TORRINGTON
DOCKET NO. 101 - Bio-Gen Torrington Partnership application for a Certificate of Environmental Compatibility and Public Need for the construction of a 15.0 MW wood-burning electric generating facility in the City of Torrington, Connecticut. Withdrawn.
DOCKET NO. 103 - Bio-Gen Torrington Partnership Certificate for the construction of a 15.0 MW (gross) wood-burning electric generating facility in the City of Torrington, Connecticut. (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 277 - Sprint Spectrum, L.P. d/b/a Sprint PCS application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a wireless telecommunications facility off of Burr Mountain Road or Block 1, Lot 14 off of Jordan Lane and Laurelton Drive, Torrington, Connecticut. (Findings of Fact), (Opinion), (Dissenting Opinion) of Mr. Tait and Mr. Emerick), and (Decision and Order).
DOCKET NO. 394 - New Cingular Wireless PCS, LLC (AT&T) application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a telecommunications facility located at 933 Stillwater Pond Road, Torrington, Connecticut. (Record) WITHDRAWN.
PETITION NO. 26 - The Hartford Electric Light Company petition for construction of a 115-kV line crossing facilities of the Connecticut Light and Power Company, Penn Central Transportation Co., and the Southern New England Telephone Company in Canaan, Goshen, Cornwall, and Torrington. Staff Report. Approved 3/29/74
PETITION NO. 79 - Southern New England Telephone Company petition for the placement of microwave antennas on the roofs of existing buildings at 85 Main Street, Bristol, and 239 Prospect Street, Torrington, and on an existing telecommunications tower located on Wildcat Hill off Wildcat Hill Road in Harwinton. (Torrington) Staff ReportDecision Letter Approved 3/1/82
PETITION NO. 536 - Northeast Utilities Service Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed installation of a 115-kV capacitor bank and associated equipment at the existing Connecticut Light and Power Company Franklin Drive Substation, located on Franklin Drive, in Torrington, Connecticut. Staff Report Approved 01/03/02.
PETITION NO. 563 - The Torrington Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of two 70 kilowatt microturbine generators at 59 Field Street, Torrington, Connecticut. Staff Report Approved 06/25/02.
PETITION NO. 657 - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing CL&P Torrington substation located on the town line between the City of Torrington and the town of Litchfield, Connecticut. Staff Report Approved 02/03/04.
PETITION NO. 855 – The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing substation in the Town of Litchfield and City of Torrington, Connecticut. Staff Report Approved 5/8/08
PETITION NO. 923 - Fuel Cell Energy, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation and operation of a Fuel Cell test facility located at 539 Technology Park Drive, Torrington, Connecticut. Staff Report Approved 12/03/09
PETITION NO. 923A –Fuel Cell Energy, Inc. amended petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation and operation of a Fuel Cell test facility and associated equipment located at 539 Technology Park Drive, Torrington, Connecticut, and associated electrical interconnection.Approved 02/06/25
PETITION NO. 943 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a Customer-Side 400 kW Fuel Cell to be located at 931 Torringford Street, Torrington, Connecticut. Staff Report. Approved 05/06/10.
PETITION NO. 998 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power substation located at Franklin Drive, Torrington, Connecticut. Staff Report. Approved 08/11/11
PETITION NO. 1055 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of telecommunications facility at an existing 300-foot guyed tower located at 855 University Drive (UCONN), Torrington, Connecticut. Staff Report. Approved 01/24/13
PETITION NO. 1383 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 750-kilowatt fuel cell facility and associated equipment to be located at Charlotte Hungerford Hospital, 540 Litchfield Street, Torrington, Connecticut. Approved 10/24/19
PETITION NO. 1407 - DG Connecticut Solar III, LLC (formerly Torrington Solar One LLC and VCP, LLC d/b/a Verogy) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.975-megawatt AC solar photovoltaic electric generating facility on an approximately 66.4 acre parcel located generally south of East Pearl Road and east of Torringford Street (Route 183) in Torrington, Connecticut and associated electrical interconnection. Approved 08/13/20
PETITION NO. 1442 - SR Litchfield, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 19.8-megawatt AC solar photovoltaic electric generating facility on 6 contiguous parcels located both east and west of Wilson Road south of the intersection with Litchfield Town Farm Road in Litchfield, Connecticut, and both east and west of Rossi Road, south of the intersection with Highland Avenue in Torrington, Connecticut, and associated electrical interconnection. Approved 9/23/21
PETITION NO. 1596 – USS Torrington Solar, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.99-megawatt AC solar photovoltaic electric generating facility located on the former Torrington Landfill at 105 Vista Drive, Torrington, Connecticut, and associated electrical interconnection. Approved 01/18/24
PETITION NO. 1638 – LSE Sextans LLC and LSE Sextans II LLC (Lodestar Energy) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 3.0-megawatt AC solar photovoltaic electric generating facility and associated equipment located at Parcel Nos. 221-3-1 and 222-4-26, Lovers Lane, Torrington, Connecticut, and associated electrical interconnection. Approved 01/23/25
Litchfield County Cellular, Inc., notice of intent to modify an existing non-facility telecommunications tower located at 1210 Highland Avenue in Torrington. 1991 Filing and Decision 1994 Transfer of Exmod and Decision 1995 Filing
TS-NEXTEL-143-000817 - Nextel Communications request for an order to approve tower sharing at an existing telecommunications facility located at 1210 Highland Avenue, Torrington, CT.
TS-VOICESTREAM-143-001102 - VoiceStream Wireless Corporation request for an order to approve tower sharing at an existing telecommunications facility located at 1925-30 East Main Street, Torrington, Connecticut.
EM-MARCUS-143-020214 - Marcus Communications, LLC notice of intent to modify an existing telecommunications facility located at 1210 Highland Avenue, Torrington, Connecticut.
EM-AT&T-064-143-148-020225 - AT&T Wireless notice of intent to modify an existing telecommunications facilities located in Hartford, Torrington, and Wallingford, Connecticut.
EM-VER-143-240808 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 1927 (a/k/a 1931) East Main Street, Torrington, Connecticut. Decision Notice of Construction Commencement Notice of Completion
TS-T-MOBILE-143-250115 - T-Mobile request for an order to approve tower sharing at an existing telecommunications facility located at 1210 Highland Avenue, Torrington, Connecticut. Town Letter Incomplete Letter Response to Incomplete and Council Acknowledgement Decision
EM-ATT-143-250403 - AT&T notice of intent to modify an existing telecommunications facility located at 3345 Winsted Road (a/k/a Burr Mountain Road), Torrington, Connecticut.
EM-ATT-143-250411 – AT&T notice of intent to modify an existing telecommunications facility located at 218 Wheeler Road, Torrington, Connecticut.