION NO. 1293-NMWRWW-02 (New Milford, Washington, Roxbury, Woodbury and Watertown) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision  Notice of Completion

PETITION NO. 1433 The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 1191 Line Rebuild Project, consisting of the replacement and reconductoring of electric transmission line structures along approximately 10 miles of its existing No. 1191 115-kilovolt (kV) single-circuit electric transmission line within existing Eversource electric transmission line right-of-way between the existing Frost Bridge Substation in Watertown and the existing Campville Substation in Harwinton, Connecticut, traversing Watertown, Thomaston, Litchfield and Harwinton, Connecticut, and related electric transmission line structure improvements.  Approved 01/28/21

PETITION NO. 1577 The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Frost Bridge to Noera Rebuild Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 5 miles of its existing electric transmission line right-of-way shared by its existing 115-kilovolt (kV) 1163 and 1550 Lines between Frost Bridge Substation in Watertown to Noera Substation in Waterbury, traversing the municipalities of Watertown, Thomaston, Plymouth and Waterbury,Connecticut, and related electric transmission line and substation improvements. Approved 08/31/23

Litchfield Acquisition Corp., notice of intent to modify an existing water tank in Watertown.

EM-NEXTEL-153-991210 - Nextel Communications notice of intent to modify an existing telecommunications facility located off the Buckingham Street Extension in Watertown, Connecticut.

EM-AT&T-005-018-031-055-068-092-111-125-153-162-168-011121 - Edwards and Kelcey on behalf of AT&T Wireless notice of intent to modify existing telecommunications facilities located at twelve sites throughout the State of Connecticut. (Buckingham St., Watertown)

EM-AT&T-"UNIVERSAL"-030221 - AT&T Wireless PCS LLC d/b/a AT&T Wireless notice of intent to modify existing telecommunications facilities throughout Connecticut.

TS-T-MOBILE-153-060207 - Omnipoint Communications, Inc. (T-Mobile) request for an order to approve tower sharing at an existing telecommunications facility located at 27 Siemon Company Drive, Watertown, Connecticut.

 

EM-CING-152-090106 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 15 Miner Lane, Waterford, Connecticut.

 

EM-CING-153-110527 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 78 Westbury Park Road, Watertown, Connecticut.

 

EM-SPRINT-152-140807Sprint Spectrum, L.P. notice of intent to modify an existing telecommunications facility located at 447 Sunnyside Avenue, Watertown, Connecticut. Decision.

 

EM-T-MOBILE-153-140902 – T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 27 Siemon Company Drive, Watertown, Connecticut.  DecisionCompletion Letter.

 

EM-CING-153-170203 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 27 Seimon Company Drive, Watertown, Connecticut. DecisionCompletion Letter

 

EM-CING-153-170309 - New Cingular Wireless PCS, LLC (“AT&T") notice of intent to modify an existing telecommunications facility located at 655 Bassett Road, Watertown, Connecticut. Decision Completion Letter

EM-AT&T-153-180709 – AT&T Mobility notice of intent to modify an existing telecommunications facility located at 76 Westbury Park Road, Watertown, Connecticut. DecisionCompletion Letter

EM-CING-153-190408 - New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 27 Siemon Company Drive, Watertown, Connecticut. Decision

EM-SPRINT-153-191008 – Sprint notice of intent to modify an existing telecommunications facility located at 0 Sunnyside Avenue, Watertown, Connecticut. Decision  Will Not Complete

EM-T-MOBILE-153-201007 – T-Mobile notice of intent to modify an existing telecommunications facility located at 27 Siemon Company Drive, Watertown, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement  Decision  Notice of Construction Start  Notice of Completion

EM-CING-153-201105 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 655 Bassett Road, Watertown, Connecticut. Decision  Notice of Completion

EM-T-MOBILE-153-210729 - T-Mobile notice of intent to modify an existing telecommunications facility located at 27 Siemon Company Drive, Watertown, Connecticut.  Decision Notice of Completion

EM-VER-153-210805 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 655 Bassett Road, Watertown, Connecticut. Incomplete Letter  Response to Incomplete and Council Acknowledgement  Decision - Denial

EM-VER-153-211223 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 655 Bassett Road, Watertown, Connecticut.  Site Plans  Decision  Notice of Completion

EM-AT&T-153-230214 – AT&T notice of intent to modify an existing telecommunications facility located at 27 Siemon Company Drive, Watertown, Connecticut.  Incomplete Letter  Response to Incomplete and Council Acknowledgement  Decision  Extension Request and Council Extension Decision